© 2007, Itron Inc. VELCO Long-Term Demand Forecast Kick-off Meeting June 7, 2010 Eric Fox.

Slides:



Advertisements
Similar presentations
October 8, 2013 Eric Fox and Mike Russo. AGENDA »Recent Sales and Customer Trends »Preliminary State Sales and Demand Forecast »Building a No DSM Forecast.
Advertisements

HISTORICAL GAINS IN ENERGY EFFICIENCY, Ahmad Faruqui Sanem Sergici Lafayette, California February 8, 2008.
Keystone Energy Efficiency Conference 2011 September 20, 2011.
Assessment of Climate Change Impacts on Electricity Consumption and Residential Water Use in Cyprus Theodoros Zachariadis Dept. of Environmental Science.
OVERVIEW OF LOAD FORECASTING METHODOLOGY Northeast Utilities Economic & Load Forecasting Dept. May 1, 2008 UConn/NU Operations Management.
Load Forecasting Eugene Feinberg Applied Math & Statistics Stony Brook University NSF workshop, November 3-4, 2003.
ERCOT Load Forecast and Reserve Margin Update June 2, ERCOT Load Forecast and Reserve Margin Update June 2, 2005.
1 Econometric Load Forecasting Peak and Energy Forecast 06/14/2005 Econometric Load Forecasting Peak and Energy Forecast 06/14/2005.
2011 Long-Term Load Forecast Review ERCOT Calvin Opheim June 17, 2011.
Monte Carlo Methods in Forecasting the Demand for Electricity Frank S. McGowan Market Forecast Department October 26, 2007.
The Efficiency of Energy Efficiency Program Tom Van Paris Vice President-Member Services & Communications October 18, 2012.
U.S. Energy Information Administration Independent Statistics & Analysis Short-Term Energy Outlook and Winter Fuels Outlook For NASEO Winter.
1 Load Forecast and Scenarios David Bailey Customer Energy & Forecasting Manager Soyean Kim Rate Design Manager.
LSS Black Belt Training Forecasting. Forecasting Models Forecasting Techniques Qualitative Models Delphi Method Jury of Executive Opinion Sales Force.
Study Results Drought Scenario Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the impact in the interconection.
Electric / Gas / Water Eric Fox Oleg Moskatov Itron, Inc. April 17, 2008 VELCO Long-Term Demand Forecast Methodology Overview.
Big Sandy Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis.
Farmers Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
Coincident Peak Load Forecasting Methodology Prepared for June 3, 2010 Meeting with Division of Public Utilities.
Regional Technical Forum End-use Load Shape Business Case Project Project Initiation Meeting Portland, OR March 5, 2012.
Load Forecasting within Vermont & New England Docket 7081 workshop 9/13/05.
ERCOT PUBLIC 7/14/ Long-Term Load Forecasting Calvin Opheim ERCOT Manager, Forecasting & Analysis LTSA Scenario Development Workshop July 14, 2015.
Capacity Impacts of Energy Efficiency What We Know and What We Don’t Know March 11, 2014.
SEDS Review Chris Marnay Michael Stadler Inês Lima Azevedo Judy Lai Ryoichi Komiyama Sam Borgeson Brian Coffey May 7, 2009 SEDS Building Sector Module.
2007 Planning Long-Term Hourly Demand and Energy Forecast Board of Directors Meeting May 16, 2007 Bill Bojorquez.
Shelby Energy Cooperative, Inc Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department July 2006.
Technical Conference on Net Metering Load Research Study November 5, 2014.
Highlights of AESC 2011 Report Vermont Presentation August 22, | ©2011 Synapse Energy Economics Inc. All rights reserved.
1 ERCOT 2007 Strategic Financial Plan & Budget Proposal _____________________ Board of Directors November 14, 2006.
Grayson Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
Owen Electric Cooperative 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department July 2006.
ERCOT Long-Term Demand and Energy Forecasting February 20, 2007 Bill Bojorquez.
An Approach to Adjust ERCOT’s Long-Term Load Forecast for Utility Energy Efficiency Programs Jay Zarnikau Frontier Associates LLC June 10, 2013.
September 24, 2007Paying for Load Growth and New Large Loads APPA September 2007.ppt 1 Paying for Load Growth and New Large Loads David Daer Principal.
Smart Energy Smart Energy July 28, Smart Energy.
Clark Energy Cooperative 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department July 2006.
Northwest Power and Conservation Council Residential Conservation Resource Assessment Overview of Analytical Process and Major Assumptions April 21, 2009.
California Energy Commission Plug Loads in the Residential and Commercial Forecasts June 18, 2015 Tom Gorin Energy Assessments Division
Review of the New England “Mini-Pilot” DHP Evaluation Why we ignore this study.
May 03, UFE ANALYSIS Old – New Model Comparison Compiled by the Load Profiling Group ERCOT Energy Analysis & Aggregation May 03, 2007.
11/23/ Residential Sector Load Forecast Impacts of Codes, Standards and Market Changes Preliminary Estimates June 19, 2002.
PJM©2015 Updates to PJM Load Forecast Model OPSI Annual Meeting October 12, 2015 Tom Falin Manager – Resource Planning
Settlement Accuracy Analysis Prepared by ERCOT Load Profiling.
1 Knowing Your Customers Better Through Load Research Presented By: Lawrence M. Strawn Senior Retail Pricing Coordinator Orlando Utilities Commission September.
NEEA DEI Study Data Analysis Plan October 28, 2005 RLW Analytics, Inc. Roger L. Wright, Chairman, and Principal Consultant.
2016 Long-Term Load Forecast
Jackson Energy 2006 Load Forecast Prepared by : East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department July 2006.
Presentation of Capabilities contact information Kevin Monte de Ramos (888)
Blue Grass Energy Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
ERCOT PUBLIC 10/7/ Load Forecasting Process Review Calvin Opheim Generation Adequacy Task Force October 7, 2013.
Regional Technical Forum Future Funding Discussion March 19, 2014 RTF PAC Presentation.
Licking Valley Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by : East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis.
09/17/2006 Ken Donohoo ERCOT Peak Day August Initial Settlement Data by Fuel Type.
South Texas Electric Cooperative Load Forecasting Methodology ROS Meeting, 6/10/10.
Utilities’ Update on Energy Savings Assistance Program Studies Ordered in D LIOB Meeting August 21, 2013 Sacramento, California.
Fleming-Mason Energy Cooperative 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis July 2006.
FIRM TRANSPORTATION GAS SUPPLIER PRESENTATIONS GAS LOAD FORECAST.
Forecasting Demand. Problems with Forecasts Forecasts are Usually Wrong. Every Forecast Should Include an Estimate of Error. Forecasts are More Accurate.
Energy Intensive Industrial Customer Work Group March 24, 2014.
Hybrid Forecast for Resource Adequacy Analysis with recommendations Massoud Jourabchi April
© 2007, Itron Inc. Statistically Adjusted End-Use Model Overview & Thoughts about Incorporating DSM into a Forecast May 4, 2009 Frank A. Monforte, Ph.D.
Time of Use Rates: A Practical Option – If Done Well
SDG&E’s Statistically Adjusted End-Use (SAE) Sales Forecasting
Chris Kavalec Demand Analysis Office
2018 VELCO IRP Forecast Preliminary results
Independent Load Forecast Stakeholder Workshop #2
Independent Load Forecast
Independent Load Forecast Workshop
Integrated Resource Planning and Load Flexibility Analysis
Behavior Modification Report with Peak Reduction Component
Presentation transcript:

© 2007, Itron Inc. VELCO Long-Term Demand Forecast Kick-off Meeting June 7, 2010 Eric Fox

© 2007, Itron Inc.2 Agenda  Discuss proposed framework for developing the long- term VELCO system and zonal demand forecasts  Review ISO-NE forecasting approach  Discuss issues related to Energy Efficiency and Forecasting (EE&F) Forecast Guidelines >Economic and weather data >Incorporating the impact of state efficiency activity >Incorporating the impact of interruptible load and demand response programs  Project schedule

© 2007, Itron Inc. VELCO System and Zonal Demand Forecasts  Develop twenty-year demand forecasts that captures: >population trends, economic conditions, price >peak day weather conditions >end-use saturation and efficiency trends Standards, impact of federal tax credit programs, price induced efficiency gains State and utility efficiency programs Interruptible load and demand control programs  Team effort – >program efficiency savings integration >implementing forecast within forecast committee guidelines 3

© 2007, Itron Inc. VELCO Daily Peak Demand (MW) 4

© 2007, Itron Inc. VELCO Monthly Peak (MW) 5

© 2007, Itron Inc. Approaches for Forecasting Demand  Generalized econometric model >Approach used by New England ISO Demand = f(Energy, trends, peak day weather) –Energy = g(real income, price, monthly weather)  Hourly build-up approach >Approach used last year Forecast class and end-use sales (SAE specification) Combine end-use sales with end-use load profiles Aggregate to system peak  SAE peak model >Proposed approach Forecast class and end-use sales (SAE specification) Demand = f(End-use coincident load, peak-day weather) 6

© 2007, Itron Inc. Step 1: Estimate SAE Energy Models  Build monthly revenue class sales models >Construct SAE models for the residential and small commercial customer classes base on actual sales data >Estimate generalized econometric models for the large/commercial and industrial classes Supplement with specific customer estimates where available (such as IBM) >Potentially estimate state level and utility service area models for GMP, Central Vermont, and BED 7

© 2007, Itron Inc. Statistically Adjusted End-Use (SAE) Framework AC Saturation Central Room AC AC Efficiency Thermal Efficiency Home Size Income Household Size Price Heating Saturation Resistance Heat Pump Heating Efficiency Thermal Efficiency Home Size Income Household Size Price Saturation Levels Water Heat Appliances Lighting Densities Plug Loads Appliance Efficiency Income Household Size Price Heating Degree Days Cooling Degree Days Billing Days XCool XHeat XOther

© 2007, Itron Inc. Step 2: Develop End-Use Saturation and Efficiency Trends  Use AEO 2010 New England Census Region forecast as a starting points  Adjust end-use saturation and structural data to reflect Vermont >KEMA appliance saturation survey >BED survey work >Efficiency Vermont market analysis  Modify historical and forecasted efficiency trends to reflect the impact of state and utility specific efficiency programs 9

© 2007, Itron Inc. Efficiency Program Impacts Cooling Efficiency Program No DSM Efficiency Path Marginal Efficiency Marginal Efficiency

© 2007, Itron Inc. Adjusted End-Use Indices (kWh per Cust)

© 2007, Itron Inc.12 Statistically Adjusted End-use Modeling (cont.) Estimate monthly average use regression models:

© 2007, Itron Inc.13 XCool

© 2007, Itron Inc.14 XHeat

© 2007, Itron Inc.15 XOther

© 2007, Itron Inc. Residential Average Use Forecast 16

© 2007, Itron Inc. End-Use Energy Forecast 17

© 2007, Itron Inc. Last Year’s Approach Residential Cooling Base Use Combine end-use energy with end-use shapes Combine end-use energy with end-use shapes

© 2007, Itron Inc. Peak-Day System Hourly Load Profile (MW) Aggregate Class Load Forecasts to System Load Forecast And Find Annual System Peak Aggregate Class Load Forecasts to System Load Forecast And Find Annual System Peak System Residential Commercial Industrial Lighting

© 2007, Itron Inc. Step 3: Estimate SAE Peak Demand Model  Derive end-use coincident peak load estimates from the SAE sales models weight class estimates to reflect zonal area customer mix  Construct peak-day weather variables 50% and 90% probability weather  Combine end-use energy stock estimates and peak-day weather into monthly SAE peak-day variables  Estimate system and zonal peak demand models  Develop seasonal peak demand forecasts for 50% and 95% probability weather  Adjust for interruptible load and demand response program impacts 20

© 2007, Itron Inc. Simulation Results from Sales Models Residential Small C&I Large C&I Municipal Cooling Heating Other

© 2007, Itron Inc. Simulation Results from Sales Models  Sum of End-Use Energy >Normal heating for Res, SGS, LGS, … >Normal cooling for Res, SGS, LGS, … >Other loads for Res, SGS, LGS, … Total Monthly Energy (GWh) Total Monthly Energy – Normal Weather -- All Classes Total Monthly Energy

© 2007, Itron Inc. Heating Variable Construction  Annual Heating Transforms  Monthly Heating Transforms Sum monthly heating values from the sales model. Interact heat index values with peak day temperatures and prior day temperatures. Use splines if needed.

© 2007, Itron Inc. Cooling Variable Construction  Annual Cooling Transforms  Monthly Cooling Transforms Sum monthly heating values from the sales model. Interact cool index values with peak day temperatures and prior day temperatures. Use splines if needed.

© 2007, Itron Inc. Residential Monthly Usage Profiles Water Heating loads are lower in summer due to warmer inlet water temperatures Lighting Loads are larger in winter due to increased hours of darkness. Refrigerator and Freezer loads are larger in summer due to warmer ambient conditions inside the home. Heating and Cooling

© 2007, Itron Inc. Residential Hourly Usage Profiles Water Heating loads are lower in summer due to warmer inlet water temperatures Lighting Loads are larger in winter due to increased hours of darkness. Refrigerator and Freezer loads are larger in summer due to warmer ambient conditions inside the home.

© 2007, Itron Inc. Base Use Variable Construction  Annual Other Transforms  Monthly Other Transforms Sum monthly energy values from the sales model. Interact other annual usage with peak monthly peak fractions by class and end use.

© 2007, Itron Inc. Example of Transformations – Res Lighting Res Light CP 343 MW 42 MW 248 MW 31 MW

© 2007, Itron Inc. Estimate Peak Model Regression Statistics Iterations1 Adjusted Observations114 Deg. of Freedom for Error103 R-Squared0.91 Adjusted R-Squared0.902 AIC BIC11.84 Std. Error of Regression Mean Abs. Dev. (MAD) Mean Abs. % Err. (MAPE)3.76% Durbin-Watson Statistic1.427 VariableCoefficientStdErrT-Stat BaseVar CoolVar CoolVar_May CoolVar_Oct HeatVar MA_OtherLoad Sep Apr Oct Apr Jun

© 2007, Itron Inc. ISO New England Energy Requirement Forecast  Uses a generalized econometric modeling framework  Forecasts total system energy by state/region >Annual model. Log/log specification. Forecast drivers include: Prior year energy Real personal income Real price HDD and CDD >Historical sales adjusted for past utility program efficiency savings >Exogenous adjustment for future efficiency savings Federal efficiency standards after 2013 (residential lighting) Passive efficiency savings as bid into the market 30

© 2007, Itron Inc. ISO New England Peak Demand Forecast  Forecasts system peak by state/region >Daily demand model by month. Linear specification. Forecast drivers include: Energy requirement forecast Peak-day weighted THI Trend interactive with peak-day THI >Historical peaks adjusted for load interruptions >Exogenous adjustment for future demand impacts Passive efficiency savings as bid into the capacity market 31

© 2007, Itron Inc. ISO Forecast Methodology  Relatively simple model specifications >Annual energy vs. monthly sales >Aggregate system level vs. revenue class >Peak demand is primarily driven by the energy forecast  Easier to model data series that have been adjusted for prior efficiency savings >No explicit end-use information incorporated in the model  But significantly less information than that embedded in the SAE framework 32

© 2007, Itron Inc.  Economic Data >Forecast Vintage >State vs. Regional Definition  Weather Data >Weather station >Weather variables  Modeling Approach  End-Use Efficiency and Saturation Trends  Incorporating the Impact Energy Efficiency Program  Other Issues 33 EE&F Forecast Guideline Discussion

© 2007, Itron Inc. Proposed Project Schedule  June >Complete forecast database  July >Develop end-use efficiency and saturation data  August >Estimate preliminary system peak forecast >Present preliminary results  September >Develop zonal demand forecasts >Deliver preliminary forecast report  October >Deliver final forecasts and report >Present final forecast 34