Future water use and the challenge of hydropower development in western Balkan Future water use and the challenge of hydropower development in western.

Slides:



Advertisements
Similar presentations
Unconventional Gas and EU Energy Policy
Advertisements

Jarvis plc Interim Results 26 November Strategic Highlights Continued focus on Rail, Plant and Freight Difficult trading conditions in first half.
Rural Development Policy
Republic of Kosovo MINISTRY OF ENVIRONMENT AND SPATIAL PLANNING
Water.europa.eu Water quality in the Danube basin Third Conference on the EU Strategy for the Danube Region 21 April 2010 Marieke van Nood Water Unit DG.
1 European Union Regional Policy – Employment, Social Affairs and Inclusion Addressing challenges in a changing world: -The future Cohesion Policy- Wolfgang.
EU Strategy for the Danube Region – Vienna/Bratislava Conference
Energy policy and its implementation in Estonia Renewable energy Madis Laaniste, Energy Department.
FASRB and the Water Risk Management Samo Grošelj Deputy Secretary, ISRBC.
Dejan Komatina, Ph.D. Civ. Eng., Secretary, ISRBC IWRM in the Sava River Basin – a basis for sustainable development of the region.
CRed carbon reduction Reader Emeritus in Environmental Sciences; Energy Science Adviser Norwich Business School, University of East Anglia:
Hydro Power: The Potential Within the UK By Calvin Laing February 24 th 2005.
Recipient of James Watt Gold Medal for Energy Conservation Keith Tovey ( ) M.A., PhD, CEng, MICE, CEnv Reader Emeritus: University of East Anglia 1 Pathways.
CRed carbon reduction Reader Emeritus in Environmental Sciences; Energy Science Adviser Norwich Business School, University of East Anglia:
J2 Regulating Reservoir Project
Water policy development in Uganda
Kyrgyzstan: Climate Change Mitigation Actions Zuhra Abaihanova TNC Coordinator, Climate Change Centre Director, CC Coordination Commission Executive Secretary.
1 Experiences in Hydropower Development in Nepal An International Perspective Einar Stenstadvold Executive Vice President Asia, SN Power.
10 February 2009 The Case for Coal Generation Sandy Rae, Energy Management Director.
Land use for bioenergy production – assessing the production potentials and the assumptions of EU bioenergy policy Trends and Future of Sustainable Development.
Energy Year 2014 Electricity Finnish Energy Industries.
Danijela Banko, prof..  The amount of water per inhabitant places the Republic of Croatia among the best endowed countries in Europe  The average volume.
NERETVA AND TREBIŠNJICA MANAGEMENT PROJECT (NTMP) Republic of Croatia and Bosnia and Herzegovina Project Implementation Teams.
LEGAL AND INSTITUTIONAL FRAMEWORK OF WATER RESOURCES MANAGEMENT Semra Fejzibegović, Bc.Sc. In Mech.Eng. Hydro-Engineering Institute Sarajevo, Bosnia and.
Chair of Hydrology and Hydraulic Engineering University of Ljubljana The experimental watersheds in Slovenia1/34 DEVELOPING REGIONAL COOPERATION FOR SHARED.
MED-CSP Concentrating Solar Power for the Mediterranean Region WP1: Sustainability Goals WP2: Renewable Energy Technologies WP3: Renewable Energy Resources.
Hydroelectric Power
Small hydropower: water for energy Luigi Papetti ESHA.
WATER ISSUES IN THE EASTERN EUROPE:
Current state of energyproduction and useage, sources and domestic production.
BURUNDI’S WATER RESOURCE MANAGEMENT IN THE CONTEXT OF THE NILE BASIN.
LARGE DAMS AS A SOURCE OF RENEWABLE ENERGY Glen Singleton, Ph.D., P.Geo., B.C. Hydro Canada.
National Policy Dialogue in Ukraine on Integrated Water Resources Management First meeting of the Steering Group (Kiev, 25 April 2008)‏ Nataliia Zakorchevna.
Organization of the electricity market and renewable energy sources in the Republic of Croatia" Dubrovnik, 2 nd October th Dubrovnik Conference.
World Bank Water Week – 2004 Jerson Kelman. Hydroelectric power accounts for more than 90% of the total electric energy produced in Brazil.
-BUSINESS FORUM- MONTENEGRO PROJECTED REAL GROWTH IN 2015 PROJECTED AVERAGE ANNUAL ECONOMIC GROWTH UNTIL ,5%3,8% MACROECONOMIC INDICATORS.
Dr Richard Johnson, Mountain Environments, UK.  Lead Partner: Germany: Research Institute of Forest Ecology and Forestry  Partner countries: Germany,
Hydrological Energy By:Saeed Merghani and Dalal Dumaidi.
TOPIC 3.2 ENSURING ADEQUATED WATER RESOURCES AND STORAGE INFRASTRUCTURE TO MEET AGRICULTURAL, ENERGY AND URBAN NEEDS.
Hydropower and the Water Environment Peter Gammeltoft European Commission DG Environment, D.1 Water 2nd Workshop on Water Management, WFD & Hydropower.
IMPLEMENTATION OF THE WATER FRAMEWORK DIRECTIVE IN HUNGARY Eszter HAVAS-SZILÁGYI Ministry of Transport and Water Management Eszter HAVAS-SZILÁGYI Ministry.
“Lake Peipsi/River Narva basin – working together on the new Eastern border of the EU” Harry Liiv Deputy Secretary General on Environmental Management.
Biggest hydroelectric power plants in world
Milija Čabarkapa NGO Green Home Steps towards sustainable development of small hydropower plants in Montenegro.
NATIONAL WATER RESOURCE STRATEGY SOUTH AFRICA’S WATER SITUATION AND STRATEGIES TO BALANCE SUPPLY AND DEMAND LOWER ORANGE WMA.
1 19 th World Energy Congress – 2004 Round Table 1 – Non Fossil Fuels: Will They Deliver? Jerson Kelman President, Brazilian Water Agency - ANA.
FUTURE WATER USE AND THE CHALLENGE OF HYDROPOWER DEVELOPMENT IN WESTERN BALKAN FEBRUARY 2013 Dr Vladan Bozovic - University of Montenegro.
CONTENTS 1. INTRODUCTION 2. HYDRO POWER PLANTS IN INDIA
Hydro Power – the history and the future. Robyn Hammond, School of Environmental Sciences, University of East Anglia. 24 th February 2005.
15.4 Human Influences on the Hydrologic Cycle Runoff and the infiltration rate are greatly influenced by human activity. A major concern in many urban.
Regional workshop on SoE water quantity reporting of ETC/ICM with West Balkan countries Skopje, 10. – 11. January HRVATSKE VODE Marina Barbalić,
Kyrgyzstan & UNFCCC. Adaptation to Climate Change: Strategies & Priorities Zukhra Abaikhanova, Center for Climate Change Workshop The 2 nd Meeting of Working.
NATIONAL WATER RESOURCE STRATEGY SOUTH AFRICA’S WATER SITUATION AND STRATEGIES TO BALANCE SUPPLY AND DEMAND OLIFANTS/DOORN WMA.
Seminar for Eastern Europe, Caucasus and Central Asia Countries (EECCA) on Water Statistics September 2012, Almaty, Kazakhstan J.Otgonbayar, Water.
The Azerbaijani Republic The Ministry of Ecology and Natural Resources WATER RESOURCES OF AZERBAIJAN, THEIR MANAGEMENT AND BILATERAL AGREEMENTS Matanat.
WHY IS INTEGRATED RIVER BASIN PLANNING IMPORTANT? Module 1 pp 1.1.
Hydropower development of Bulgaria: current state and future outlook Valentin Ivanov Deputy Minister Ministry of Economy and Energy.
Framework for Water Management – challenges at national/local and trans-boundary scale Water Framework Directive implementation Gordana Kozhuharova, REC,
Nepal’s Water Resources at a Glance
River Narva basin: Narva reservoir and Lake Peipsi
First Assessment of Transboundary Rivers, Lakes and Groundwaters
NERETVA AND TREBIŠNJICA MANAGEMENT PROJECT (NTMP)
Renewable energy sources
ENERGY SECTOR IN MONTENEGRO
Other renewable energy sources
Water Statistics and Water Account in Jordan
Water Statistics and Water Account in Jordan
DG Environment, Nature Protection Unit (D3)
Hydropower in Europe Strategic coordination group
MINI -HYDROPOWER Climate friendly but not devoid of environmental and social risk.
Presentation transcript:

Future water use and the challenge of hydropower development in western Balkan Future water use and the challenge of hydropower development in western Balkan February 2013 Republic of Croatia Vesna Trbojevi ć,Mynistry of Agriculture, Water Management Directorate Mirjana Švonja, Croatian Waters

Water use Under the Croatian Water Act water use implies the abstraction, pumping and use of surface water and groundwater for various purposes. Water supply - public interest Technological and cooling purposes, irrigation, fishponds, exploitation of water power and other types of water use: - predominantly commercial interest - subject to market impacts The right to use water or water power is acquired on the basis of a concession contract (except for public water-no need) Concession giver is: - the ministry in charge of water - the government - the Croatian Parliament (for hydroelectric power more than 20 MW)

Quantity of water abstraction The greatest amount of abstracted water is provided for public water supply (app *10 9 m 3 per year). 88% of the abstracted drinking water quantities come from groundwater 12% comes from the surface water (watercourses and reservoirs). The public water supply systems cover: 94% of the total population in the Adriatic river basin district 84% of the total population in the Danube river basin district. 84% 94% Based on the concessions awarded, a total quantity of water which can be abstracted (not including fishponds and exploitation of water power) is: app. 1.13*10 9 m 3 per year

Total renewable water resources Water abstraction (l/s) Groundwater Surface water ( 61% ) ( 39% ) The total renewable water resources in Croatia is 112*10 9 m 3 of water per year. Abstracted quantities water is not significant (1% ) in relation to available water resources. Croatia has plenty of water, but local problems with the quantitative status of water are occasionally possible water being unevenly distributed in space and time.

Hydropower potential The overall water potential in the Republic of Croatia which is technically exploitable in the hydropower plants has been estimated at GWh/year. Small watercourses account for app GWh/year or around 10% of the total water potential GWh/year is currently used in the existing hydropower plants (49% of the total water potential). The most suitable locations for the development of hydropower plants have already been largely used. For further development of hydropower can be mostly used the remaining sites in the valleys with a potential impact on the regime of surface water and groundwater.

Production of electric power In the structure of the electric power system of the Republic of Croatia more than 50% of electric energy is imported, more than half of domestic output comes from hydropower plants The construction of hydropower plants was very intensive in the second half of the 20th century until the early 1990s, when it was mostly stopped. Priority was given to multifunctional systems for water regulation and water use. A number of multipurpose reservoirs have been constructed in order to use for: flood protection, provision of water for water supply, production of electric energy, provision of water for irrigation, regulation of the low water regime, sport and recreation.

Hydropower currently in operation In Croatia there are: 17 large hydropower plants (>10 MW) of storage and run-of-river type 15 small hydropower plants ( MW) 4 mini ( MW) and several micro hydropower plants (5-100 kW)

General information The biggest reservoirs are: Peru č a - the Cetina River (571*10 6 m 3 ) Kruš č ica - the Lika River (142*10 6 m 3 ) HE Zaku č ac - the largest hydropower plant which delivers a third of total hydropower in Croatia. HE Jaruga under waterfall on the Krka River is the second oldest hydropower plant in the world and the first one constructed in Europe. HE Velebit - only pumping hydropower plant in Croatia. The operation of certain hydropower plants is directly related to transboundary waters: HE Dubrovnik uses the water from the Bile ć a reservoir, HE Orlovac uses the water from the Buško blato, Mandak and Lipa reservoirs on the territory of Bosnia and Herzegovina. Large and some of the small hydropower plants

Planned constuction Construction foreseen in the near future: HE Podsused (43 MW) - the Sava River HE Kosinj (28 MW) - the Lika River HE Novo Virje (138 MW) - the Drava R. HE Ombla (68.5 MW) - the Ombla R. HE Dubrovnik 2 (300 MW) – water from the Bile ć a reservoir The reconstruction of the existing hydropower plants will also contribute to an increase in capacity. Croatia has set a goal of constructing a number of small hydropower plants (less than 5 MW) on 6 watercourses. 18 selected locations for the construction of small hydropower

Energy Development Strategy, 2009 (Official Gazette 130/2009) The Energy Development Strategy of the Republic of Croatia addresses the period until the year 2020 and pursues three basic energy-related objectives: Safe energy supply; Competitive energy system; Sustainable energy development. The newly installed capacities in 2020 will be 300 MW (including also HE Leš ć e put into operation in 2010, but excluding small hydropower plants as these are balanced in renewable energy). It is assumed that in the period the capacity will increase by 50 MW each year. No additional increase in hydropower capacity is foreseen after the year 2020.

Environmental aspects of construction of hydropower plants Significant impact on hydromorphological and ecological status of water, nature, cultural and historical heritage, forests, land, etc. With regard to the border and across border character of a great number of Croatian rivers, the process of planning and implementation of projects requires coordination with other countries. Significant impact on downstream flow (deepening of the original river bed, reducing sediment transport, erosion activate processes on the banks, lowering of the groundwater, etc.)

Thank you for your attention!