IG meeting TITRE 04/04/2013 IG meeting Coordination of the (early) implementation of network codes Programme Office.

Slides:



Advertisements
Similar presentations
1 TITRE Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11 th Stakeholder Group meeting GRI.
Advertisements

ENTSOG’s view on next steps for regional co-operation Nigel Sisman Senior Adviser Stakeholder Group, GRI NW, Brussels, 26 Nov 2010.
New structure of GRI NW following revised road map Stakeholder Group meeting Brussels, 26 November 2010 Peter Plug Chairman GRI NW.
Stakeholder Group Meeting 26. May 2010 Northern Regional Initiative in a European context Jeppe Danø.
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
Click to edit Master title style TITRE CEE IG – 20/02/2014 ACER Long-Term Rights Task Force Current status of the discussion with ENTSO-E.
RCC meeting Monitoring implementation of network codes TITRE 18/10/2012 RCC meeting First thoughts on project approach for monitoring implementation of.
ACER’s view on the future role of the Gas Regional Initiative Dennis Hesseling Head of the Gas Department, ACER 11 th Stakeholders group meeting of GRI.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
Heinz Hilbrecht Director "Security of Supply and Energy Markets" European Commission - DG TREN , GRI NW, Amsterdam Regional Cooperation Role of.
Day-Ahead Market Coupling Algorithm approval coordination NWE IG, Schipol, 28. March 2012.
Exploring the feasibility of implicit allocation TITRE 04/04/2013 IG meeting Exploring the feasibility of implicit allocation in the gas market NMa.
GRI NW European Energy Work Plan 2011 – 2014 Programme Office RCC meeting, 15 September 2011.
Regional co-operation within the Third Package Nigel Sisman Senior Adviser Stakeholder Group, GRI NW, Den Haag, 7 May 2010.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Co-ordination of Decisions at Regional and European level.
TSO progress towards ENTSOG IFIEC Energy Forum 22 Sep 2009 Jacques Laurelut GTE President & GTE+ Transition Manager.
Directorate General for Energy and Transport European Commission Directorate General for Energy and Transport Regulation of electricity markets in the.
GTE views on the role of TSOs As foreseen in the Third Package Joint Workshop ERGEG GRI SSE and EFET 21 January 2008.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Nigel Sisman,
Gas Regional Initiative Region North-West Transparency Project Nicola Meheran, Ofgem.
Walter Boltz, Chairman ERGEG Gas Working Group 18 th Madrid Forum 28 September 2010 Pilot framework guideline on capacity allocation in natural gas transmission.
The next steps for regional co-operation GRI NW Stakeholder Group 25 November 2011.
Development of System Operation Network Codes ACER Workshop 24 August 2011 Ole Jan Olesen, Convenor ENTSO-E Working Group on European Operational Standards.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
David Halldearn 6 May Background Programme Board initial discussion last year at Stockholm Since then: Further analysis has been undertaken on.
GTE+ progress towards ENTSOG Jacques Laurelut GTE President & GTE+ Transition Manager GIE Annual Conference 2008, Bucharest.
Initial ideas regarding pre-comitology meetings RCC The Hague, 5 July 2010 Programme Office GRI NW.
22 – 23 November 2007 GIE Annual Conference How the Third Package might encourage investment.
1FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Peter Plug Chairman of the electricity working group Use and management of interconnections – The.
Lord Mogg Chair, ERGEG Madrid Forum, 14/15 January 2010 Strategy for market integration and the role of the Regional Initiatives.
Gas Regional Initiative Impact of the 3rd package & creation of RIG Benoît Esnault (CRE), GRI TF co-chair NW GRI – RCC and ministerial meeting Paris, 8.
Michael Schmoeltzer Member of ERGEG Gas Working Group GIE Annual Conference, 6/7 May 2009, Groningen ACER & ENTSOG and their interaction.
GRI NW European Energy Work Plan 2011 – 2014 Robert Spencer 20th Madrid Forum, 26 September 2011.
Walter Boltz, Chairman ERGEG Gas Working Group 18 th Madrid Forum 28/29 September 2010 Draft framework guideline on balancing in natural gas transmission.
NRA’s vision on GRI NW work plan 2011 Stakeholder Group meeting Brussels, 26 November 2010 Peter Plug Chairman of GRI NW.
Gas Regional Initiative South South-East
10 year investment plan ERGEG approach and contribution
19th GRI Coordination Group meeting
The 3rd package for the internal energy market
How will the 3rd Energy Package Impact GRI NW ?
Update on CAM roadmap/ joint European Capacity Platform
43th IG Meeting South Gas Regional Initiative
Upcoming Stakeholder Group meeting
ERGEG GRI South South East – , Maribor
Implementation of the Network Codes: ACER monitoring and SSE GRI state of play Dennis Hesseling, Riccardo Galletta, ACER 21st Stakeholder Group meeting,
Gas Regional Initiative
GRI NW European Energy Work Plan 2011 – 2014
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
ACER’s view on the future role of the Gas Regional Initiative
Coordination of the (early) implementation of network codes
First thoughts on project approach for monitoring implementation of network codes Programme Office RCC meeting TITRE 18/10/2012.
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
First thoughts on project approach for assessing market liquidity within GRI NW Programme Office RCC meeting TITRE 18/10/2012.
Update on CAM roadmap/ joint European Capacity Platform
43th IG Meeting South Gas Regional Initiative
Gas balancing – where next
Gas Regional Investment Plan project
First thoughts on project approach for monitoring implementation of network codes Programme Office RCC meeting TITRE 18/10/2012.
Coordination of the (early) implementation of network codes
Gas Regional Initiative Update on progress and latest developments
Implementation of the Network Codes: ACER monitoring and SSE GRI state of play Dennis Hesseling, Riccardo Galletta, ACER 21st Stakeholder Group meeting,
GRI NW European Energy Work Plan 2011 – 2014
Exploring the feasibility of implicit allocation in the gas market
Gas Regional Initiative South South-East
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
Coordination of the (early) implementation of network codes
ACER’s view on the future role of the Gas Regional Initiative
Exploring the feasibility of implicit allocation in the gas market
Upcoming Stakeholder Group meeting
Gas Regional Initiative South South-East
Presentation transcript:

IG meeting TITRE 04/04/2013 IG meeting Coordination of the (early) implementation of network codes Programme Office

IG meeting Given the role of the network codes in achieving the internal market, timely and coordinated implementation needs to be ensured Ensure effectiveness Shared ownership Network codes are important step to achieve internal market, stakeholders have shared ownership towards implementation Certain network codes night need regional interpretation to ensure that the rules are fully fit for purpose Fit for purpose Network codes can only have effect if the rules are implemented in the same way at both sides of the border

IG meeting Monitoring the implementation of network codes at regional level can ensure that delays and obstacles are early identified and discussed Implementation checklist Regional operalization Reporting Monitoring Actual implementation Identify and share lessons learned from pilots before implementation Identify regional solution (if needed) for pitfalls/ open ends in network code Identify obstacles and delays during implementation period (via checklist) Report progress and obstacles to EC/ ACER/ ENTSOG/ Member States Framework for monitoring should fit the European roadmap for CAM

IG meeting Monitoring report should identify progress made, (impact of) obstacles faced and actions needed to ensure timely and correct implementation Ad hoc group to draft checklist, progress report and regional solutions (if needed) Rules to be implemented Rule A Rule B Rule C Rule D National NRA and TSO(s) provide input Drafting of report on progress made, (impact) of obstacles faced and actions needed Discussion of report in IG meeting, Gov´t meeting, CAM group etc.