IUPAP, Vancouver (Canada), July 2010 11 Status of the EU-FP7-funded Integrating Activity European Nuclear Science and Applications Research (ENSAR) Christoph.

Slides:



Advertisements
Similar presentations
Symantec 2010 Windows 7 Migration EMEA Results. Methodology Applied Research performed survey 1,360 enterprises worldwide SMBs and enterprises Cross-industry.
Advertisements

EURONSTown Meeting Septrmber 2007, Helsinki Towards a new I3 proposal of the European nuclear structure community At the NuPECC meeting in Muenchen.
1 NuPECC/ERA-NET, Paris; 27 May 2005 NuPECC LRP & Nuclear Physics ERA-NET Muhsin N. Harakeh NuPECC & KVI.
NuPECC, March 2011, Paris, France 1 Progress Update of (ENSAR)European Nuclear Science and Applications Research Muhsin N. Harakeh KVI & GANIL NuPECC.
Extreme Light Infrastructure (ELI) 4 Pillars (2009): I. CZECH REPUBLIC: Secondary Sources 10PW II. HUNGARY: Short Pulses 10PW III. ROMANIA: Nuclear Physics.
Goal 1: acquire a mutual and better understanding of the Funding systems of nuclear physics infrastructures and associated equipments in Europe that is.
NuPECC Meeting October , 2011 Budapest Achim Richter, ECT* and TUD Directors Report
ERA-NET Cooperation and coordination of national research and innovation activities Last call 2005 Deadline September-October.
NuPECC Meeting, 8 June 2013; Florence 1 European Nuclear Science and Applications Research 2 (ENSAR2) Muhsin N. Harakeh Coordinator ENSAR on behalf of.
Perspectives of Croatian experimental nuclear physics Neven Soić Division of experimental physics Ruđer Bošković Institute NuPECC meeting 13. Jun 2008.
NUSTAR ECOS meeting held on the 27 of May 2005 in Paris (University of Jussieu): Three items: -The ECOS document for NuPECC -The ECOS town meeting.
NuPECC Long Range Plan 2010 Perspectives for Nuclear Physics Research in Europe Guenther RosnerNuPECC Meeting, Bergen, 11/6/101.
Funding Opportunities in Europe A Personal View Gabriele-Elisabeth Körner.
NuPECC LRP2010 Workshop, October 2009, Frankfurt, Germany 1 European Nuclear Science and Applications Research (ENSAR) Muhsin N. Harakeh NuPECC Long.
Alex C. MUELLER, NuPECC meeting, Athens, March EURONS 1st annual report: Generalities (I) With an EC contribution of 14,056,000 EURONS is.
NuPECC Meeting, 7-8 October 2011; Budapest, Hungary 1 European Nuclear Science and Applications Research (ENSAR) Muhsin N. Harakeh NuPECC Meeting 7-8 October.
ENSARNuPECC Meeting 7-8 March 2008, Madrid European Nuclear Science and Applications Research (ENSAR) At the NuPECC meeting in München on June 2007.
NuPECC Meeting, 9-10 March 2012; Milano, Italy 1 European Nuclear Science and Applications Research (ENSAR) Muhsin N. Harakeh NuPECC Meeting 9-10 March.
NuPECC Long Range Plan 2010 Perspectives for Nuclear Physics Research in Europe Guenther Rosner NuPECC LRP2010 Town Meeting Madrid, 2/6/10 1.
Research Infrastructures WP 2012 Call 10 e-Infrastructures part Topics: Construction of new infrastructures (or major upgrades) – implementation.
Planning and use of funding instruments
Policy Research and Innovation Research and Innovation EUROSTARS JOINT PROGRAMME Research and Development programme undertaken by several Member States.
1 7 th Progress Report: The regional and urban dimension of Europe 2020 Lewis Dijkstra Deputy Head of the Analysis Unit DG for Regional Policy European.
A case history of CFD support to Accelerator Driven System plant
PP Test Review Sections 6-1 to 6-6
HORIZON 2020 STEPHEN FOX FOR KEELE UNIVERSITY 26 TH FEBRUARY 2014.
Mobility Tool Fremtidens afrapportering 2013 – Erasmus Mobilitet / IP 2014 – Erasmus+ aktioner.
© 2012 National Heart Foundation of Australia. Slide 2.
Project's financial status
Michele Punturo European Gravitational Observatory and INFN-Perugia On behalf of the GW ILIAS-next community Gravitational Wave Network.
Directorate General for Energy Dr Kyriakos MANIATIS Principal Administrator Energy Technologies & Research Coordination DG ENER, European Commission Biofuels.
PSSA Preparation.
Helsinki Sept 2007 S.Galés ERA-NET Supporting Cooperation for research infrastructures in all S&T fields 7 th FP Call Capacity Work Program: Infrastructures.
Wolfhard Möller | Institute of Ion Beam Physics and Materials Research | Wolfhard Möller Institute of Ion Beam Physics and Materials.
Giovanni Ciavola I3 EURONS-2 COMPLECS Town Meeting, Sept. 19th, 2007, Helsinki 1 INFN - GSI - GANIL - LPSC - JYFL - KVI CERN - ATOMKI- TSL - NIPNE - IKF-
Alex C. Mueller, MANETEURONS PCC-Meeting, Mainz (Germany), April 2006 EURONS 1st annual report: Generalities (I)  With an EC contribution of 14,056,000.
The next call FP Infrastructures-5. FP Infrastructures-5 Call outline (1) All fields of S&T are covered Publication date: 4 November 2004.
NuPECC Meeting, March 2014; Strasbourg, France 1 “European Nuclear Science and Applications Research” (ENSAR) Muhsin N. Harakeh Coordinator ENSAR.
EURONS The EUROpean Integrated Infrastructure Initiative in Nuclear Structure within FP6 Present status and remarks to NuPECC Alex C. Mueller,
EURISOL – Distributed Facility (DF) Y. Blumenfeld, M. Lewitowicz, P. Van Duppen, A. Maj Background : EURISOL RTD : EURISOL Design Study.
The HEAP-MM proposal P. Piattelli VLVnT The call  INFRA Research Infrastructures for astroparticle physics: High energy cosmic rays,
F. Azaiez (IPN-Orsay) The European Collaboration for Stable Ion Beams – ECOS Pushing the limits with high intensity stable beams A typical bottom up initiative.
1 Status of the EU-FP7 funded Integrating Activity “European Nuclear Science and Applications Research” (ENSAR) Marek Lewitowicz (GANIL) on behalf of Muhsin.
EURONS The EUROpean Integrated Infrastructure Initiative in Nuclear Structure within FP6 Present status and remarks to FINUPHY Alex C. Mueller,
ERA-NET Supporting Cooperation for research infrastructures in all S&T fields 7 th FP Call Capacity Work Program: Infrastructures Deadline May 2 nd 2007.
Mapping Studies In preparation NuPECC Handbook 2004 “International Access to Nuclear Physics Facilities in Europe”, 5th Edition In print NuPECC Long Range.
“European Nuclear Science and Applications Research 2” (ENSAR2)
Alex C. Mueller for EURONSNuPECC Meeting, Venice (Italy), March 2005 I3 EURONS: a status report to NuPECC March 2005.
NuPECC Meeting March 09-10, 2012 Milano Achim Richter, ECT* and TUD Director’s Report
7 December 2007CERN-EU Office1 Svet Stavrev Office of EU Relations, CERN First FP7 Call for Integrating Activity projects*  IA as support to existing.
ENSAR : European Nuclear Structure and Application Research Maria J. G. Borge.
NuPECC Meeting, October 2013; Kraków, Poland 1 “European Nuclear Science and Applications Research 2” (ENSAR2) Muhsin N. Harakeh Coordinator ENSAR.
DF ALTO IN2P3 DF ISOLDE CERN SPES INFN SPIRAL2 GANIL MYRRHA SCK-CEN … COPIN EURISOL – Distributed Facility (DF) Initiative H. Savajols – Convenor.
NuPECC Meeting, March 2016; ECT*, Trento, Italy 1 “European Nuclear Science and Applications Research 2” (ENSAR2) Muhsin N. Harakeh Coordinator ENSAR2.
Report from the Simulation & Data Analysis Working Group NUSTAR week – Bucharest 10/2011 Convener: Marc Labiche
NuPECC Meeting, June 2014; Jyväskylä, Finland 1 “European Nuclear Science and Applications Research” (ENSAR) Muhsin N. Harakeh Coordinator ENSAR.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
European Small-Scale Accelerator Facilities S. Harissopulos: NuPECC Strategy Meeting, Darmstadt, January 16, 2016.
NuPECC Meeting, 7-8 October 2016; Vienna, Austria 1 “European Nuclear Science and Applications Research 2” (ENSAR2) Muhsin N. Harakeh Coordinator ENSAR2.
Discussions on preparations for future (joint) research projects
for the EURISOL Steering Committee
Accelerator Research and Innovation for European Science and Society
EU-Russia Cooperation in the Areas of Science, Research and Innovation
“European Nuclear Science and Applications Research 2” (ENSAR2)
European Nuclear Science and Applications Research (ENSAR)
European Nuclear Science and Applications Research (ENSAR)
ENSAR2 Status and Progress
AMICI WP1 – Management, coordination and dissemination
Presentation transcript:

IUPAP, Vancouver (Canada), July Status of the EU-FP7-funded Integrating Activity European Nuclear Science and Applications Research (ENSAR) Christoph Scheidenberger (GSI) on behalf of Muhsin Harakeh (ENSAR Coordinator)

IUPAP, Vancouver (Canada), July ENSAR is the Integrating Activity of Nuclear Scientists from almost all European countries performing research in three of the major subfields of Nuclear Physics: Nuclear Structure, Nuclear Astrophysics and Applications of Nuclear Science. It proposes an optimised ensemble of Networking (NAs), Transnational Access and Joint Research Activities (JRAs), which will ensure qualitative and quantitative improvement of the access provided by the current seven infrastructures, which are at the core of this proposal. The novel and innovative developments that will be achieved by the JRA activities will also assure state-of-the-art technology needed for the new large- scale projects.

IUPAP, Vancouver (Canada), July Integrating Activities Call in July 2009 INFRA : Research Infrastructures for Nuclear Physics. A project under this topic should aim at integrating the key research infrastructures in Europe for studying the properties of exotic nuclei, and turning advances in nuclear physics experimentation into new applications. Targeted call; budget < 10 M ! Submitted Proposal: Large community 10 M for 4 years 7 TNAs 4.52 M 7 JRAs 4.01 M 6 NA M

IUPAP, Vancouver (Canada), July Partners of GANIL GSI LNL-INFN LNS-INFN JYFL RUG-KVI CERN-ISOLDE ALTO-CNRS TUW ULB KUL CEA INRNE-BAS RBI NP I TUD NCSRD ATOMKI-HAS ECT* UWAR IFJ-PAN FFCUL IFIN-HH USC CIEMAT UCM PSI UNIBAS JOGU UNIMAN 29 beneficiaries 18 countries 29 beneficiaries 18 countries 7 TNA facilities 53 associated partners

IUPAP, Vancouver (Canada), July Transnational Access Facilities in ENSAR TNA1 (Access to GANIL, 3510 hours of beam) TNA2 (Access to GSI, 3750 h) TNA3 (Access to INFN-LNL&LNS, 4424 h) TNA4 (Access to JYU-JYFL, 3000 h) TNA5 (Access to KVI, 800 h) TNA6 (Access to CERN-ISOLDE, 5200 h) TNA7 (Access to ALTO, 1470 h) 5 Strong emphasis on the support for users ( % of the TNA EC request)

IUPAP, Vancouver (Canada), July Network Activities in ENSAR NA01 FISCO (FInancial & Scientific COordination) NA02 ECOS (European Collaboration On Stable ion beams) NA03 EURISOL NET (EURopean ISOL NETwork) NA04 ATHENA (Advanced THeory & Experiments for Nuclear Astrophysics) NA05 EGAN (European Gamma & Ancillary detectors Network) NA06 EFINION (European Forum for Innovative applications of Nuclear ION beams and tools)

IUPAP, Vancouver (Canada), July Joint Research Activities in ENSAR The JRAs deal with all aspects of experimental activities from sources and targets, to detectors, simulations of experimental set-ups, data analysis and development of adequate theoretical tools JRA01 ARES (Advanced Research on ECR ion Sources) JRA02 ActILab (Actinide ISOL target R&D Laboratory) JRA03 PREMAS (Low-energy beam PREparation, MAnipulation & Spectroscopy) JRA04 INDESYS (INnovative solutions for nuclear physics DEtector SYStems: from basic R&D to applications for the society) JRA05 SiNuRSE (Simulations for Nuclear Reactions and Structure in Europe) JRA06 EWIRA (East West Integrated Research Activities) create a niche for the small(er) laboratories from Central and South-Eastern Europe and bring them to a level comparable to that of the existing Western European laboratories JRA07 THEXO (THeoretical tools in support of infrastructures)

IUPAP, Vancouver (Canada), July ENSAR scored 14/15 in the evaluation (March10). The report was very positive, but with one remark: The larger partners in the consortium requesting the largest budget should cover a higher percentage of the costs through their own resources. Furthermore, the EC cut the total budget to 8 M, and added the following two conditions: The allocation of available funds within the project should take into account in particular the interest of the user community and The project should aim at a higher visibility of the opportunities and services offered by the TA facilities also to scientists from outside of the traditional user communities. 8

IUPAP, Vancouver (Canada), July Taking these recommendations into account and after consultation with the user community, the ENSAR Scientific Advisory Committee decided on 23 April 2010 to enforce the following cuts: TNAs: a 12% cut should be realised totally at the cost of, i.e. reduction of, unit cost leaving the minimum number of hours of beam time and the travel and subsistence for users the same. The total budget for AGATA within the three concerned TNAs should be cut by 20% ( EC request 3.97 M) JRAs: were proportionally cut by 27%. It was left to the JRA work-package leaders to realise this cut in the way they find best for their participants. However, it was strongly advised to cut tasks completely, if feasible ( EC request 2.93 M) The NAs were cut by 30% (except FISCO which has to stay at 7% of the total budget thus applying a 20% cut). Here also, it was strongly advised to cut tasks completely, if feasible ( EC request 1.10 M) Total ENSAR budget >>11 M (total EC request 8 M; enforced upper limit by EC) 9

IUPAP, Vancouver (Canada), July ENSAR Organisation Coordinator: Muhsin Harakeh (KVI/GSI/GANIL) Deputy Coordinator: M. Lewitowicz (GANIL) Project Manager: K. Turzo (GANIL) … Managing institution: GANIL 10 NA01 FISCO

IUPAP, Vancouver (Canada), July ENSAR Timeline Negotiation with EC opened on March 26, 2010 First negotiation meeting with EC on May 18, 2010 End of negotiations June 11, 2010 (fine tuning may still occur) We aim at an ENSAR starting date of Sept. 1, 2010 EC funds are expected by the end of 2010 End of the ENSAR project August 31,

IUPAP, Vancouver (Canada), July Thank you for your attention