The SESAR Definition Phase is co-financed by the European Community and EUROCONTROL Responding to the 2020 Challenge Introduction to SESAR DEFINING THE.

Slides:



Advertisements
Similar presentations
EUROCAE WG 73: UAS integration Elements for the European Commission UAS panel Presentation at Workshop 2 UAS insertion into airspace Gérard Mardiné (SAFRAN-Sagem)
Advertisements

Unmanned Aircraft Systems EUROCONTROL ATM Integration
Transport TEN-T 2012 Calls for Proposals Info Day SESSION 2 MULTIMODAL AND CROSS-CUTTING PRIORITIES AIR TRAFFIC MANAGEMENT Unit Single European Sky - DG.
Performance Review Commission, and performance management of the European ATM system Keith C. Williams, Chairman PRC.
The Single European Sky ATM Research (SESAR) initiative
The global voice of ATM The Global Voice of ATM The Need for Modernisation of ANSPs.
1 PHARE and Reality by Wolfgang Philipp Senior Director EATMP EUROCONTROL.
Introduction ATMCP and Performance Dominique Colin de Verdière (CENA) Bernard Miaillier (Eurocontrol) TIM9 - ATMCP-RTSP May 2002.
The SESAR Definition Phase is co-financed by the European Community and EUROCONTROL 19 February, 2006 SESAR ATM Master Plan An introduction.
17th February 2004: Slide 1 DG Transport and Energy OATA Workshop 17th February 2004 European Commission OATA and the Single European Sky.
The EMERALD RTD Plan and the ASAS Validation Framework R P (Bill) Booth 10 October 2002.
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
Mission Trajectory Step 1 From planning to deployment.
ASAS TN Second Workshop, 6-8 October 2003, Malmö ASAS-TN Implementation Strategy Plan Tony Henley BAE SYSTEMS.
SESAR TEN-T day. Content ●SESAR investments and timing ●Network effect ●Validation and certification activities ●Conclusion.
Episode 3 Operational Concept Detailing Episode 3 - CAATS II Final Dissemination Event Ros Eveleigh & Eliana Haugg EUROCONTROL & DFS Episode 3 Brussels,
Future Airspace Strategy (FAS) Heathrow Airport Consultative Committee 31 st March 2010 Phil Roberts Assistant Director of Airspace Policy 1 1.
Episode 3 1 Episode 3 EX-COM D Final Report and Recommendations Operational and Processes Feasibility Pablo Sánchez-Escalonilla CNS/ATM Simulation.
Enav.it Session 3 Steps towards the SESAR deployment and the ATM system modernisation.
1 Data Link Roadmap Overview Mike Shorthose, Helios Technology Jorge Grazina, European Commission 25 September 2002.
Advanced Safe Separation Technologies and Algorithms (ASSTAR) Project ASAS-TN2 Workshop #1 Malmö 26 th -28 th September 2005 ASSTAR is a Specific Targeted.
SESAR and ASAS Opportunity
The European Organisation for the Safety of Air Navigation Ian Middleton, Deputy Director EUROCONTROL - Directorate Single Sky Amsterdam, 27 April 2012.
ASAS TN II Workshop Malmö Sept 26-28, 2005 SESAME An initiative for the Single European Sky from the European air transport community.
SESAR Single European Sky Air traffic management Research
FASVIG Introductory Meeting
Enav.it Channelling Finance and Innovation to Industry Steps towards the Air Traffic Management system modernisation.
Frank Brenner Director General, EUROCONTROL European ATM Israel Civil Aviation Conference, 18th November 2013.
ATM Conference, Oslo May 19 th, 2015 ATM Master Plan 2015 Consequences for cost, safety, performance and environment.
Page Lufthansa ASAS It's Time for a paradigm change... Workshop May 2003, Rome
David Bowen Head of ATM Operations and Systems
DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT SWIM-SUIT Public launch Rome 23 April 2007 Morten JENSEN European Commission.
09/12/20091/41 Rome, SWIM-SUIT User Forum Cost-Benefit Analysis of the European SWIM Infrastructure Miguel Vilaplana - BR&T Europe.
Draft High Level Operational Concept V0.4 Mode of Operation for the Single European Sky Deployable from /11/04.
- Session 4: Interoperation José M. Roca Air/Ground Cooperative ATS Programme Eurocontrol.
Containing Aviation Emissions in the Short-term
Nigel Makins EUROCONTROL
IFly project: Airborne Self Separation as basis for advanced en route ATM Henk A.P. Blom iFly coordinator National Aerospace Laboratory NLR
ASAS WORKSHOP Roma April 2003 Airlines’ perspective Nicolas Zvéguintzoff Assistant Director- Technical / Financial Liaison – Europe.
KLM - Operations at Schiphol: how does ASAS fit? ASAS TN2: final seminar, April, Paris E. Kleiboer Sr. Manager Strategy ATM.
MFF is a EC co-funded programme Rome, 3-5 Aprili 2006 ASAS-TN2 Rome, 3-5 April 2006 Maurizio Zacchei, ENAV (MFF PM) Mediterranean Free Flight Programme.
ASAS TN2 Final Seminar Paris, April 2008 Recommendations by the ASAS Thematic Network Ken Carpenter.
A Vision Based on Achievable Expectations Jack Howell Director / Air Navigation Bureau Agenda Item 1.
1 Vince Galotti Chief/ATMICAO 26 March 2007 A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART I FITTING THE PIECES TOGETHER.
C-ATM User Group and ASAS…….. Presented on Behalf of the C-ATM User Group Billy Josefsson, LFV Group ASAS Thematic Network 2, Malmö /28.
Visit of Mr Griffiths, DG CAA UK - 20 December 2007 EUROCONTROL.
Final Seminar, Paris, April 2008 ASAS in the SESAR Master Plan Fraser McGibbon (BAE Systems) Andy Barff (EUROCONTROL EEC) ASAS-TN2 Seminar Paris.
1 ILA Berlin - May 2008 Marc Brochard - EEC EPATS ATM General Requirements & relative issues to be solved.
SESAR and GA Michael Erb Member of SESAR Excom IAOPA Regional Meeting Larnaka, 22nd September 2007.
© EUROCONTROL European Air Traffic Management Programme The European ATM Master Plan ASAS TN Dave Young, Business Dev. Manager, EEC.
19-21 April 2004ASAS TN – 3 rd workshop AIRLINES/IATA OVERVIEW Needs and Considerations Anthony van der Veldt/IATA Assistant Director Safety Operations.
1 From Planning to Implementation. 2 Aviation Needs ECIP Institutional Arrangements EATM Programmes Implementation & Operations Europe wide Planning LCIPs.
A consolidated starting point from DFS / AENA / LFV ASAS Thematic Network Workshop Toulouse, Is ASAS /ADS-B needed for ANSP strategy?
MAK – EUROCONTROL WORKSHOP Moscow 1 -2 July 2004 Kenneth Eideberg Stakeholder Implementation Service EUROCONTROL European Organisation for the Safety of.
DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT Information Day 6th Framework Programme 1st Call for Proposals, 5 Feb. 2003, Brussels ASAS operational improvements:
Why we need 8,33KHz below FL195? Regulation (EU) No 1079/2012 on VCS-8.33 kHz Bogdan Petricel / Jacky Pouzet Network Manager Luxembourg, March 2015.
1 EUROCONTROL S TRATEGIES FOR The ATM Strategy for the Years As from MATSE/6 decision (Jan. 2000): To cater for forecast increase in demand.
Petros Stratis – BLUE MED Project representative – DCA Cyprus Co-financed by the EU (TEN-T)
ASSTAR Overview Jean-Marc Loscos, DSNA
AVIATION SYSTEM BLOCK UPGRADES (ASBU)
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
Global ATM Operational Concept
London 14 October 2015 Freek De Witte Head of Stakeholder Relations
ASSTAR Project Overview & User Forum Objectives
PROGRESS & CHALLENGES ATCOS’ VIEWS
The Single European Sky Implementation Programme: SESAME
What is SESAR? SESAR is the European program for air traffic management infrastructure modernisation. SESAR aims at the development of the next generation.
Directorate-General Energy and Transport
ICAO Forum on Integration and Harmonization of NextGen and SESAR into the Global ATM Framework 8-10 September 2008 Lex Hendriks Deputy Director DAS, EUROCONTROL.
The Need for Modernisation of ANSPs
Presentation transcript:

The SESAR Definition Phase is co-financed by the European Community and EUROCONTROL Responding to the 2020 Challenge Introduction to SESAR DEFINING THE FUTURE EUROPEAN AIR TRAFFIC MANAGEMENT SYSTEM FOR 2020 AND BEYOND Dipl. Ing. Susanne Reed, Airbus ASAS TN2 Workshop & FLYSAFE Forum, Toulouse

Page : 2 We need to address some challenges ! Traffic demand Complex institutional framework Fragmented operations Existing infrastructures Influences & Considerations Institutional Drivers Influences & Considerations Institutional Drivers Delays Costs Environment THE SESAR DEFINITION PHASE STUDY

Page : 3 The Demand is growing – ATM is near its limits! The current Air Traffic Management … … is nearing the end of its ability to deliver the capacity necessary to accommodate the increasing demand. Both the underlying operational concept and the supporting technologies need major improvements. The existing airport infrastructure … … cannot fully accommodate the increasing demand. Whereas the European traffic … … will almost double by 2020, i.e. 18 Million IFR flights per year.

Page : 4 Military Definition Phase involves all Stakeholder categories Prof. Staff Associations ANSPs EU Industry Research Centres Airports Airspace Users Eurocontrol Safety Regulator US Industry

Page : 5 SESAR – The Definition Phase : Building the Master Plan for the Future Analyse air transport value and role of ATM ATM Target Concept selection D eployment sequenceanalysis Build the ATM Master Plan Defineorganisation& work - programme months The Market Its Requirements The Top Product How to Build it Action Plan Go! PerformanceRequirement s PerformanceRequirement s COMPLETED D1: - A sharedview ofcurrentsituation- Agreementon blockingpoints andway aheadCOMPLETED D1: - A sharedview ofcurrentsituation- Agreementon blockingpoints andway ahead COMPLETED D2: - ATM PerformancePartnership - Performance requirementsCOMPLETED D2: - ATM PerformancePartnership - Performance requirements ON-GOING D3: The selectionof a viablesolution..... The Concept of Operations ON-GOING D3: The selectionof a viablesolution..... The Concept of Operations

Page : 6 Designed for Growth – Deployed by 2020 A Performance-based partnership builds the European ATM System of the future Design Targets of the ATM System: Capacity 3-fold Safety x 10 Minimize Environmental Impact Direct ATM Costs 1/2

Page : 7 The Response is a Paradigm Shift

Page : 8 Implementation Packages (IP) & Roadmap View ATM Target Concept (D3) Concept Area Concept Area Concept Area Vision / Performance Objectives (D2) Current Status / Issues (D1) Transition Scenario (IP sequence) (D4) Master Plan (D5) Implementation Package 1 Implementation Packages 2 & 3 Implementation Package m today …beyond OI Step 1.a OI Step 1.b OI 1 OI Step 3.a OI Step 3.q OI 3 OI Step 2.a OI 2 OI Step 2.p IP 2 IP 1 IP 3 IP m

Page : System BasedPerformance Based Cooperating ground and airborne decision making tools Moving from airspace to trajectory based operations New Separation Modes Information Management ATM Operational Concept Queue management tools Short Term Medium Term Long Term

Page : 10 Definition Phase JU Incremental Steps towards the deployment of the new ATM Target Concept 20xx Time Development Phase Deployment Phase SESAR R&TFSDP * Baseline 2013 Mid-term Target R&T * Baseline 2020 Nominal Target FS DP * Target 20xx Research & Technology Feasibility Studies Deployment Long-term After 2020 FS DP Short-term Before 2013 * Quick Wins Nominal R&TFSDP Project Phases Level 3 Level 2 Level 1 Level 4

Page : 11 Involvement, from all stakeholders at all levels, in building this common roadmap is the key for success SESAR began yesterday and its future starts today!