Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 EBC Conference Introduction and Welcome.

Similar presentations


Presentation on theme: "1 EBC Conference Introduction and Welcome."— Presentation transcript:

1

2 http://www.btwholesale.comhttp://www.btwholesale.com 1 EBC Conference Introduction and Welcome

3 http://www.btwholesale.comhttp://www.btwholesale.com 2 Objectives of the day Report progress since the February workshop Understand the EBC Solution How would I use the Routing Plans Database System? How should I use the new files in EBC? What do I have to do? Understand progress on other issues raised Outline BT’s plans

4 http://www.btwholesale.comhttp://www.btwholesale.com 3 Scene Setting Why evolve EBC? What needs to be changed? New EBC files Security

5 http://www.btwholesale.comhttp://www.btwholesale.com 4 Agenda 09.30Coffee and Registration 10.00Introduction & Welcome 10.05EBC Solution - Routing Plan Database 11.05EBC Solution - Use of Exit POCs 11.35EBC Solution - Timeline 12.00Break 12.15 EBC Solution – New files 12.45EBC Solution - Processes 13.05EBC and NIPP 13.20Summary & Close 13:30Lunch

6 http://www.btwholesale.comhttp://www.btwholesale.com 5 EBC Solution –Routing Plan Database

7 http://www.btwholesale.comhttp://www.btwholesale.com 6 EBC Solution –Routing Plan Database Contract Provisioning Manual Appendix 24

8 http://www.btwholesale.comhttp://www.btwholesale.com 7 EBC Solution – What do we need ? We need a system with…… A uniform presentation and feel Ease of use Accessibility Validation of information DMA dates

9 http://www.btwholesale.comhttp://www.btwholesale.com 8 EBC Solution – Current Routing Plan Contents Spread sheet Routing Plans Operator details Number strings BT Switch Connections Catchment Areas

10 http://www.btwholesale.comhttp://www.btwholesale.com 9

11 http://www.btwholesale.com http://www.btwholesale.com 10

12 http://www.btwholesale.com http://www.btwholesale.com 11

13 http://www.btwholesale.com http://www.btwholesale.com 12

14 http://www.btwholesale.com http://www.btwholesale.com 13

15 http://www.btwholesale.com http://www.btwholesale.com 14

16 http://www.btwholesale.com http://www.btwholesale.com 15

17 http://www.btwholesale.com http://www.btwholesale.com 16

18 http://www.btwholesale.com http://www.btwholesale.com 17

19 http://www.btwholesale.com http://www.btwholesale.com 18

20 http://www.btwholesale.com http://www.btwholesale.com 19

21 http://www.btwholesale.com http://www.btwholesale.com 20

22 http://www.btwholesale.com http://www.btwholesale.com 21

23 http://www.btwholesale.com http://www.btwholesale.com 22

24 http://www.btwholesale.com http://www.btwholesale.com 23

25 http://www.btwholesale.com http://www.btwholesale.com 24

26 http://www.btwholesale.com http://www.btwholesale.com 25

27 http://www.btwholesale.com http://www.btwholesale.com 26

28 http://www.btwholesale.com http://www.btwholesale.com 27

29 http://www.btwholesale.com http://www.btwholesale.com 28

30 http://www.btwholesale.com http://www.btwholesale.com 29

31 http://www.btwholesale.com http://www.btwholesale.com 30

32 http://www.btwholesale.com http://www.btwholesale.com 31

33 http://www.btwholesale.com http://www.btwholesale.com 32

34 http://www.btwholesale.com http://www.btwholesale.com 33

35 http://www.btwholesale.com http://www.btwholesale.com 34

36 http://www.btwholesale.com http://www.btwholesale.com 35

37 http://www.btwholesale.com http://www.btwholesale.com 36

38 http://www.btwholesale.comhttp://www.btwholesale.com 37 EBC Solution and Exit POCs

39 http://www.btwholesale.com http://www.btwholesale.com 38 EBC & exit POCs: Current Process EBC currently uses a set of rules in conjunction with a list of exit POCs to derive the charge for: BT originated IA/CPS/118DQ Transit

40 http://www.btwholesale.com http://www.btwholesale.com 39 New Solution: Agreed Exit POC No change to charging for BT-terminated traffic or BT- originated NTS The new solution will use Exit POCs shown in the routing plan database Least cost connectivity path to get to the agreed exit POC Changes to EBC algorithms, but not the use of EBC data

41 http://www.btwholesale.com http://www.btwholesale.com 40 New Solution - Agreed Exit POCs (AEPs) Routing Plan data will directly drive EBC charge bands The Routing Plan data shows catchment area, number block and BT switch passing calls to CPs, e.g. Ipswich, 01473292, Ipswich Unit A The routing plan database will show: If/when DMA has been raised by the Operator Agreed date of change on DMA When DMA has been implemented by BT The exit POC for a given origin will be that agreed to be in place when the EBC data goes live

42 http://www.btwholesale.com http://www.btwholesale.com 41 Use of Agreed Exit POCs, BT-originated Processing logic for each traffic type originating from a BT DLE: Is the DLE a POC? YESNO Use the POC in the Routing Plan for charging Select Tandem to use as AEP from Routing Plan Obtain EBC charge band from DLE to Agreed Exit POC

43 http://www.btwholesale.com http://www.btwholesale.com 42 Use of Agreed Exit POCs, transit Processing logic for transit traffic at each BT tandem: Is the tandem an Exit POC? YESNO Use the POC in the Routing Plan for charging Obtain EBC charge band from tandem to Agreed Exit POC Identify the Agreed Exit POC from the Routing Plan

44 http://www.btwholesale.com http://www.btwholesale.com 43 Benefits Transparency CP control Predictability Simplification

45 http://www.btwholesale.com http://www.btwholesale.com 44 EBC Solution and Timeline

46 http://www.btwholesale.com http://www.btwholesale.com 45 EBC Solution - Timeline - DMAs EBC Matrix ‘Y’ Build Start Date EBC Matrix ‘Y’ Effective Date EBC Matrix ‘X’ Effective Date EBC Matrix ‘X’ Build Start Date If DMA ‘A’ Agreed Implementation Date is during this period, then changes will be included in Matrix ‘Y’. DMA ‘A’ may be raised during this period for inclusion in Matrix ‘Y’. If DMA ‘A’ Agreed Implementation Date is during this period, then changes will NOT be included in Matrix ‘Y’.

47 http://www.btwholesale.com http://www.btwholesale.com 46 EBC Solution and Two New Files

48 http://www.btwholesale.com http://www.btwholesale.com 47 New Files – The Drivers Alignment with agreed routing Charging predictability Enabling routing optimisation Need for enhancements: Shows only existing points of connect Retardation of number ranges Exchange mapping Non-contractual traffic Effort

49 http://www.btwholesale.com http://www.btwholesale.com 48 Two New Files A new file to assist CPs receiving traffic from BT A new file to assist CPs delivering traffic to BT Standard EBC file format Standard naming convention Standard header and trailers Comma-separated format data records

50 http://www.btwholesale.com http://www.btwholesale.com 49 File 1 – Receiving Traffic from BT A BT-switch-to-BT-switch matrix, with charge band Any traffic type Valid call routing scenarios E.g. a DLE origin would be shown against the following destinations: For BT-originated traffic, the DLE itself and all switches that could be Exit POCs For transit traffic, nothing Each data record will contain: origin exchange NNI, destination exchange NNI, EBC charge band Transit / Non-transit charge bands

51 http://www.btwholesale.com http://www.btwholesale.com 50 File 1 – DLE Example 0646006,0646006,520 0646006,0945010,521 … 0646006,1311001,525 0646006,1311618,525 0646006,1312997,525 … 0646006,1440182,521 0646006,1441455,521 0646006,1455134,525 0646006,1460128,525 … 0646006,4012629,525 0646006,4014559,525 0646006,4015916,525 0646006,4016350,525 … 0646006,5945021,521 Directly connected WATs WATs tandemed with directly connected WATs All SYSX DMSUs Itself Middleton Unit C (DLE) All NGS DMSUs Directly connected SYSX DLTEs Directly connected AXE10 DLTEs

52 http://www.btwholesale.com http://www.btwholesale.com 51 File 1 – Trunk Example All SYSX DLEs and DLTEs All SYSX DMSUs All ASUs Ipswich Morganite (NGS DMSU) All NGS DMSUs … 4073327,0723111,524 4073327,0723118,524 4073327,0724119,523 4073327,0724166,523 … 4073327,1311001,529 4073327,1311618,529 4073327,1312997,529 … 4073327,1712241,525 4073327,1712300,525 4073327,1715359,525 … 4073327,4012629,529 4073327,4014559,529 4073327,4015916,529 … 4073327,5710060,525 4073327,5710312,525 4073327,5710360,525 … All AXE10 DLEs and DLTEs

53 http://www.btwholesale.com http://www.btwholesale.com 52 File 1 – Benefits to CPs Transparency Trunk-to-trunk connectivity Routing plan applicability Mapping to catchment areas All possible points of connect covered

54 http://www.btwholesale.com http://www.btwholesale.com 53 File 2 – Delivering Traffic to BT Point of connect to number block, with EBC charge band Full-length number blocks Valid call routing scenarios E.g. a WAT origin would be shown against the following destination number blocks: BT number blocks hosted on directly connected DLEs CP number blocks accepted at this WAT Each data record will contain: origin exchange NNI, destination number block (unretarded), EBC charge band

55 http://www.btwholesale.com http://www.btwholesale.com 54 File 2 – DLE Example 0973004,0120671,520 0973004,01206760,520 0973004,01206761,520 … 0973004,01394380,520 0973004,01394385,520 0973004,01394389,520 0973004,01394600,520 … 0973004,01473106,520 0973004,0147321,520 0973004,0147322,520 0973004,01473230,520 0973004,01473231,520 0973004,01473232,520 … 0973004,0172845,520 0973004,0172860,520 0973004,01728633,520 … 0973004,01787220,520 0973004,01787221,520 0973004,01787222,520 Unretarded BT number blocks hosted on DLE Ipswich Unit B (DLE)

56 http://www.btwholesale.com http://www.btwholesale.com 55 File 2 – Benefits to CPs Full length number blocks Only valid routing shown Route Optimiser-friendly No need to expand out retarded number blocks Invalid routings will not be shown

57 http://www.btwholesale.com http://www.btwholesale.com 56 EBC Solution - Processes

58 http://www.btwholesale.com http://www.btwholesale.com 57 EBC Solution - Processes Most processes unchanged Preparation of Routing Plans Submission of DMAs Timing of DMAs Checking DMA Dates

59 http://www.btwholesale.com http://www.btwholesale.com 58 EBC Solution - Processes Use two new files to: Switch to switch file - where to receive calls POC to Number Block file - where to deliver calls to BT When published run checks Re-distribute traffic flow Open up new connections as necessary

60 http://www.btwholesale.com http://www.btwholesale.com 59 EBC and NIPP

61 http://www.btwholesale.com http://www.btwholesale.com 60 EBC and NIPP – Alignment of Data Worked on aligning Implication of Dates Dates to align Current data Planning data

62 http://www.btwholesale.com http://www.btwholesale.com 61 EBC and NIPP – Rationalisation of Files Previously announced Duplicated files removal Both EBC and NIPP Web site for network Briefings Some Increased

63 http://www.btwholesale.comhttp://www.btwholesale.com 62 EBC Workshop Summary & Close

64 http://www.btwholesale.com http://www.btwholesale.com 63 EBC Solution - Summary Routing Plan Database Two New Output Files EBC and NIPP Communicate progress on delivery Thank you… and lunch


Download ppt "1 EBC Conference Introduction and Welcome."

Similar presentations


Ads by Google