Control System and Electrical Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team 1750 2011.

Slides:



Advertisements
Similar presentations
CRIMPING Introduction
Advertisements

Build Your Own Future RC2 Serviceability. Build Your Own Future Safety and Ground Rules Before servicing, always remove A/C power from the unit and disconnect.
US First Robotics Lab View Tutorials Jim Thomas Lawrence Berkeley National Laboratory Team 496 Port Jeff Powerhouse.
BumperBot uses two contact switches to go through a labyrinth. Bumper.
Activity 1.3.1a Solar Hydrogen Automobile Assembly Guide
Robot Quick Build Session Transmission Assembly Instructions Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team 1750 Special Thanks to.
Frame Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
A-dec 300 Dual Mount on 500 Installation. Agenda ► General Information ► Recommended tools ► Installation ► Follow through install guide ► Hands-on install.
Presented by Team 3350 (T-BOTS).  Students should lead their teams in the building, design, and all other aspects of the robot.  Knowledge of the Kit.
Introduction To Frc electronics
C-Base Transmission Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
1 STEPMILL 7000 PT ASSEMBLY INSTRUCTIONS PART NUMBER
Robot Quick Build Session Frame Assembly Instructions Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team 1750 Special Thanks to Oklahoma.
Electrical Wiring Circuit Board Project. STEP 1 - Identify all Parts of the Project Saw Drill Driver w/ bits Drill w/bits (not pictured) #2 Phillips Screwdriver.
SGI Confidential Copan 400 Installation. SGI Confidential Installation Overview The approximate minimum time to complete this procedure is.
Programming and Electronics Training
Wiring the new control system MVRT 2010 – 2011 Season.
Applied Control Systems
FIRST Robotics Kit of Parts - KOP
How to Construct a Robot Part 7: Wiring and Controller Installation Copyright © Texas Education Agency, All rights reserved. 1.
Making A Motor Exploring the Magic of Electricity.
Overview of New System Beta Team from Wilsonville 1425 Wilsonville Robotics – Code Xero 2550 Oregon City Robotics.
Colorado Space Grant Consortium Timing Circuit HW #4 Class #07 Timing Circuit HW #4 Class #07.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
Technical Topics for Teams August BEST GAME RULES.
Electrical Workshop Session One 9/22/2014. FIRST Power Distribution Diagram.
2009 Control System Workshop January 10, 2009 Farmingdale State College SPBLI - FIRST Mark McLeod Advisor Hauppauge Team 358 Northrop Grumman Corp.
Embedded Programming and Robotics Lesson 6 Mechanical Assembly 1.
Wiring the Desklamp Basics of Wiring. Types of Wire For this project we will be using two types of wire: 3 wire and standard lamp wire. – 3 wire The wire.
1. A guide to wiring your robot. Jerry Skene Past mentor – Chantilly Robotics
Electrical Components.  This supplies all the power to the robot. It is a single 12 V battery. They are sealed to prevent battery acid from leaking.
Robot Quick Build Session RQBS Intro - Instructions Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team 1750 Special Thanks to Oklahoma.
A Team 378 Tutorial Basic Wiring. Wire Wire Gauge should be determined by the item being powered. The fuse size for that circuit should correlate to the.
Robot Quick Build Session Pre-Kickoff Preparations Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team 1750 Special Thanks to Oklahoma.
1 FREE CLIMBER 4400 ASSEMBLY INSTRUCTIONS PART NUMBER
SRA Lab Safety & Proposal PowerPoint Project This is a Partnered/Group Assignment Tech Ed - 9 Lab Safety & SRA Proposal Report Mr. Saunders Remember: This.
STELR Solar Car construction notes Based on slides provided by Helen Marussinszky, Mitcham Girls HS, South Australia.
Electronics and Robotics Merit Badges
CANBus Hardware Setup. CANBus CANBus is a control system method that can be used instead of the conventional PWM system. It uses RJ12 cable, which is.
Install Instructions August 1, 2008 Standard Knock-out plates need to be removed from the machine.
Introduction Produced by Ron Markum, Team 1750 Ed Latimer, Team 476 Ken York, Team
P:\ISO \Work Instructions\Assembly\Options\ARMADILLO SWEEPER OPTIONS\10X ARMADILLO SWEEPER OPTIONS MODEL: KIT-MFG-ENG SHDN DSL M&FS SWA.
Build a Simple Electric Motor Uses a stator made of windings, an armature with two coils, and a commutator.
Connecting the cRIO to the 12 V power source and your computer
Easy Reach 7.0 Honda Element Packing List QtyDescriptionPacked 115ft 10ga Red Wire 16ft 10ga Black Wire 140amp Breaker 23/8 Yellow Ring Terminals 25/16.
Robot Quick Build Session Programming Session Produced by Ken York, Team 476 Ed Latimer, Team 476 Ron Markum, Team 1750 Special Thanks to Oklahoma State.
Mechanical Components and Programming Ken Youssefi Introduction to Engineering – E10 1.
MIND CONTROLLED ROBOT BY ADITHYA KUMAR EIGHTH GRADE.
Introduction Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Project Overview  Introduction  Clawbot Build  Design Modification  Design Development  Programming  Sensors  Advanced Sensors  Open design challenges.
1 Equilibrium The Balancing Robot By: Kerry Scharfglass Whiz Kid.
 cRIO with all modules & connectors and cables for each module.  Digital sidecar with all connectors and cables.  Panel signal light indicator & connector.
RockOn! RockOn! Structure Build RockOn! 2009.
FRC Team #1714. Team #1714 Introductions Project Leader:Michael Wittman - FRC Team #1714 Project Members: From Team #1714: Sarah Wittman, AJ Rehfeldt,
GENERAL CAUTION TOOLS REQUIRED ASSEMBLY AND INSTALLATION
Activity 1.3.1a Solar Hydrogen Automobile Assembly Guide
ASSEMBLY/INSTALLATION INSTRUCTIONS ASSEMBLY AND INSTALLATION
CAUTION GENERAL TOOLS REQUIRED ASSEMBLY AND INSTALLATION
Electrical Wiring Circuit Board Project
Bilge Pump Service Project Model Service Kit
Easy Reach 7.0 Honda Element 2003
Easy Reach 7.0 Honda Element 2003
CAUTION GENERAL TOOLS REQUIRED ASSEMBLY AND INSTALLATION
Activity 1.3.1a Solar Hydrogen Automobile Assembly Guide
Exploring the Magic of Electricity
Wiring the Light and Relay
VEXnet User's Guide.
Activity 1.3.1a Solar Hydrogen Automobile Assembly Guide
BUILDING AN AUTONOMOUS QUADCOPTER.
Presentation transcript:

Control System and Electrical Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team

Overview During the next two hours students will assemble and test the control system. You should have the required components of the KOP and RQBS parts. After completion, the electrical assembly will be taken to the frame area and mounted onto the robot chassis.

The Goal

Gather the Parts Identify and inventory the Control System Box. Report any missing components. Locate the following: 120 amp circuit breaker. * QD battery connectors.* wiring terminals.* RQBS base plate and bag. *Located in one of the tote boxes. Refer to KOP inventory sheets.

Required Tools Wire strippers Wire cutters Wire crimpers Phillips screwdriver - #2 Flat Screwdriver Supplied Wago flat screwdriver 7/16”,3/8” and 10mm combination wrenches Tape measure

Required Control System Items (robot) Place the following items on a clear workspace: cRIO and modules, power distribution board, Jaguar controllers, digital sidecars, 120 amp breaker, 2 PWM cables, 2 CIM motors, Ethernet cable, connector bag, 2 DB37 cables, and extra 10 and14 gauge wire.

Read Instructions! Peruse sections 1-5 of the 2009 Control System Manual. Read section 2 carefully. Do not connect battery until instructed! Make all electrical connections and ensure CIM motors are secured and safe to operate before powering any part of the control system.

Layout Use the provided drilling templates, drill ¼” and 3/8” holes as indicated. Accurately place templates on the base plate and tape in place. Verify the 32” spacing dimension between the two template holes. Refer to the pictures in the next two slides.

Front Drill Template Rear Drill Template

Drill Holes in the Base Plate Base Plate Rear Drill Template Tape Several Places to hold Template in Place Make Sure Holes on Both Edges are Spaced 32” Apart Before Taping

Layout These Holes will be Matched Drilled After Installing on the Frame Lay out the items similar to the picture. Leave 1-1/4” margin around all edges as this is the frame mounting area. Velcro

Wiring Wire the large battery wires. The black wire is connected directly from the half connector to the PD (Power Distribution) board. The red wire from the half connector is attached to the 120 amp circuit breaker and then on to the PD board. Note: the 120 amp breaker uses SAE threads while the PD board uses Metric threads. Do not swap the nuts!

Make the connections as shown below. Use the large terminals. Make good crimps. Use ¼-20 screws and nuts to mount

Locate and install the DB37 cables. Install Analog Bumper

Assemble the power cable for the cRIO. (#16 AWG)

Install cRIO power cable. Assemble DSC (Digital SideCar) power cables. (#14 AWG)

Attach DSC cables to PD board.

Make power wires for Jaguar, 2 sets. (#10 AWG) Crimp supplied connectors to one end. Connect Terminals Here Connect Ends Here

Prepare 2 PWM Wires. The protective casing must be removed from one end. Refer to official PWM cable modification document.

Install PWM cables as indicated. Connect Here, 1 & 2, White Wire to Inside Connect Here, White to Outside

The wiring of the control system bench test is complete. The final step is connecting 2 CIM motors to the Jaguars. Connect CIMs Here

Wiring: Drivers Station (DS) Connect the DS as shown below. Joysticks plug into USB 1 & 2. Dongle

Wiring: Tethered Connect the blue Ethernet cable from the DS to the cRIO port. Connect DS Ethernet Here Put 120 amp breaker in the off position. Connect the battery. (Leave main breaker off.) Plug into wall outlet for DS power.

Bench Test You are now ready to proceed with section of the 2009 FRC control system manual. Put 120 amp breaker in the off position. Test the DS as per section Test tethered operation as per section 2.3 C Make sure CIMs are secured. After successful tethered test, set up system for wireless operation.

Wireless Setup Follow section of the FRC Control System Manual. The power wires to the wireless bridge need to be modified. Cut Wire Here and Add Terminal Black w/ white stripe

Mount wireless bridge and install modified power wire. (Frame included for reference.)

At this point you are ready to configure your wireless system. You must follow the instruction carefully. Refer to the FRC Checklist by Benjamin Heaivilin and the FRC 2009 Control System Manual. (This will take about an hour) After completion your system should operate wirelessly.

Install Base Plate onto Kitbot Frame Report back to the frame assembly area to verify everything is ready for the base plate installation.

Install Base Plate onto Kitbot Frame Match drill three ¼” holes and install 1-3/4” long bolts and nuts. Match drill base plate at these locations

Complete Tests Complete any remaining bench test not finished in the previous slides. AT THIS POINT, THINGS CAN MOVE! BLOCK THE WHEEL OFF THE TABLE. MAKE SURE NOTHING IS IN THE CHAIN AREA OR CAN GET CAUGHT IN THE CHAIN. KEEP ALL PERSONNEL CLEAR OF THE CHAIN!

Programming Download the supplied default program to the cRIO. Bench test the program. Go to drive area. CONGRATULATIONS!