Best Practices in Conducting a TECHNICAL Feasibility Study ( TFS ) for a Public-Private Partnership ( PPP ) Infrastructure Project (unabridged version)

Slides:



Advertisements
Similar presentations
The Chemical Engineering Law of 2004
Advertisements

TRP Chapter Chapter 6.8 Site selection for hazardous waste treatment facilities.
Towards a Better Appreciation of Architects & R.A. No (The Only PH Law on the Practice of the State-regulated Profession.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
Enhancing Competitiveness for Inclusive Growth Working Group on Decentralization and Local Governance Sub-Theme 2.
Licensing of Nuclear Power Plants in Pakistan
Community Benefits Agreements The National Economics Department Financial Freedom Campaign NAACP.
CALL TO ACTION OF THE “1ST NATIONAL COOPERATIVE HOUSING SUMMIT” Presented by: Ms. Doris Canares, PCC Chairperson.
PRESENTED BY ELIZABETH TAMALE ASSISTANT COMMISSIONER MINISTRY OF TRADE, INDUSTRY AND COOPERATIVES AID FOR TRADE, INTELLECTUAL PROPERTY AND DEVELOPMENT-
FIDIC Conference, Beijing Sustainable Quality Consulting Services Robert Robertson ADB Director Consulting Services 7 September 2005.
AfDB - EBRD Joint conference in procurement reform in North Africa and SEMED Countries Marrakech 22 and 23 April 2013 Jordan Delegation 22-23/4/2013.
A PROCUREMENT ASSESSMENT MODEL Joel Turkewitz World Bank April 2003.
Community-based Education K-12 students serving as a resource for meeting community needs.
What are the Main ARCHITECTURAL PLANS/ DOCUMENTS
Developing a Waste Water Discharge Fee Programme in Sri Lanka Kolitha Himal Muthukuda Arachchi Deputy Director General, Pollution Control Central Environmental.
The Brooks A&E Act National Oceanic & Atmospheric Administration Acquisition & Grants Office January 24, 2006.
23/08/20151 European Investment Bank EUROPEAN INVESTMENT BANK Urban Development Projects 29 th May 2009 Barbara Lemke Urban Planner Projects Directorate.
MYTHS and FACTS About the Practices of the Regulated Professions of Architecture and Civil Engineering in the Philippines 04 December 2007 UAP-IAPOA Balangkasan.
Professional Engineering Accountability Policy Professional Engineering Accountability Policy ODOT/ACEC Conference Presentation March 8, 2006 Cathy Nelson/ODOT.
Planning for a Vibrant Community. Introduction Planning is a process that involves: –Assessing current conditions; envisioning a desired future; charting.
Proposed SWG-LIR Work Plan Mr. Thomas Rojas Co-Convener, SWG-LIR 1st WG-GIC Meeting for 2012 Audio Visual Room, BOI Penthouse 30 March 2012,
CSI: Laws, Rules and Regulations that Govern the Practice and as All These Relate to the Full Implementation & Enforcement of R.A. No (The Architecture.
Public Procurement Exchange Platform Efficient implementation of Procurement - Centralized Purchasing Mr. Safet Hoxha, President of PPRC Mr. Ilaz Duli,
GUIDELINES FOR 3 rd Party INFRASTRUCTURE PROJECTS.
Diversified Experience in Architecture (DEA) Logbook Filing
Module 10 Session 10.4 Visual 1 Module 10 Organizing Procurement Session 10.4 Procurement of Services: Use of Consultants and Developing Terms of Reference.
The African CDM Training Workshop and Preparatory UNFCCC COP9 Meeting Addis Ababa, Ethiopia, October 20 – 21, 2003 INSTITUTIONAL SET-UP FOR CDM Dr Youba.
Workshop for a Priority Tourism Labour Division – Housekeeping. William Angliss Institute and ASEAN Tourism Presented by Wayne Crosbie, Director Angliss.
CERTIFICATION In the Electronics Recycling Industry © 2007 IAER Web Site - -
TUSAYAN GENERAL PLAN PUBLIC PARTICIPATION PLAN Town Council January 23, 2013.
COFPAES Presentation on GSA Federal Supply Schedule/ Multiple Award Schedule Re: Architect-Engineer Services Brian Pallasch, CAE American Society of Civil.
1 Texas Regional Entity 2008 Budget Update May 16, 2007.
Consultant: CMDC Joint Venture Reflections on draft Recommendations for Revision to Administrative Regulations: By Norman Sheridan, Legal & Institutional.
Ministry of the Environment and Territory Directorate for Development and Environmental Research Ministry of Economy and Finance Department for Development.
ACCESS TO MEDICINES - POLICY AND ISSUES
Case study: SEA for land-use plan amendments of Krasna Hora municipality.
Awareness raising process on EMS aimed to Adriatic and Ionian Ports (action 2): the starting points Piero Remitti, City of Ancona Brindisi, 21/22 January.
Legal Aspects Related to Brownfield Regenerations Prof. Maros Finka, M.arch., Ph.D. „This project has been funded with support from the European Commission.
Capacity building workshop on environment and health Public participation and the right to know: Aarhus Convention and PRTR Protocol Monica Guarinoni Sofia,
Capacity Building for the Kosovo Anti- Corruption Agency Constantine Palicarsky.
PRBoA(rchitecture) Milestones ( ) 10 Feb 2011.
Environmental Impact Assessment in the Slovak republic.
LAND POLICY AND LAND ADMINISTRATION Mark Marquardt Best Practices for Land Tenure and Natural Resource Governance in Africa October 2012.
REVIEW OF BROAD BASED BLACK ECONOMIC EMPOWERMENT ACT and CODES OF GOOD PRACTICE 27 JANUARY JANUARY 2012.
Asia Pacific Regional Council OCLC Record Use Policy Some Recent Developments OCLC Asia Pacific Regional Council Meeting National Library of Australia.
SEA in the Czech Republic Prague, 24 September 2008.
Environment SPC 24 th June 2015 Draft Dublin City Development Plan
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Fitness Check of environmental monitoring and reporting Stakeholder Workshop 19/20 Nov 2015 Joachim D'Eugenio Steve White DG Environment European Commission.
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
Organization Chart of Department of Public Works and Town & Country Planning (DPT) Director - General Internal Audit Unit Deputy Director - General Office.
Fitness Check of environmental monitoring and reporting MIG-P meeting 4 Dec 2015 Joachim D'Eugenio Steve White DG Environment European Commission.
 Contract by Public Authority for provision of asset and/or services  With private entity  Private finance used to fund asset/service  Long-term in.
Issues & Concerns of the PRBoA  As presented by the  Professional Regulatory Board of Architecture (PRBoA)  on 30 June 2012.
State of the Practice (2009) Architecture Stakeholder Forum 10 June 2009 UAP Auditorium Diliman, Quezon City, Metro Manila for the PRC Professional Regulatory.
Role of Self-Assessment V.C. Agarwal, Director (HR) NPCIL,INDIA.
Local Planning, Design, Construction & Development, Land & Building Use and the Laws that Govern Such Activities and as All These Relate to the Full Implementation.
Getting the Facts Right (A RLA’s* Briefing Material for Government Officials/ Public Sector and for Clients/ the Private Sector) *Registered and Licensed.
Neighborhood Planning Process Lacoochee/Trilby Neighborhoods.
Presented by Archt. Sudath Weerakoon, AIA (SL) Secretary – Professional Affairs Board Professional Affairs Board - (P A B) REPORT - ARCASIA COMMITTEE ON.
Procurement of Professional Services.  Professional Services:  Architects, Engineers  Surveyors  Geotechnical engineers  Nonprofessional Services:
CAREER PLANNING. License to practice for nurses Definition of license legal document given by the government that permits a person to offer to the public.
RA 9297 : Chemical Engineering Law Gregorio, Justin Edrik Guerrero, Lailyn Hao, Kristine Lauren Lorenzo, Anella.
AHIMA’s Commission on Certification for Health Informatics and Information Management (CCHIIM) Test Development Process Jo Santos, RHIA Senior Manager,
INSPIRE and the role of Spatial Data Interest Communities (SDIC)
Rail Baltica procurement organisation and regulations
Regulation of land use and building activities
GUIDELINES FOR 3rd Party INFRASTRUCTURE PROJECTS
National Disaster Risk Management Fund
Pre-Proposal Conference March 27, 2019, 1:00 p.m.
Presentation transcript:

Best Practices in Conducting a TECHNICAL Feasibility Study ( TFS ) for a Public-Private Partnership ( PPP ) Infrastructure Project (unabridged version) Panel 3 Discussions on Structuring a PPP Project : Key Success Factors An International Private Sector Workshop on An International Private Sector Workshop on Enhancing Institutional Framework Enhancing Institutional Framework for PPP in Infrastructure Development for PPP in Infrastructure Development 15 January 2010, Makati City 15 January 2010, Makati City Ar Armando N. ALLÍ, apec ar Ar Armando N. ALLÍ, apec ar PRBoA Chairman ( Co-Vice Chair, DPWH Board of Consultants (BoC) (Discussant)

A. Infrastructure Typology A. Infrastructure Typology 1)HARD Infrastructure a) Horizontal - roads, bridges, flood control*, water and power supply and distribution*, transportation and telecommunications*, traffic/ waste/ coastal management systems*, land development, planned unit development (PUD)* b) Vertical – public/ institutional buildings e.g. schools, hospitals/ health centers, national/ regional/ local offices and civic centers, halls of justice, agricultural, industrial, housing and resettlement, cultural, tourism, recreational and parks/ open spaces, national defense, etc. * with vertical components

A. Infrastructure Typology A. Infrastructure Typology 2) SOFT Infrastructure a) Regulation - national and local development controls relating to construction and development, the natural and built environments, procurement and PPP-BoT processes, professional practices and documents, administration/ implementation/ enforcement of law (soft vs. hard State), etc. b) Public Planning, Management and Response - framework and land use planning, natural and human resources, disaster planning and response c) Public/ Institutional Capability Enhancement d) Participation and General Social Concerns

B. The HARD Infrastructure Project Due Diligence Stream B. The HARD Infrastructure Project Due Diligence Stream 1)Pre-Feasibility Study (based on secondary data) 2)Feasibility Study (Technical, Financial and Social), including Concept to Preliminary level Master Development Plans (MDPs) and Architectural and Engineering (A&E) and Allied Plans and Designs (P&D) 3)Detailed MDP and A&E & Allied Plans and Designs 4)Project Management and Implementation including Infrastructure Procurement and Other Consulting Service Procurement Program/s plus Furniture, Fixture & Equipment (FFE) Procurement/ Fit-out 5)Project Evaluation and Monitoring

C. Key Components of an Infrastructure Technical Feasibility Study (TFS) C. Key Components of an Infrastructure Technical Feasibility Study (TFS) 1)Project Site Surveys, Investigations & Reports 2)Compliance Surveys and Reports 3)Traffic and Transport Surveys &Reports 3) Space Planning and Operations/ Process Flow Surveys and Reports (done mainly for Buildings/ Vertical Infrastructure Projects) 4) Environmental Investigations and Reports 5) Social Acceptability Survey/s and Reports 6) Public Consultations and Reports

D. Mandated Philippine Compliances for a HARD Infrastructure TFS D. Mandated Philippine Compliances for a HARD Infrastructure TFS 1)National Development Controls (Building Code and its Referral Codes for Vertical Hard Infra, planning laws, environmental laws, etc.) 2)Local Development Controls (zoning ordinance, development-related ordinances, etc.) 3) Professional Regulatory Laws (PRLs) and their supportive guidelines, standards and manuals of procedure governing professional practices and documents 4) Applicable best practices (non-regulated)

E. Other Best Practices for PPP Infrastructure TFS E. Other Best Practices for PPP Infrastructure TFS 1)The TFS Consulting Firm or Individual must be a Registered and Accredited Member of the Confederation of Filipino Consulting Organizations (COFILCO, the umbrella organization of Philippine Consult- ants as defined under R.A. No. 9184/ 2003 GPRA and its IRR ) 2)Full compliance with Professional Regulatory Laws (PRLs) and their supportive guidelines, standards and manuals of procedure on matters of professional firm registration, ownership, management and operation for TFS firms engaged in State-regulated professions 3)SUSTAINABLE Plans/Designs e.g. “Green” Architecture 4)ISO compliances/ accreditation a distinct advantage 5)Professional Indemnity Insurance (as applicable)

F. Matching Professional Competencies for Infrastructure Projects F. Matching Professional Competencies for Infrastructure Projects 1)HARD Infrastructure a) Horizontal - Professional* Engineers and Environmental Planners b) Vertical - Professional*Architects and Engineers 2) SOFT Infrastructure – Professional* Engineers Architects and Environmental Planners and duly qualified and suitably experienced professionals not regulated by the State. * State-regulated professions i.e. requiring certification thru licensure examinations and renewable licenses, membership in accredited professional organizations (APOs), and full compliance with valid and subsisting professional regulatory laws (PRLs)

G.Consulting Service Procurement Matters [under R.A. No. 9184/ 2003 Government Procurement Reform Act (GPRA) and its 2009 Revised Implementing Rules and Regulations (IRR)] G.Consulting Service Procurement Matters [under R.A. No. 9184/ 2003 Government Procurement Reform Act (GPRA) and its 2009 Revised Implementing Rules and Regulations (IRR)] 1)GIVEN SCOPE OF WORK UNDER THE TOR - must be reflective of current State-regulated professional practices and must be fully compliant with the pertinent professional regulatory laws (PRLs); deviations, particularly if substantial, MUST be separately compensated by the Government 2) REACTION PERIOD BY THE GOVERNMENT - must be fully DEFINED in the Consulting Service Agreement i.e. an open-ended response time translates into huge operating and overhead costs for the Consultant

H. Intellectual Property Rights (IPR) of Planning and Design Consultants H. Intellectual Property Rights (IPR) of Planning and Design Consultants 1)OWNERSHIP * of the generated/ evolved Infrastructure Plans and Designs is SHARED by the Consultant and the Government (Republic Act/ R.A. No. 8293) 2) COPYRIGHT ** over the generated/ evolved Infrastructure Plans and Designs is MAINTAINED by the Consultant; ROYALTIES apply (R.A. No and R.A. No in the case of the Architects) * applies to the original work or the first/ prototype infrastructure ** applies to the second and subsequent infrastructure, even if site adaptation is a requirement

I. ISSUES on Technical Feasibility Study (TFS) Preparation I. ISSUES on Technical Feasibility Study (TFS) Preparation 1)The Government practice of requiring plans and designs to be submitted as part of the TFS proposal constitutes a serious violation of intellectual property rights (IPR)/ R.A No and the Architecture Law/ R.A. No. 9266); 2)REPETITIOUS plan and design preparation and extended Government reaction periods to transmitted Consultant deliverables must be additionally compensated; and 3) REPETITIVE plan and design preparation must be separately compensated through royalties.

J. CONCERNS on Technical Feasibility Study (TFS) Preparation J. CONCERNS on Technical Feasibility Study (TFS) Preparation 1)A Social Acceptability Report (based on primary stakeholder interviews) and/or a Host Community Participation Program must be standard features for TFS of large to very large PPP infrastructure projects 2) At least 3 Project Monitoring Reports by Third Parties i.e. post-design, post construction and post-initial operation need to become standard features for TFS of large to very large PPP infrastructure projects 3)Urban Design inputs must be requirement for TFS of large to very large HORIZONTAL Infrastructure Projects so that the resultant designs shall be more organic, softer, properly proportioned if not human in scale and generally aesthetic. 4)There should be a parallel set of planning, design and construction standards for ALL types of HORIZONTAL HARD Infrastructure i.e. similar to the National Building Code and its Referral Codes (P.D. No and its 2004 Revised IRR) that govern VERTICAL HARD Infrastructure Projects 5) The Government Procurement Policy Board (GPPB) must always consult/ liaise with the Professional Regulation Commission (PRC) and its Professional Regulatory Boards (PRBs) anent matters concerning State- regulated professional practices and documents.

Thank You and a Pleasant Afternoon to All Best Practices in Conducting a TECHNICAL Feasibility Study ( TFS ) for a Public-Private Partnership ( PPP ) Infrastructure Project (unabridged version)