Vibration Isolation Box

Slides:



Advertisements
Similar presentations
Pneumatic Cylinders Chapter 3.
Advertisements

PLANE SENSE INVESTIGATION. KEY CONCEPTS A SYSTEM IS A SET OF RELATED OBJECTS THAT CAN BE STUDIED IN ISOLATION THIS COULD BE; THE PARTS OF AN AIRPLANE,
Build Your Own Future RC2 Serviceability. Build Your Own Future Safety and Ground Rules Before servicing, always remove A/C power from the unit and disconnect.
1 Lincolnshire Fire & Rescue Training Centre FIXED INSTALLATIONS FOAM INLETS COMPETENCE STATEMENT 375.
Expand Media Wall & Podium Case Training Video’s & Instructions.
Installing a double Dreamscreen. Check measurement Left.
Optical Manufacturing Solutions 1 Probe Assembly.
How to carry out experiments using MPMS March 2012 Takeshi NAKAGAWA.
Search and Rescue Trailer Bungay Fire Brigade 2013.
To Find and Open Your Locker.  Your locker will either be in the Upper A Hallway or the D Building Hallway.
BalloonSat Construction Ideas and Suggestions. What is a BalloonSat? Functional Model of a Satellite Carried by Balloon to at Least 60,000 Feet Operates.
Mer/Sup. 2 & 3 Door Evaporator Coil Repositioning Procedure S. Starnes 7/11/03 1. Remove the 2 screws holding one end of the evaporator coil. (view shows.
Hurst Tool Technique for Removing Doors Simultaneously.
Vent window installed. Install door frame side latch.
An animal’s habitat consists of the natural environment in which it lives. In order to take animals into space we must artificially provide the animal.
The Little Nikki Assembly Instruction By Laser Dollhouse Designs.
UTAH STATE UNIVERSITY GET AWAY SPECIAL RESEARCH TEAM K-Bird Current & Future Projects Get Away Special Outreach The KC-135a, or K-Bird, is an aircraft.
Residential Construction Residential Doors Installation Guide Source: Carpentry & Building Construction Feirer & Feirer / Lowe’s How-To Library.
By Eric Berard, Daniel Ontiveros, and Jacob Brasch.
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
Product Design Sketching Activity
Colorado Space Grant Consortium Foam Core Class #05 Foam Core Class #05.
5.8m Solar House Installation Instruction. Introduction Step 1. connect the corner panels Step 2. connect the back and side wall panels Step 3. Install.
Earth To Orbit and In Space Propulsion Systems: ION Drive Technology Jason Jayanty and Randy Parrilla Mentors: Dr. Siva Thangam and Professor Joseph Miles.
ACOUSTICAL FOAM PANELS ANTHONY andTORREFIEL. Acoustic foam is an open celled foam used for acoustic treatment. It attenuates airborne sound waves by increasing.
Lighter-than-air Aviation
Energy, Waves, and Sound James Shaffer Kansas State University.
“Move & leave” lens zoom and focus adjustment method. “Move & leave” lens zoom and focus adjustment method. Patent no.: Patent no.:
Shielding the Weiner PSU 7 May 2013 Kiril Marinov ASTeC, MaRS, DL 1.
Principles of Rocketry. Isaac Newton's 3 rd law of Motion For every action there is an equal and opposite reaction For every action there is an equal.
Chapter 24 Space Vehicular Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify.
COMPRES 2007 Annual Meeting COMPRES Gas Loading System at APS Progress Report June 2007 Mark Rivers.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting Approved Labyrinth Fresh air pulled through “chicken wire” gate.
The crew of the space shuttle Columbia wave before boarding January 16. They are leaving the Operations and Checkout Building at the Kennedy Space Center.
12 feet 4 feet Top view Removable fronts 4x4 posts Slats 1x4x ¾” spaced ¾”
A ball rolls off of a.68 m tall table and hits the floor with a speed of 6.0 m/s. How fast was the ball moving when it left the table.
This is a fold-down clothes bar that will hold up to 12 plastic clothes hangers or even more wire hangers. As I don’t have a trailer wall to put it on,
Jeopardy Nothing’s Shocking Laws of Attraction Measure- ments Full of energy Don’t Push Me Q $100 Q $200 Q $300 Q $400 Q $500 Q $100 Q $200 Q $300 Q $400.
Vibration Isolation Box Design a system for dampening out the vibrations associated with launch and landing for a box that will fit inside a middeck locker.
Plot Systems Analysis. I will evaluate the plot of Burn-E as a system. Success Criteria  I can identify the five elements of plot in the story.  I can.
Space Shuttles By Frederick. Launching Space Shuttles To lift the 4.5 million pound (2.05 million kg) shuttle from the pad to orbit (115 to 400 miles/185.
By: Tim Beauvais. What is Aerospace?  Aerospace is the industry that researches, designs, manufactures, operates, and maintains vehicles moving through.
America will send a new generation of explorers to the moon aboard NASA’s Orion crew exploration vehicle. After that, on to MARS!!!
Chapter 13 Section 3 – pg 515 Exploring Space Today.
CM25 Engineering 1 4 Nov 2009 DIFFUSER Carousel (~50kg) Driven by air motors – 3 separate ‘actions’ 1.Carousel rotation 2.“30 degree rotation’’ Transfers.
Bouncy Task Task 1Task 2Task 3Task 4 Task 5Task 6Task 7 NC Level 5 to 7.
Mass Simulator Concepts Robert Besuner 12 October 2005.
X2x2 + x x 2 +3x +2 +2x x + 2 x 2 + x +2x +2 Learning how to do long multiplication with number and algebra.
SIZE - Top SERVER ROOM Designed by – openbox |
Uncontrolled copy not subject to amendment Rocketry Revision 1.00.
Lyndon B. Johnson Space Center - Houston, TX CELLULAR BIOTECHNOLOGY OPERATIONS SUPPORT SYSTEM Biotechnology Specimen Temperature Controller (BSTC) Functional.
NanoRacks, LLC Michael D. Johnson (832) Page No. 1 NanoRacks, LLC Cube Lab Cube Lab Ops TIM – Cube Lab Introduction 11/19/2009 Michael D. Johnson.
Note: The first status check should occur on the launch flight day prior to crew pre-sleep. This is the only feedback the Glacier team has that the Glacier.
SURFACE AREA & VOLUME RECTANGULAR PRISM – AREA RECTANGULAR PRISM – VOLUME.
5/17/2010 Document under Export Control. See page 2. 1 SSCN Structural Launch Enclosure to Effectively Protect Robonaut (SLEEPR) LM CMC Contact Keith.
SPACE SHUTTLE.
Learning objectives consider what happens when a spring is stretched describe what is meant by gravitational potential energy calculate the energy.
Pima Community College Payload Results Team Members: Zach Anderson, Eric Nelson, Henry Reiner, Charles Schied, Yisun Se, Abraham Contreras 22th Annual.
Forms of Energy.
Camera Payload Design & Intent Annual Arizona Space Grant Consortium ASCEND! Gemma Thomas Pima Community College Mentor: Mike Sampogna Pima.
Introduction to Energy.
ProLine & ProLine+.
PIPE LIFTING KIT HAMMER MULETRAX 2300 C
EUROFREEZE.
Ballista Project 2 120mm Axle hole 3 Nails 1 200mm
Welcome to Middle School. You now have your very own locker!
MASATS Door Systems.
Bream Plus lid closing problem
SURFACE AREA.
VEHICLE TECHNOLOGY AIR CONDITIONING SYSTEMS.
Presentation transcript:

Vibration Isolation Box Design a system for dampening out the vibrations associated with launch and landing for a box that will fit inside a middeck locker. This box might have experimental equipment or materials. Imagine this box holding strawberries. How do you get the strawberries up there and back home without it being turned into a box of jam?

Requirements The object to be launched may be as massive 15kg with a volume as large as 300mm x 260mm x 190mm. This box should be easy to open and close and lock Allows for decompression of the launch vehicle without expansion Re-useable Flight appropriate materials—not flammable, no off-gassing Can be packed into the vehicle in any orientation

Middeck Locker This is a Middeck Locker that was originally designed to fit into the middeck of the space shuttle. NASA HUNCH teams are working to build some of these for flight to the station on the newer vehicles. This is the locker design we would like to outfit with some kind of isolation system that would allow a small sensitive payload to fly up in. This payload box should be easy to install into the middeck locker Thoughts for the isolation should include but not limited to: Bungees, springs, foam, rubber bands, magnets (much more difficult due to electro-magnetic fields generated by the magnets), air cushions (beware of expansion due to loss of atmosphere—hole in hull) Could you add or remove some of your isolation system (springs, bungees,…) to account for the mass of the payload? A large payload space is desired so size your isolation system appropriately so the isolators don’t bottom out on the walls of the This could launch and land in nearly any orientation.

Back side of middeck locker with rear closeout panels removed. View of inside of locker from the front. Attachment points of locker to structure for launch and landing

Door of Locker Looking down on top of locker.