1 Better Value for Money Workshop, CEC, Brussels, March 12, 2003 Interoperability and Track Maintenance Agent of Progress in &

Slides:



Advertisements
Similar presentations
Cross-Acceptance: UNIFE expectations Alice Polo Safety and Certification Manager.
Advertisements

EIMS EXPECTATIONS FROM CROSS-ACCEPTANCE WORK CROSS-ACCEPTANCE SEMINAR 17 NOV PHILIPPE GALLEY-EIM/RFF.
DMITRY MACHERET First deputy Chairman of the Russian Railways Joint Scientific Council, Doctor of Economic Sciences, Professor 17 October 2012 Russia –
Knowledge requirements for rolling stock maintenance TU Eindhoven – 19th of June 2007 by Bob Huisman NedTrain - Fleet Management.
European COoperation in the Field of Scientific and Technical Research Role and rules of procedure for Management Committee Carine Petit Science Officer.
OTM TASK FORCE EFRTC General Meeting Sofia, Markus Hofmann, EFRTC OTM Task Force Chairman Franz Messerli, UNIFE OTM Task Force Vice-Chairman.
Stakeholder Group Meeting 26. May 2010 Northern Regional Initiative in a European context Jeppe Danø.
UIC/CER - MB/RT - 11/2002 ___________________________ Noise Policy - European perspective Mads Bergendorff Environmental advisor UIC ___________________________.
OPTIRAIL WORKSHOP · OCTOBER 23, 2014 · BRUSSELS PROJECT OVERVIEW.
Reference Document Management 1 European Railway Agency (ERA) Cross-Acceptance Unit P. Mihm 17/11/2010.
THE MAINTENANCE PLANNING OF SERBIAN RAILWAY INFRASTRUCTURE IN ACCORDANCE WITH EUROPEAN STANDARDS University of Belgrade, Faculty of Civil Engineering University.
OPTIRAIL WORKSHOP · OCTOBER 23, 2014 · BRUSSELS WP5: “Integration and Usability validation of models”
OPTIRAIL WORKSHOP · OCTOBER 23, 2014 · BRUSSELS Overview of WP3: “Tool conceptual design” Task 3.1: Analysis of ICT systems regarding railways domain.
1 8 July 2010 Cross – Acceptance and Safety Ralf Schweinsberg Vice-President Eisenbahn-Bundesamt UNECE Group of Experts on Unified Railway Law Secon Session;
Croatian Government’s Priorities in the Regulatory Area UNECE-SIDA “South East Europe Regulatory Project” Ljubljana, 8 June 2004.
Vancouver, October 08th 2013 DB Systemtechnik GmbH Marc Geisler The challenge of transforming a rule-based system into a risk-based culture on an example.
Topic: Standard harmonisation | October 00, 2012 | VNIIZhT1 | JSC Railway Research Institute (VNIIZhT) Methods of Harmonising Standards in Railway Transport.
Railway research seminar in Moscow Eric Fontanel UNIFE General Manager.
OTM TASK FORCE Draft final report Markus Hofmann OTM Task Force Chairman EFRTC General Meeting Prague, 22 nd June 2012.
The European Railway Agency in development
EFRTC welcome & presentation EC project, AUTOMAIN workshop, Paris, 4 th October 2012 Imrich Korpanec, EFRTC Secretary General.
Funding of European Rail Infrastructure Michael Clausecker UNIFE Director-General.
Challenges and the benefits of interoperability for the railway industry and the rail transport Eric Fontanel UNIFE General Manager.
IRSC – Goa, 30 Sept – 6 October ‹#› The Rail Sector and the European Rail Safety Directive Simon Fletcher Senior Safety and Interoperability Manager,
CEN TC 256/SC 1 Brief from plenary meeting Brussels, EFRTC General Meeting Prague, 22 nd June 2012 Imrich KORPANEC, EFRTC Secretary General.
BEWAG (UIP) General assembly European Railway Agency Jean-Marie DECHAMPS, Head of Sector (Safety) Brussels, 27 April 2015.
1 Prague – 12 th March 2009 Jean Charles PICHANT – Head of Interoperability Unit European Railway Agency.
Romanian Court of Accounts years of existence.
Technologická platforma "Interoperabilita železniční infrastruktury" a zaměření její činnosti v dalším období Praha, Jozef Fazik, Chargé de Mission.
N° 1 The European railway Agency: an engine for the integrated railway area EFRTC, Vilamoura on June 24 TH 2005 Olivier PIRON 24 June 2005.
1 Noise and rail What about Belgium ? Martine Serbruyns Federal Public Service Mobility and Transport Brussels - 28 april 2014.
FSF Overview about European and International Railway Standardisation / Innovativon and Standardisation Rüdiger Wendt Secretary of ISO/TC 269 and CEN/TC.
1 Prague, March 12 th 2009 Jean Charles PICHANT – Head of Interoperability Unit The State of processing and approving TSIs.
ESF Workshop - Active Protection of Passive Radio Services Cagliari October 2004 Page 1 ESF WORKSHOP “ACTIVE PROTECTION OF PASSIVE SERVICES” Planned.
UIC ERTMS World Conference Certification and Assessment of GSM-R Begoña DOMINGO, GSM-R Project Officer Istanbul, 3/04/2014.
European Railway Safety Strategy EIM Safety Group (PhGALLEY and J-Å HALLDEN) 29 september 2009.
Recommendation 2014/897/EC (DV29bis) Key Principles.
Deregulation to the Economy and removal of Administrative Barriers, Russian Federation EuropAid/114008/C/SV/RU Setting up of national accreditation system.
RE-E / IRSC / 27/09/ /10/09 1 The necessary evolution of railway safety regulations in Europe A challenge – Risks to be controlled.
EFRTC General Meeting Welcome Jo Urlings, President EFRTC Zoetermeer, November 18 th, 2011.
1 Standardisation, Assessment, and Certification Legal Framework, Standards  Measurement Instrument Directive (2004/22/EC)  Interoperability Directive.
ESS-VIP ICT Project Work Package III Task Force Meeting, Luxembourg, 5 March 2013.
General Meeting Zurich Imrich KORPANEC CEN TC 256/SC 1 Brief from plenary meeting Brussels,
General Meeting Florence Secretary General report on Items 5 of the agenda Imrich KORPANEC.
Vehicle-Wayside Intercommunications: future EN Standard Marcos Albuquerque January 2002.
General Meeting Zurich Markus HOFMANN Chairman of OTM Task Force On Track Machine (OTM) autorisation and x-acceptance.
WG 2A ECOSTAT Meeting 4-5 March 2004 Meeting of the WFD CIS Working Group 2A ECOSTAT summary Presented by Anna-Stiina Heiskanen Joint Research Centre The.
UK industry meeting - Action A specifications Telematics applications for passengers (TAP TSI) Stefan JUGELT Nottingham, 16/02/2016.
European Rail Infrastructure Managers (EIM) The main actors of the international railway cooperation SIAFICourse Michael Robson Secretary General 23 April.
Workshop accreditation and recognition / conformity assessment Removing Technical Barriers - TSIs within New Approach and Safety Directive Dr.-Ing. Andreas.
1 EBA - Recognition procedure for AsBo´s according to CSM 402/2013 ERA – workshop CSM, April 2016 Michael Schmitz, Eisenbahn-Bundesamt,
HIGH SPEED RAIL ASSESSMENT NORGE
Slovenske železnice-Infrastruktura, d.o.o. Ljubljana 1 st of September 2014 SŽ-Infrastruktura, d.o.o. 1 Safety Management System of the Infrastructure.
Slide n° 1 Workshop to NABs & RBs on Reg. 402/2013 and Harmonised sectorial accreditation scheme for railway NOBOs - Valenciennes, April 2016 NAB/RB Training.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 14 – Transport Bilateral screening:
RINA & SINTEF Assessor på et grenseoverskridende prosjekt, Femern del2 Thor Myklebust Sertifiseringsleder, SINTEF : 00 – 14: 15 Sikkerhetskonferansen,
N° 1 Possible co-operation between rail and buses in the area of Telematics Applications for Passengers Presented by European Railway Agency (ERA) th.
Copyright © AEbt 2016 All Rights Reserved. AEbt Angewandte Eisenbahntechnik AEbt Angewandte Eisenbahntechnik (AEbt Applied Railway Technology) Further.
TRANSPORT SCIENCE: INNOVATIVE BUSINESS SOLUTIONS
ROAD – RAIL – URBAN TRANSPORT
European Rail Infrastructure Managers
NAB/RB Training Workshop In Valenciennes, April 2016
PRESENTATION OF MONTENEGRO
Pavel Kodym Interoperability expert
JSC Railway Research Institute
INSPIRE Maintenance and Implementation expert Group
Presented by European Railway Agency (ERA)
Integration of 1520/1524 requirements. Progress report.
Update on WS3 Activities
WG2 ADAS report – May Marseille
Presentation transcript:

1 Better Value for Money Workshop, CEC, Brussels, March 12, 2003 Interoperability and Track Maintenance Agent of Progress in & of Infrastructure Interoperability and Track Maintenance Hendrik Schäbe 1.Achieved Level of Interoperability 2.Status of Track Maintenance 3.Design and Maintenance 4.Needs 5.Example: Switch 6.Possibilities 7.Recommendations Contents

2 Better Value for Money Workshop, CEC, Brussels, March 12, 2003 Interoperability and Track Maintenance Agent of Progress in & of Infrastructure Achieved Level of Interoperability High speed directive implemented, TSIs exist, notified bodies are nominated by national institutions Second railway package is under discussion / approval European standards EN / EN / EN exist Approval by national bodies (excluding high speed) First interoperable tracks (high speed) exist

3 Better Value for Money Workshop, CEC, Brussels, March 12, 2003 Interoperability and Track Maintenance Agent of Progress in & of Infrastructure Status of Track Maintenance Track maintenance is a national task TSI on infrastructure subsystem defines track (rail) parameters Exchange of expert knowledge regarding diagnostics (e.g. switch diagnostics), track repair and renewal, Life Cycle Costs on voluntary basis Is there a need for a TSI on track maintenance, analogously to the TSI on rolling stock maintenance?

4 Better Value for Money Workshop, CEC, Brussels, March 12, 2003 Interoperability and Track Maintenance Agent of Progress in & of Infrastructure Design and Maintenance DesignQuality Maintenance

5 Better Value for Money Workshop, CEC, Brussels, March 12, 2003 Interoperability and Track Maintenance Agent of Progress in & of Infrastructure Needs Need for harmonisation on rolling stock maintenance is not disputable At least status of track must be harmonised: –Quality indicator –Tolerances –Measuring methods Example: Gauge

6 Better Value for Money Workshop, CEC, Brussels, March 12, 2003 Interoperability and Track Maintenance Agent of Progress in & of Infrastructure Example: Switch Existence of European switch would support maintenance harmonisation: Exchange spare parts Common diagnostic methods

7 Better Value for Money Workshop, CEC, Brussels, March 12, 2003 Interoperability and Track Maintenance Agent of Progress in & of Infrastructure Possibilities 1.Voluntary area Exchange of experts, methods, technology Can partially be sponsored by manufacturers of track diagnostic and maintenance technology First actions started by ProMain 2.Regulated / standardised area TSI on track maintenance Setting up standards on maintenance Allowing border crossing track maintenance Would require severe changes in national rules

8 Better Value for Money Workshop, CEC, Brussels, March 12, 2003 Interoperability and Track Maintenance Agent of Progress in & of Infrastructure Recommendations 1.Voluntary area: Support exchange of experts, workshops (also after end of ProMain) 2.Standardised area: Maintenance methods (measuring methods, repair, replacement) as a European standard 3.Regulated area: Prescribe in TSI (on inspection level): quality indicators, tolerances, notified bodies to audit and check

9 Better Value for Money Workshop, CEC, Brussels, March 12, 2003 Interoperability and Track Maintenance Agent of Progress in & of Infrastructure Support exchange of experts Organise workshops Give input for TSI (from workshops) Discuss TSI drafts Support in standardisation Options for