EGEE-II INFSO-RI-031688 Enabling Grids for E-sciencE www.eu-egee.org EGEE and gLite are registered trademarks La Grille EGEE Pierrick Micout, CEA – DSM.

Slides:



Advertisements
Similar presentations
An overview of the EGEE project Bob Jones EGEE Technical Director DTI International Technology Service-GlobalWatch Mission CERN – June 2004.
Advertisements

The LHC Computing Grid – February 2008 The Worldwide LHC Computing Grid Dr Ian Bird LCG Project Leader 15 th April 2009 Visit of Spanish Royal Academy.
Enabling, facilitating and delivering quality training in the UK and Internationally The challenge of grid training and education David Fergusson, Deputy.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE-III Program of Work Erwin Laure EGEE-II / EGEE-III Transition Meeting CERN,
EGEE-II INFSO-RI Enabling Grids for E-sciencE NA2 Tools & Services Owen Appleton, NA2 Deputy Manager EGEE/EGEE-II Transition meeting.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks NA2 – The Transition to EGEE III Sarah Purcell,
INFSO-RI Enabling Grids for E-sciencE NA3 Training and induction Malcolm Atkinson & David Fergusson NA3 Leader & Activity Manager,
1 Introduction to EGEE-II Antonio Fuentes Tutorial Grid Madrid, May 2007 RedIRIS/Red.es (Slices of Bob Jone, Director of EGEE-II.
INFSO-RI Enabling Grids for E-sciencE EGEE Induction Grid training for users, Institute of Physics Belgrade, Serbia Sep. 19, 2008.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks NA3 – Training & Induction Robin McConnell,
EGEE-II INFSO-RI Enabling Grids for E-sciencE NA2 Meeting Prague, 28 November 2007 Centrale Recherche S.A., Ecole Centrale Paris.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Related Projects Dieter Kranzlmüller Deputy.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Steven Newhouse EGEE’s plans for transition.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Technical Overview EGEE-II’s achievements.
INFSO-RI Enabling Grids for E-sciencE EGEE and Industry Bob Jones EGEE-II Project Director Final EGEE Review CERN, May 2006.
EGEE-II INFSO-RI Enabling Grids for E-sciencE Introduction EGEE/EGEE-II transition meeting – day 2 Bob Jones, EGEE-II Project Director.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE – paving the way for a sustainable infrastructure.
INFSO-RI Enabling Grids for E-sciencE Plan until the end of the project and beyond, sustainability plans Dieter Kranzlmüller Deputy.
Bob Jones Technical Director CERN - August 2003 EGEE is proposed as a project to be funded by the European Union under contract IST
SA1/SA2 meeting 28 November The status of EGEE project and next steps Bob Jones EGEE Technical Director EGEE is proposed as.
INFSO-RI Enabling Grids for E-sciencE NA5 – Policy and International Cooperation Panagiotis Louridas, Fotis Karagiannis, GRNET Final.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE II: an eInfrastructure for Europe and.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Bob Jones EGEE project director CERN.
INFSO-RI Enabling Grids for E-sciencE External Projects Integration Summary – Trigger for Open Discussion Fotis Karayannis, Joanne.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE Security Coordination Group Linda Cornwall CCLRC (RAL) FP6 Security workshop.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE and Collaborating Projects Erwin Laure.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks SA1: Grid Operations Maite Barroso (CERN)
INFSO-RI Enabling Grids for E-sciencE EGEE SA1 in EGEE-II – Overview Ian Bird IT Department CERN, Switzerland EGEE.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE Security Coordination Group Dr Linda Cornwall CCLRC (RAL) FP6 Security workshop.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE-III Proposal Draft Summary of activity.
EGEE-III-INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE-III All Activity Meeting Brussels,
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Gergely Sipos Activity Deputy Manager MTA.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE Support for New and Existing Users Gergely.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGI Operations Tiziana Ferrari EGEE User.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE-II Status Bob Jones – Project Director.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Training in EGEE-III Robin McConnell.
INFSO-RI Enabling Grids for E-sciencE An overview of EGEE operations & support procedures Jules Wolfrat SARA.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks How EGEE does Business Bob Jones EGEE-II.
INFSO-RI Enabling Grids for E-sciencE Policy and International cooperation Fotis Karayannis, NA5 activity leader All Activity Meeting.
INFSO-RI Enabling Grids for E-sciencE Plans for the EGEE-2 EGEE 2 Task Force 3rd EGEE Conference, Athens, April 2005.
SEE-GRID-2 The SEE-GRID-2 initiative is co-funded by the European Commission under the FP6 Research Infrastructures contract no
INFSO-RI Enabling Grids for E-sciencE The EGEE Project Owen Appleton EGEE Dissemination Officer CERN, Switzerland Danish Grid Forum.
EGEE is a project funded by the European Union under contract IST EGEE Summary NA2 Partners April
EGEE is a project funded by the European Union under contract IST Roles & Responsibilities Ian Bird SA1 Manager Cork Meeting, April 2004.
INFSO-RI Enabling Grids for E-sciencE Quality Assurance Gabriel Zaquine - JRA2 Activity Manager - CS SI EGEE Final EU Review
INFSO-RI Enabling Grids for E-sciencE Technical Overview Bob Jones, Technical Director, CERN EGEE 1 st EU Review 9-11/02/2005.
INFSO-RI Enabling Grids for E-sciencE The EGEE Project - Overview Mike Mineter National e-Science Centre Trinity College, Dublin.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks UK-Ireland-France Regional Participation.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Training Synergies with Collaborating Projects.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Operations Automation Team Kickoff Meeting.
EGEE-II INFSO-RI Enabling Grids for E-sciencE NA2: Dissemination Outreach & Communication Hannelore Hämmerle – NA2 Activity Manager.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks SA2 Networking support for EGEE III Xavier.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE: Enabling grids for E-Science Bob Jones.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks NA5: Policy and International Cooperation.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Technical Overview EGEE-II’s achievements.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks NGI Policy Workshop Introduction and scope.
EGEE-II INFSO-RI Enabling Grids for E-sciencE Training in EGEE-II Mike Mineter (Some slides from Brendan Hamill)
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks NA5: Policy and International Cooperation.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks NA5: Policy and International Cooperation.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks The EGEE project and the future of European.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Sy Holsinger NA2 Deputy Activity Manager.
INFSO-RI Enabling Grids for E-sciencE EGEE general project update Fotis Karayannis EGEE South East Europe Project Management Board.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Introduction to Grids and the EGEE project.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Enabling Grids for E-sciencE - EGEE Bob Jones,
INFSO-RI Enabling Grids for E-sciencE NA5 – Policy and International Cooperation Panagiotis Louridas, Fotis Karagiannis, GRNET Final.
Bob Jones EGEE Technical Director
Ian Bird GDB Meeting CERN 9 September 2003
Long-term Grid Sustainability
EGEE support for HEP and other applications
Cécile Germain-Renaud Grid Observatory meeting 19 October 2007 Orsay
Presentation transcript:

EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks La Grille EGEE Pierrick Micout, CEA – DSM - DAPNIA

Enabling Grids for E-sciencE EGEE-II INFSO-RI Plan Introduction au projet EGEE (transparents de Bob Jones) EGEE du point de vue technique (transparents d’Erwin Laure)

EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Introduction EGEE/EGEE-II transition meeting Bob Jones, EGEE-II Project Director CERN

Enabling Grids for E-sciencE EGEE-II INFSO-RI The EGEE project EGEE –1 April 2004 – 31 March 2006 –71 partners in 27 countries, federated in regional Grids EGEE-II –1 April 2006 – 31 March 2008 –91 partners in 32 countries –13 Federations Objectives –Large-scale, production-quality infrastructure for e-Science –Attracting new resources and users from industry as well as science –Improving and maintaining “gLite” Grid middleware

Enabling Grids for E-sciencE EGEE-II INFSO-RI EGEE Mission Infrastructure –Manage and operate production Grid for European Research Area –Interoperate with e-Infrastructure projects around the globe –Contribute to Grid standardisation efforts Support applications from diverse communities –Astrophysics –Computational Chemistry –Earth Sciences –Finance –Fusion –Geophysics –High Energy Physics –Life Sciences –Multimedia –… Business –Forge links with the full spectrum of interested business partners + Disseminate knowledge about the Grid through training + Prepare for sustainable European Grid Infrastructure

Enabling Grids for E-sciencE EGEE-II INFSO-RI A global, federated e-Infrastructure EGEE infrastructure ~ 200 sites in 39 countries ~ CPUs > 5 PB storage > concurrent jobs per day > 60 Virtual Organisations EUIndiaGrid EUMedGrid SEE-GRID EELA BalticGrid EUChinaGrid OSG NAREGI

Enabling Grids for E-sciencE EGEE-II INFSO-RI EGEE – What do we deliver? Infrastructure operation –Currently includes >200 sites across 39 countries –Continuous monitoring of grid services in a distributed global infrastructure –Automated site configuration/management Middleware –Production quality middleware distributed under business friendly open source licence User Support - Managed process from first contact through to production usage –Training –Documentation –Expertise in grid-enabling applications –Online helpdesk –Networking events (User Forum, Conferences etc.) Future –Expand on interoperability with related infrastructures

Enabling Grids for E-sciencE EGEE-II INFSO-RI Related EU projects EUGRID ISS e G BEinGRID

Enabling Grids for E-sciencE EGEE-II INFSO-RI EGEE-II Activities Service Activities –SA1 – Grid Operations, Support and Management (CERN) –SA2 – Networking Support (CNRS) –SA3 – Integration, Testing and Certification (CERN) Joint Research Activities –JRA1 – Middleware Re-engineering (INFN) –JRA2 – Quality Assurance (CS-SI) Networking Activities –NA1 – Management (CERN) –NA2 – Dissemination, Outreach and Communication (CERN) –NA3 – Training and Induction (UEdin) –NA4 – Application Identification and Support (CNRS) –NA5 – Policy and International Cooperation (GRNET)

Enabling Grids for E-sciencE EGEE-II INFSO-RI Industry and EGEE-II Industry Task Force –Group of industry partners in the project –Links related industry projects (NESSI, BEinGRID, …) –Works with EGEE’s Technical Coordination Group Collaboration with CERN openlab project –IT industry partnerships for hardware and software development EGEE Business Associates (EBA) –Companies sponsoring work on joint-interest subjects Technical developments & Transfer of know-how and services to industry Business modelling Exploitation strategies & Market Surveys Industry Forum –Led by Industry to improve Grid take-up in Industry –Organises industry events and disseminates grid information

Enabling Grids for E-sciencE EGEE-II INFSO-RI EGEE-II Project Office –Bob Jones – Project Director –Dieter Kranzlmueller – Deputy Project Director (until July’06) –Erwin Laure – Technical Director –Kristina Gunne – Directors’ Assistant –Anna Cook – Project Secretary –Dita Mocova – Finance Officer –Karin Burghauser – User registration and related projects –Marie-Laure Bourgeois-Schutz – User registration and web admin –Frank Harris – Network activities coordination –Hannelore Hämmerle – NA2 activity manager –Owen Appleton – NA2 –Jo Lawson – NA5 –Florida Estrella Cainglet, Roberta Faggian Marque - Related projects –Yari Estublier - Intern

Enabling Grids for E-sciencE EGEE-II INFSO-RI Sustainability: Beyond EGEE-II Need to prepare for permanent Grid infrastructure –Maintain Europe’s leading position in global science Grids –Ensure a reliable and adaptive support for all sciences –Independent of project funding cycles –Modelled on success of GÉANT  Infrastructure managed in collaboration with national grid initiatives Sustainable e-Infrastructure

Enabling Grids for E-sciencE EGEE-II INFSO-RI Important EGEE-II events EGEE final review (CERN) EGEE-II periodic review EGEE-II start1 April May Sept st March 2008EGEE-II completion 1 st Project Conference (Geneva) May 2007 May 2008EGEE-II final review Autumn st User Forum event (Manchester) 2 nd User Forum event 2 nd Project Conference (Budapest) 7-11 May2007 Q Prepare organisation to manage sustainable infrastructure 27 April 2006 Industry day (Paris)

Enabling Grids for E-sciencE EGEE-II INFSO-RI Summary EGEE Infrastructure – world’s largest multi-science production grid service EGEE-II is the opportunity to expand on this existing base both in terms of scale and usage Use this transition meeting as the occasion to meet your fellow partners and clarify any grey areas in the programme of work Need to prepare the long-term –EGEE, related projects, national grid initiatives and user communities are working to define a model for a sustainable grid infrastructure that is independent of project cycles

EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Technical Overview EGEE/EGEE-II transition meeting Erwin Laure, EGEE-II Technical Director CERN

Enabling Grids for E-sciencE EGEE-II INFSO-RI EGEE-II Activities Service Activities –SA1 – Grid Operations, Support and Management (CERN) –SA2 – Networking Support (CNRS) –SA3 – Integration, Testing and Certification (CERN) Joint Research Activities –JRA1 – Middleware Re-engineering (INFN) –JRA2 – Quality Assurance (CS-SI) Networking Activities –NA1 – Management (CERN) –NA2 – Dissemination, Outreach and Communication (CERN) –NA3 – Training and Induction (UEdin) –NA4 – Application Identification and Support (CNRS) –NA5 – Policy and International Cooperation (GRNET)

Enabling Grids for E-sciencE EGEE-II INFSO-RI Activity Ecosystem SA2 – Networking Support SA1 – Grid Operations, Support and Management JRA2 – Quality Assurance JRA1 – Middleware Re-engineering SA3 – Integration, Testing and Certification NA4 – Application Identification and Support NA5 – Policy and International Cooperation NA2 – Dissemination, Outreach and Communication NA3 – Training and Induction NA1 – Management

Enabling Grids for E-sciencE EGEE-II INFSO-RI EGEE-II Cross-Activities Groups Security –MWSG  Consistent usage of security framework in m/w  Coordination with related projects –JSPG  Operational security issues  Coordination with related projects –Vulnerability Gruop –Security head (Ake Edlund) is part of the PEB VO Support –OAG  Resource allocation to VOs –UIG  Organization of EGEE documentation –VO Managers Group – NEW!  Link between the project and VOs Industry Relations –Industry Forum –Industry Task Force – NEW! Technical Coordination – TCG – NEW! –See later

Enabling Grids for E-sciencE EGEE-II INFSO-RI EGEE-II Program of Work Formally defined in DoW: Defines 51 deliverables and 89 milestones –Deliverables have hard deadlines – any slip needs to be communicated to EU well in advance –Contain quarterly and periodic (1 year) reports (QR and PR) –Will be reviewed internally to assure they are of high quality –EU will evaluate us against deliverables; achievement of milestones needs to be reported to EU in quarterly reports Plan enough time to prepare these documents and allow for activity internal review Details can also be found at JRA2/EGEE-II/Deliverables/DeliverablesScope.htmhttp://egee-jra2.web.cern.ch/EGEE- JRA2/EGEE-II/Deliverables/DeliverablesScope.htm

Enabling Grids for E-sciencE EGEE-II INFSO-RI Highlights of EGEE-II Increased Application Support (NA4) Revamped Industry Forum and Industrial Task Force (NA2) Multi-platform support and Interoperability (SA3) Streamlined integration and testing (SA3) Unified middleware release – gLite 3.x More visibility at high profile events like supercomputing (NA2) Focus on reliability, deployability, security (JRA1) Related projects provide –Expansion of infrastructure –Application support –Integration and Test facilities –Extension of training towards more generic Grid education

Enabling Grids for E-sciencE EGEE-II INFSO-RI EGEE-II Technical Coordination The EGEE-II proposal defines a Technical Coordination Group (TCG): The TCG brings together the technical activities within the project in order to ensure the oversight and coordination of the technical direction of the project, and to ensure that the technical work progresses according to plan. Basically coordinating the work of SA1, SA2, SA3, NA4, and JRA1 –Membership from all these activities but still remain a “small” team –Additional experts will join based on the topic of discussion –Working groups will be spawn off to solve specific problems Focus on practical short term solutions –Long term projects will be sourced out to middleware providers The group defines the technical direction of EGEE –Not just a discussion forum! –Decisions taken by the group must be honoured by the affected activities

Enabling Grids for E-sciencE EGEE-II INFSO-RI Summary EGEE has a demanding program of work –Can build on a solid basis –EGEE-II is really a continuation project, not a new one Make sure all partners collaborate in your activities –Execution plan and define partner responsibilities –Partner metrics will be introduced EGEE continues to be the flagship Grid infrastructure project of EU –This brings a number of responsibilities  Concertation, standardization, interoperability with related projects etc.  Make sure this effort is part of your plans Success of EGEE will be decisive for long-term sustainability of Grid infrastructures –EGEE, related projects, national grid initiatives and user communities are working to define a model for a sustainable grid infrastructure that is independent of project cycles