Operation of vDLE concept Revised C&W proposal. Background C&W continue to believe that in the “virtualised” situation CPs should pay connection & rental.

Slides:



Advertisements
Similar presentations
Element Based Charging (EBC) used within both BT Basic and BT Transit Telephony Element Based Charging uses switch related elements for charging. This.
Advertisements

Syndicate A - Issues Geographic nos: –DLERange changes re:parenting & DLE closures DTS, some DTM Solution: correct grid reference and Audit overrides Invoice.
Queries raised by Director (Tariff) on ARR and Tariff Application of NESCO for FY on
D- 1 TIME VALUE OF MONEY Financial Accounting, Sixth Edition D.
State University of New York WARNING All rights reserved. No part of the course materials used in the instruction of this course may be reproduced in any.
Agenda for change Scottish On-call Agreement October 2012.
For discussion purposes. No implementation assurances 1 Consult 21 Interconnect & Portfolio Working Group NGN Interconnect - PSTN Emulation Blended Rate.
4. Project Investment Decision-Making
Short-Term Financial Management
GENFLEX TARIFF AND INCOPORATION OF THE MEC INTO THE NMD RULES
1The Logistic Institute – Asia Pacific Cargo Selecting Problem Abstract  The work describes a mathematical programming model for a cargo selection problem,
July 9, 2015 Georgia Department of Behavioral Health & Developmental Disabilities Residential and Respite Cost Study Overview of Proposed Rate Models.
MARITIME TRANSPORTATION MANAGEMENT
Basic teletraffic concepts An intuitive approach
Get Fundamentally Sound. Simplify to Multiply Today 1. Young children 2. High debt 3. House mortgage Loss of income would be devastating At Retirement.
I&P: Contracts Clinic 24/02/06 1 Minutes Table Derivation & Application of Overflow The focus of the presentation is on principles: How it works how we.
Cost Allocation and Activity Based Costing
EFRAG’s views on ED Leases Final comment letter 15 December 2010.
NGN Multi-Service Interconnect Link (NGN-MSIL) Robin Charles.
Chapter 5 Section 5.1 Simple Interest. The Mathematics of Finance In these sections we will learn about of the more practical uses of mathematics that.
Issue 3.2 (1 st June 2012)Author: Zack Thompson1 NCC Carrier Price List (CPL) Guidance Slides CONVEYANCE TELEPHONY These slides are provided as a ‘rough.
The Entry Capacity Transfer & Trade Methodology Statement Transmission Workstream
TELE202 Lecture 5 Packet switching in WAN 1 Lecturer Dr Z. Huang Overview ¥Last Lectures »C programming »Source: ¥This Lecture »Packet switching in Wide.
Narrowband & IP Strategy Steve Wickenden & Dave Hughes 12 November 1999.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
1 ART approves France Telecom's 2002 interconnection catalogue 30 November 2001.
21CN Legacy Interconnection Working Group 17 th December 2004 Auditorium City Place, Gatwick.
IMPLEMENTATION & MIGRATION WORKING GROUP PROVISIONING EXPERTS MEETING Wednesday 1st March 2006.
Interconnect Policy & Contract
1 EBC Workshop Introduction and Welcome.
1 ACC102: FINANCIAL ACCOUNTING Week 3: Lecture 4.
Managing Exceeded Capacity. 10 September The Issue of Exceeded Capacity DNO Connection Charging Methodologies: customers who increase Maximum Capacity.
Implementation & Migration Working Group 18 th January 2006 Kevin Young Interconnect & Numbering Services The information in this presentation relates.
1 FRIACO OFTEL INTERNET FORUM - 11 December 2000 Geoff Brighton JanWillem van den Bos.
Consult 21 Interconnect Working Group 7 Nov 2005 Ian Self Virtual Interconnect Capacity Product Outline The information in this presentation relates to.
Interconnect Policy & Contract
Lesson Objectives By the end of the lesson you will: 1.Be able to define what a calculated field is 2.Be able to create calculated fields within a query.
Business unit (if required) business unit (if required) SDH Serving Nodes Determination at the Point of Handover.
Treatment of Interest on Indexed-Linked Debt Instruments.
1 Application of the HD ratio to IPv4 [prop-020-v001] Policy SIG 1 Sept 2004 APNIC18, Nadi, Fiji.
1 DLE to NGS Migration: Contracts Clinic 24 th February 2006 The information in this presentation relates to plans currently under development and subject.
Cost of Production. The Production Function A relationship between the number of units of inputs that a firm employs and the corresponding units of output.
Copyright © 2010 Pearson Prentice Hall. All rights reserved. Chapter 5 Interest Rates.
1 Mod Review Group 126 Apr 2007 slides 126 Review Group – Restriction of Invoice Billing Period  These slides describe the business rules for the treatment.
CPS LOCAL EXCHANGE CALLS BT WHOLESALE UPDATE 2 SEPTEMBER 2004 TIM HOWSON PRODUCT DEVELOPMENT MANAGER The information in this presentation.
Pathfinder Working Group BT Centre Showcase, Registration: 9.45 am Start time: am.
1 EBC Conference Introduction and Welcome.
© 2013 John Wiley & Sons, Ltd, Accounting for Managers, 1Ce, Ch 10 1.
BT Wholesale Overflow and High Usage Options Current position - OverflowCurrent position - Overflow Principle for Route Dimensioning is that all Traffic.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
Clive Feather 6 May 2005 Virtual IECs – playing the game © Copyright THUS Group plc All rights reserved.
12 September Billing Meeting Summary. Objectives Review of EBC concepts Establish how EBC will be calculated for the following BT terminating BT Originating.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Copyright 2009 Northumberland County Council LGPS The Local Government Pension Scheme The Northumberland Pension Fund Employee.
Copyright 2009 Northumberland County Council LGPS The Local Government Pension Scheme The Northumberland Pension Fund Employee.
F2:Management Accounting. Designed to give you knowledge and application of: Section D: Cost accounting techniques D1. Accounting for materials D2. Accounting.
12 FURTHER MATHEMATICS Nominal and effective interest rates.
1 ETNS Pricing & Interconnection Interconnect tariff models Market introduction of European Numbers Serving to Service Network relationship Possible Service.
EFRAG’s views on ED Leases
STEM Strategic Telecoms Evaluation Model
STEM Strategic Telecoms Evaluation Model
CAP089/090/091 Working Group Report
Considerations for OBSS Sharing using QLoad Element
HCCAOP Scheme, Efficiency and Sharing
In-Class Example (Incremental Traffic Carried )
HCCAOP Scheme, Efficiency and Sharing
Mod 09_19 - Removal of locational constraints from Imbalance Pricing
NCC Carrier Price List (CPL) Guidance Slides
Presentation transcript:

Operation of vDLE concept Revised C&W proposal

Background C&W continue to believe that in the “virtualised” situation CPs should pay connection & rental charges as if they would have in the “actual” situation. Our proposal has been amended to reflect industry feedback –Concerns around complexity –Concerns around wishing to allow for overflow

Proposal In the situation where a DLE is closed, all payments will be based upon virtualised concept –No port rentals on actual ports will be paid, and with one exception this will also include no port rentals on actual NGS capacity Number of virtual ports to be paid for at vDLEs and the NGS to be calculated according to measured monthly traffic –By reference to Table – see next slide

Port Requirement Table

Assumptions in Table Derivation Minutes  Erlangs –9 network busy hours per day –5 days a week –Total weekend traffic = approx 20% total weekday traffic –4.33 weeks/month –5% overhead allowed for discrepancies to the above assumptions, differing month-lengths etc Erlang  Port Requirements –Standard TC4 dimensioning tables

Worked Example A 250k mins B 450k mins C 650k mins D 750k mins NGS OLO transit 300k mins Total actual traffic = 2.4M mins i.e. approx 160e Actual ports = 7xE1 CP C&D are connected by vDLE, A&B are not vPort/VIEC requirements: A – not applicable B – not applicable C – 650k = 2 x E1 D – 750k = 3 x E1 NGS – (250k+450k+300k) = 1M = 3 x E1 CP does not pay for the 7xE1 actually used on NGS route as they are paying for all virtual capacity (including NGS) Exception : if CP consistently over-dimensions NGS route (e.g. has 9xE1) they would pay the additional actual port rentals

What if traffic exceeds capacity? Once per ACO period, measure traffic actually carried versus the vDLE capacity agreed If capacity is insufficient, CP to have two options; –Option 1 : right-size route CP pays for ports required retrospectively To discourage routine under-dimensioning, 50% penalty to be paid on these ports –E.g. if 2 additional virtual ports were required, for retrospection period 3 ports will be charged for, but thereafter the penalty would not apply –Option 2 : pay for overflow CP pays for any additional minutes over those allowed in Table at ST daytime rate Overflow assumed to be same in all months –ie measurement would only take place every 4 months, so all 4 months would have same surcharge applied Accounting on bulk basis (e.g. “50k mins overflow = £52 surcharge payable”) rather than on call by call –No impact into core EBC charging For avoidance of doubt both options would be available to CPs

What about during the transition period? Given BT may adopt a pepper-pot approach to migration, what about locations where there is a mixture of migrated/non-migrated nodes? –Eg at a given time during migration in example A and C could be migrated but not B and D C&W propose to treat the location as migrated and pay as per virtualised rules once the first CP-connected DLE has been migrated in an area –This is necessary because it is complex to mix virtual and actual capacity charging –From this point, actual capacity charges to outstanding DLEs would not be levied Eg D would be charged on a virtual basis, regardless of physical capacity still being in place

Why aren’t other options acceptable to C&W? Partitioned routes –Extremely inefficient for C&W, particularly as multiple C&W nodes are interconnected to each BT node Simple “divide minutes by xxx to get number of E1s” –This does not take account of dimensioning efficiency Eg a 5xE1 route will carry 6.2 times as much traffic as a 1xE1 route – simplistic formula would assume 5 times! As C&W’s routes are large, this approach would require approx 30% more virtual ports than actual ports used today Call by call accounting in EBC –Would require changes to EBC itself rather than (reasonably) simple periodic reconciliation