DG Env.B21 Requirements of the Habitats Directive and planning and implementation of the projects Cohesion Fund and Environmental Impact Assessment TAIEX.

Slides:



Advertisements
Similar presentations
1 Information and Publicity in programming period.
Advertisements

December 2005 EuP Directive : A Framework for setting eco-design requirements for energy-using products European Commission.
Cohesion funds projects in the light of EU Environmental policy & acquis Michal NEKVASIL European Commission, DG Environment Cohesion Policy and Environmental.
1 European Commission, DGENV.D. 3 Strategic Environmental Assessment Directive 2001/42/EC on the assessment of the effects of certain plans and programmes.
Final Report Anton Schrag REGIO D1
SEA & ETC Strategic Environmental Assessment and European Territorial Cooperation programmes Annual meeting with the Managing Authorities of the ETC programmes.
1 Natura 2000, the Ecological Network of the European Union – opportunities for tourism Micheal OBriain Nature and Biodiversity Unit, DG Environment European.
EN Regional Policy EUROPEAN COMMISSION Information and Publicity SFIT, 15 June 2006 Barbara Piotrowska, DG REGIO
LLM 2010/11 EU Environmental Law I The EU on the International Stage.
1. European Commission GHS Implementation Status in the European Community ICCM Dubai UNITAR Side event 4-6 February 2006 Eva Sandberg European Commission.
European status of the North Wirral Shore Stewart Lowther C.Env MIEEM.
Interaction between EIA and Articles 6.3 and 6.4 of Habitats Directive Yvonne Scannell Law School, Trinity College, Dublin Arthur Cox, Solicitors, Dublin.
- Introduction- Meeting of the W.G. on the elaboration of a European Charter on Angling and Biodiversity Carolina Lasén Díaz Council of Europe Strasbourg,
Protecting Designated Areas Ciaran O’Keeffe Director, NPWS Séirbhís na bPáirceanna Náisiúnta agus Fiadhúlra An Roinn Comhshaoil, Oidhreachta agus Rialtais.
The LIFE Integrated Projects
EU Wetland conservation policy. Communication on the Wise Use and Conservation of Wetlands (1995) => first European document dedicated exclusively.
1 CEER How to balance the public’s concerns and critical infrastructure construction Matti Vainio, Deputy HoU DG ENV – C.5, European Commission.
CEEWEB Academy III Strengthening civil participation in the implementation of EU nature conservation directives through the experiences gained by the 10.
End users of MIDA – a government perspective Trevor Harrison Environment and Heritage Service Department of the Environment Northern Ireland.
Application form – Section F: Analysis of Environmental Impact – key requirements Adina Relicovschi, EIA Coordinator- JASPERS.
Legal instruments for site protection in the EU Boris Barov, BSPB/BirdLife Bulgaria.
DG Env.B21 EU nature directives András Demeter Enlargement coordinator Nature & Biodiversity Unit, Directorate-General Environment, European Commission.
Implementation of TARGET 2 of the EU 2020 Biodiversity Strategy Claudia Olazábal Unit – Biodiversity DG ENV European Commission Nature Directors Meeting.
European Commission Biodiversity and Nature Conservation in the EU today – Business & Biodiversity Alexandra Vakrou, EC, DG Environment IEF European Roundtable.
DG Env.B21 The impact of environmental strategy and legislation on land use András Demeter, enlargement coordinator Nature & Biodiversity Unit, Directorate-General.
TWReferenceNet Management and Sustainable Development of Protected Transitional Waters in Bulgaria Liliana Maslarova, PhD Nomos + Physis.
Compensation in Bulgarian Law Where are we ? KONSTANTIN ILCHEV.
Managing the Natura 2000 network: state of play, challenges and opportunities.
Kavala Workshop 1-2 June 2006 Legal protection of Transitional Waters [in the Cadses area]: A comparative analysis Dr. Petros Patronos / Dr. Liliana Maslarova.
TIDE & Natura 2000: A partnership for sustainable tidal river development? Antwerp, 18 February 2010 François Kremer European Commission DG Environment,
Natura EU ambitions for a coherent ecological network State of Play and Challenges Saskia Richartz Institute for European Environmental Policy.
LEGISLATIVE DEVELOPMENTS IN NATURE CONSERVATION AND HABITATS LAW IN 2011 Margaret Austin 29 March 2012.
Recommendation 2001/331/EC: Review and relation to sectoral inspection requirements Miroslav Angelov European Commission DG Environment, Unit A 1 Enforcement,
Prof. Dr. G. Van Hoorick Faculty of Law – Department of Administrative and Environmental Law pag. 1 COMPENSATORY MEASURES IN EUROPEAN NATURE CONSERVATION.
The Principles Governing EU Environmental Law. 2 The importance of EU Environmental Law at the European and globallevel The importance of EU Environmental.
Environmental Impact Assessment of public and private projects EIA Directive 85/337/EEC as amended by 97/11/EC and 2003/35/EC Recent developments Laura.
European Commission, DG Environment, Nature Unit
The European SEA Directive Simon Marsden School of International Business, University of South Australia Module 1: Basics of SEA.
SEA in the Czech Republic Prague, 24 September 2008.
Expert Group on Natura 2000 Management Meeting of 19 May 2011 Fact Sheet on Member State Natura 2000 Management Planning THE N2K GROUP.
Commission proposal for a new LIFE Regulation ( ) Presentation to Directors Meeting DK 22 May 2012.
Economics in support of biodiversity conservation policy The EC experience Expert Workshop on Biodiversity and Economics, EEA 5 October 2006 Alexandra.
Environmental Impact Assesment and Strategic Environmental Assesment – tools for biodiversity conservation Emilian Burdusel – Clubul ecologic UNESCO Pro.
The Habitats Directive in BANES A (brief) guide to the most commonly encountered legal issues.
Protection assessment of Natura 2000 network areas in Poland – main problems Marzena Modrowska Krzysztof Suliński Ministry of the environment in Poland.
DG ENV Environmental assessment procedures for energy infrastructure projects of common interest (PCIs)
Evaluation of restrictions: art. 15 and art TAIEX Seminar on the EU Service Directive, 3 May 2007 Carlos Almaraz.
Climate change: Rethinking Restoration
Natura 2000, the Ecological Network of the European Union
The LIFE program 13th Meeting of the Marine Strategy Coordination Group (MSCG), Brussels, 13/05/2014 Dørte PARDO LÓPEZ DG Environment, Unit E.3 European.
Principles and rationale for SAC/SPA designation and management
Sylvia Barova Unit B.3-Nature, DG ENV Habitats Committee
Sylvia Barova Unit B.3-Nature, DG ENV Habitats Committee
Guidance on Natura 2000 and Forests – Scoping Document
A new financial instrument
Natura 2000, Natura 2000 Action Plan & Biogeographical Process, water challenges Ctibor Kocman ENV D.3 Nature Protection nt Sarród, 15/11/2017nt.
GUIDANCE ON (NEEI) AND NATURA 2000 ___________________________________________________________________ TERMS OF REFERENCE N2K GROUP.
CGBN Co-ordination Group for Biodiversity and Nature
Technical guidance in relation to the non-energy extractive industry
When and how to best consider the provision of the Habitats directive
Natura 2000 and river basin management
Overview of Article 6 procedures under the Habitats Directive
Working Group on Estuaries Working Group on Rivers
ESTABLISHING CONSERVATION MEASURES FOR NATURA 2000 SITES
PROVISIONS UNDER THE HABITATS DIRECTIVE RELEVANT TO NEEI
Analysis of the notification of compensatory measures
The – new – LIFE program (Integrated Projects)
Natura 2000 management group Brussels, 19 May 2011
DG Environment, Unit D.2 Marine Environment and Water Industry
What does it mean to have a forest in a Natura 2000 area?
Presentation transcript:

DG Env.B21 Requirements of the Habitats Directive and planning and implementation of the projects Cohesion Fund and Environmental Impact Assessment TAIEX Seminar Prague, 24 February, 2005 András Demeter, Nature & Biodiversity Unit, Directorate-General Environment, European Commission Contact:

DG Env.B22 Key Priorities of the 6th Environment Action Programme = 156 priority actions 1. Climate Change 2. Nature and Biodiversity One of the specific aims (Gothenburg summit): Halt biodiversity decline by 2010! 3. Environment and Health and quality of life 4. Natural Resources and Waste

DG Env.B23 Legal Instruments for nature National Legislation Protected species, protected areas, hunting provisions,... European Union International Conventions Bern, Bonn, Ramsar, Washington (CITES), Biological Diversity

DG Env.B24 EU-nature conservation policy Two main directives: Wild Birds Directive (79/409/EEC) bird species Habitats Directive (92/43/EEC) other animal and plant species, habitat types

DG Env.B25 BIRDS DIR All bird species protected No priority bird species (cf. indicative list for Life-Nature) EU territory treated as a whole Habitat conservation measures (incl. SPAs in NATURA 2000) Regulated hunting and trade limited to a few species HABITATS DIR Species/habitats of EU interest protected Priority Habitats/species Biogeographical regions Site protection and management measures (SACs) in NATURA 2000 Species protection and management PRIORITY EU LEGAL INSTRUMENTS FOR NATURE & BIODIVERSITY

DG Env.B26

7 Natura 2000 network Global aim: Maintain or restore the favourable conservation status of certain species and natural habitat types in their natural range SPA SCI

DG Env.B28 What is the target of protection under Natura 2000? - I Birds Directive –181 vulnerable bird species (Annex I) +13 species (EU15+10) –migratory bird species (esp. wetlands)

DG Env.B29 Implementing the Birds Directive – nesting and migratory species

DG Env.B210 2 of the 13 new bird species in Annex I also proposed by CZ, HU, PL, SK (BG)

DG Env.B211 Setting up Natura 2000 Birds Directive 1)Member States classify (CC: by accession) 2) Commission takes coordinating role Reference list: Important Bird Areas (IBAs) based on international criteria

DG Env.B212 What is the target of protection under Natura 2000? - II Species and habitats of Community interest Habitats Directive (its annexes I-V) –appr. 200 habitats (EU15) + 20 habitats (EU15+10) –appr. 700 species (EU15) species (EU15+10)

DG Env.B213 The species such as the steppe polecat (Mustela eversmanii) or the beetle Carabus hungaricus have been proposed by both the Czech Republic and Hungary

DG Env.B214 Not only endemic plants... Dianthus moravicus Galium sudeticum

DG Env.B215 but also species which occur in other acceding countries.. e.g. Cirsium brachycephalum

DG Env.B216 Setting up Natura 2000 Habitats Directive 1)National lists proposed (CC: by accession) 2)Selection process on biogeographical level (aim: Community list) - MS & EC - max. 3 years 3)Designation by MS max. 6 years after Community list

DG Env.B217 NA103IT NATURA 2000 network « Habitats » Directive Art. 3 « Birds » Directive Art. 4 Special Protection Areas May End 2007 Special Conservation Areas NATURA 2000 National list of sites Habitat types (Annex I) Species (Annex II) List of Sites of Community Importance

DG Env.B218

DG Env.B219 What is special about Natura 2000? Clearly defined objectives Science based Biogeographic regions Site evaluation/selection on EU-level Management / Integration Legal obligation for the member states

DG Env.B220 State of play in 2005

DG Env.B221 Natura 2000 in the EU-15

DG Env.B222 What about the new Member States?

DG Env.B223 MSTotal NumberTotal Area (km²)Terrestrial Area (km²)% Terrestrial (1) No. of sites in which a marine part is noted Marine Area (km²) CY2108 1,200 CZ ,8 - EE , HU ,2 - LT ,5 0 LV ,64520 MT6882,4 0 PL , SI ,013 SK ,2 - EU , , Special Protection Areas – February, 2005

DG Env.B224

DG Env.B225 MSTotal NumberTotal Area (km²) Terrestrial Area (km²) % Terrestrial (1) No. of sites in which a marine part is noted Marine Area (km²) CY ,0550 CZ ,2 - EE , HU ,0 - LT ,1120 LV ,06556 MT ,5 0 PL ,7 0 SI ,430,2 SK ,8 - EU , , Sites of Community Importance – February 2005

DG Env.B226

DG Env.B227 Article 6 For sites Member States shall: –Establish necessary conservation measures –Avoid deterioration Prepare appropriate assessment for any plan or project (except direct management of site) –Likely to have a significant effect on site –Either individually or in combination with other plans or projects

DG Env.B228 Article 6 Requirements have to be transposed in the national legislation Appropriate assessment might be a separate document or part of the EIA package

DG Env.B229 The procedure Screening: the process which identifies the likely impacts upon Natura 2000 site of a project or plan, either alone or in combination with other projects or plans, and considers whether these impacts are likely to be significant Appropriate assessment: the consideration of the impact on the integrity of the Natura 2000 site of the project or plan with respect to the sites structure and function and its conservation objectives. Additionally, where there are adverse impacts, an assessment of the potential mitigation of those impacts; Alternative solutions: the process which examines alternative ways of achieving the objectives of the project or plan that avoid adverse impacts on the integrity of the Natura 2000 site; If adverse impacts remain: an assessment of compensatory measures where, in the light of an assessment of Imperative Reasons of Overriding Public Interest (IROPI), it is deemed that the project or plan should proceed.

DG Env.B230 Art. 6.3 and 6.4 Habitats Directive NA107IT Plan/project with impact on a site Is the plan/project likely to have a negative impact on the values of the NATURA 2000 site? YESEVALUATION OF CONSEQUENCES 1 Does the evaluation conclude that there will be significant negative consequences? YESSTUDY OF ALTERNATIVE SOLUTIONS 2 If the initial project is kept YES Inform the Commission COMPENSATION MEASURES 3 No priority habitats/species and overriding public interest YESOpinion of the Commission COMPENSATION MEASURES Priority habitats/species and specific interest for human health, public safety or environment YESOPINION OF THE EUROPEAN COMMISSION + COMPENSATION MEASURES Priority habitats/species and other overriding public interests

DG Env.B231 Screening Is the project or plan directly connected to or necessary for the management of the site and is unlikely to have significant effects? Yes No Significant Impacts are likely to occur ? Yes No Move directly to the relevant authorisation procedures Appropriate assessment

DG Env.B232 Screening Brief description of the plan or project Brief description of the site Brief description of potential effects on the Natura 2000 site Assessment of significance (use criteria)

DG Env.B233 No significant effect Fill in the Annex I (A) of the project document Signed and stamped by responsible authority Add the screening report to the project document and submit to the Commission

DG Env.B234 Appropriate assessment Can be concluded that the integrity of the site will not be affected by the project or plan? Yes It is possible to design appropriate mitigation measures that will cancel or minimise the adverse impacts? It is objectively concluded that adverse impacts on the integrity of the site remain? Move directly to the relevant authorisation process No Yes No To 6.4 Yes

DG Env.B235 Article 6 Appropriate assessment Study prepared by project promoter Used by responsible nature conservation authority for the assessment and filling in the ANNEX I (A) form (in case of Community funding)

DG Env.B236 Appropriate assessment No significant negative consequences Mitigation measures Appropriate assessments report Should be made publicly accessible Annex I (A)

DG Env.B237 Alternative solutions It is for national competent authority to determine whether alternative solution exists or not Alternatives suggested by project proponent Alternatives suggested by other stakeholders Mitigation measures

DG Env.B238 Overriding public interest targeted to protect fundamental values for citizens lives (health, safety, environment) carrying out activities of economic or social nature, fulfilling specific obligations of public service within the framework of fundamental policies for the State and society Determined by national authorities Supported by evidence Weigh against conservation status of the site and objectives of the directive

DG Env.B239 Compensation measures Within the same biogeographic region (HD) Within the same range and/or migration rout (BD) Within the territory of the same Member State Maintain coherence of the Natura 2000 network Enlargement of the same site Designation of new site with the same quality, function and structure Restoration of an other site Creation of a new site

DG Env.B240 Compensation measures The Commission informed and consulted well in advance Timing of compensation agreed Responsibilities agreed (also financial) Legal (contractual measures in place )

DG Env.B241 Art. 6.3/4 Habitats Directive, simplified Possible negative impact on Natura 2000 site? Nature impact assessment yes If negative Overriding public interest? If yes Compensation measures - Commission opinion (if priority interest ) Alternatives? If no

DG Env.B242 The way article 6 is implemented in the United Kingdom (diagramme by Wyn Jones)

DG Env.B243 Imperative reasons excluding socio-economicsYN Imperative reasons including socio-economicsYN Priority featuresYN YN No adverse effect on integrity Alternative solutions NY SoS to secure compensation measures Notify SoS Plan or Project Express Further info and consult EN YN Avoid by conditions YN Likely Significant Effect Branch-line Usual Considerations Junction DECISIONSVILLE STATION Appropriate Assessment of Plans and Projects STOP

DG Env.B244 Imperative reasons excluding socio-economicsYN Imperative reasons including socio-economicsYN Priority features branchlineYN YN No adverse effect on integrity Alternative solutionsYN SOS to secure compulsory measures Notify SOS Plan or Project Express Further info and consult EN YN Avoid by conditions YN Likely Significant Effect Branch-line Usual Considerations Junction DECISIONSVILLE STATION Appropriate Assessment of Plans and Projects STOP

DG Env.B245 The Commission is concerned because… The Habitats and Birds Directive: a sector with high public attention: for example, in mid-2003 –53% of all environmental complaints (97%: bad application) –30% of all environmental own initiative cases (93% bad application) –28% of all environmental infringement cases (78% bad application) Most of them relate to project developments (art.6), not to designation of sites

DG Env.B246 dealing with plans and projects New Member States : Art.6 (2/3/4) apply from accession onwards Problems: – no or inappropriate nature impact assessments – negative results of assessments not respected – no alternatives considered – no or inadequate mitigation / compensation measures – no designation or nomination of a qualifying site: provisions apply nevertheless (SPAs: even stricter rules!) SPECIFIC PROBLEMS

DG Env.B247 The Commissions response l Production of guidance documents l Information & communication (NATURA newsletter, web site, etc) l Legal actions (many court cases)

DG Env.B248 Guidance documents, for example

DG Env.B249

DG Env.B250

DG Env.B251 Should there always be a conflicts between conservation goals and economic interests?

DG Env.B252 Conclusions as regards planning vs. Art. 6 of the Habitats Directive The Competent Authority must be competent Appropriate assessment EIA Case by case judgement important Resource-demanding legal obligation

DG Env.B253 Best of luck in applying Article 6, and thank you for your attention ! More information at homepage: nature/home.htm