Some things can’t wait for traffic Capital Beltway HOT Lanes – Our Challenges & Successes Herb Morgan Vice President Fluor Infrastructure.

Slides:



Advertisements
Similar presentations
Click to edit Master title style »Click to edit Master text styles –Second level Third level –Fourth level Fifth level Construction Update 11/13/2012 Larry.
Advertisements

Some things cant wait for traffic Capital Beltway HOT Lanes Project Update – January 2011 New Travel Choices Ahead.
I-95 HOT/HOV Lanes Project Fairfax County TAC August 16, 2011.
Some things cant wait for traffic Capital Beltway HOT Lanes Project Fairfax County TAC Update – August 16, 2011 New Travel Choices Ahead.
Capital Beltway HOT Lanes Project Project Update March 2009.
Capital Beltway HOT Lanes Project Project Update April 2009.
Some things cant wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
New York State Department of Transportation Region 11 Reconstruction of Jamaica Avenue Bridge over I-678 Van Wyck Expressway The Roll-in/Roll Out Method.
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
CPM Scheduling Techniques & Technologies Cayuga I-35E, St. Paul
A framework for organising and financing infrastructure provision Jan-Eric Nilsson, VTI.
Innovative Contracting Techniques that Consider Driver Impacts Use of A+B Bidding Presented by: David L. Kent P.E. New York State Department of Transportation.
Interstate Tolling: Financing Reconstruction and Shifting to Mileage-Based User Fees by Robert W. Poole, Jr. Director of Transportation Policy Reason Foundation.
Route 50 Widening Design/Build Project. 2  Virginia Department of Transportation  Shirley Contracting Company  Dewberry  Fairfax and Loudoun Counties.
Riverside County Transportation Commission 91 Project Update California Transportation Commission December 10, 2014.
1 GOODS MOVEMENT IN CALIFORNIA. 2 California is facing a significant transportation infrastructure shortfall. California is using innovative approaches.
The Alameda Corridor: Lessons Learned Presented to: UCI Conference on the New Generation of Transportation Financing in California Costa Mesa, CA Gill.
Dulles Corridor Metrorail Project 23-mile new Metrorail line branching off the Orange Line after East Falls Church 11 new stations 5 in Phase 1: East Falls.
Corridor #5 Update United States Senate Briefing September 26, 2007.
1 Corey W. Hill Chief of Public Transportation May 20, 2008 May 20, 2008.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
1. Virginia’s Public-Private Transportation Act (PPTA) Northern Border Finance Workshop December 11, 2006 Thomas W. Pelnik III, P.E. Director, Innovative.
Whittier Access Project, Alaska The Anton Anderson Memorial Tunnel Whittier Access Project.
ASSOCIATION OF AMERICAN RAILROADS Chicago Area Rail Infrastructure 16,000 acres, twice the area of O’Hare 78 yards, including 21 intermodal (rail-truck)
The New I-64 Design-Build Project October Three Design-Build Contracts Legislative authorization in 2004 I-64, St. Louis –Awarded November 2006.
Determining Innovative Contracting Methods to Reduce User Costs Stuart Thompson Utah Technology Transfer Center.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
1 CMAA – OWNERS FORUM THE TRANSURBAN PERSPECTIVE Tony Adams May 3, 2010.
Brigham City UTOPIA Community Outreach May 14, 2014.
County of Fairfax, Virginia Department of Transportation Richmond Highway Transit Center Feasibility Study Briefing with the Fairfax County Transportation.
Performance Analysis Presentation to the National Capital Region Transportation Planning Board (NCR-TPB) November 28, 2012 Adopted: July 18, 2012 Item.
Transportation Funding 2006 Now or Never? Committee For Dulles January 19, 2006 Robert O. Chase, President Northern Virginia Transportation Alliance NVTA.
UN Training Program Keys to Successful PPP’s September 25, 2006.
A New Paradigm for Utility Coordination Kenny Franklin INDOT Director of Utilities and Railroads.
Pat Bursaw, Minnesota DOT International Partnership Meeting Washington D.C. January 26, 2012.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
WVDOH Experience... thus far.  Public-Private Partnerships = PPP=3P = P3 ... Most folks in industry refer to them as P3, so that’s what I go with.
Some things can’t wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
Convergence of Transportation Policy and RFID Enabler of Future Transportation Policy Chris Body Mark IV Vice President, Business Development.
Office of Traffic, Safety and Technology Module 4 Work Zone Applications Traffic Control Plan Development Course.
Interstate 95 Corridor Improvement Program June 20, 2012.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Freeway Congestion In The Washington Region Presentation to National Capital Region Transportation Planning Board February 15, 2006 Item # 9.
ITS Georgia | June What is the role of ITS in the emerging public/private partnership transportation market in Georgia? ITS Georgia Monso_Julia.
Tom Norton, Executive Director Colorado Department of Transportation American Association of State Highway and Transportation Officials September 9, 2003.
Solving Challenges Others Cannot Statutory Frameworks for Public Private Partnerships NCPPP/AGC Conference Phoenix, AZ Christopher D. Lloyd January 27,
Interstate Tolling: Why and How by Robert W. Poole, Jr. Director of Transportation Policy Reason Foundation
CONFIDENTIAL Virginia’s PPEA, NC SB 822, and Lessons Learned Institute for Emerging Issues North Carolina State University.
C OMMITTEE FOR A DELAIDE R OADS Adelaide’s Missing North-South Link.
1 Destination 2030 Kern Regional Transportation Needs * Information provided by Kern Council of Governments.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
US 36 Commuting Solutions Northwest Rail Westminster Segment/Eagle P3 Oct. 14, 2014.
PROJECT OVERVIEW. 2 Green Line Extension Project 3 College Ave Ball Sq Lowell St Gilman Sq Lechmere Union Sq Washington St.
Construction zones and traffic control Objective Review extent of problem Identify contractor responsibilites Identify control plan components.
June 25, 2013 Wendell Point, Ph.D. Civil Rights Program Consultant 1.
Biomass Cogeneration Facility Savannah River Site Aiken, SC
ITS VIRGINIA MEETING APRIL 19, EXPRESS LANES ITS APPLICATIONS OVERVIEW.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
Regina Bypass Project Information Session. Saskatchewan.ca Outline Background –The need for a bypass –Selecting the route –P3 delivery and procurement.
Engineering College, Tuwa. Design Engineering 1 - B  Guided by, SUBMITTED BY, PRAGNESH PATEL SHAH HETAXI ( ) RAJPUT VIVEK ( ) SOLANKI.
Using Public-Private Partnerships to Move More People The Story of HOT Lanes in Northern Virginia January 30, 2017 Morteza Farajian, Ph.D.
Public Private Partnership (P3)
Integrating Transit and Highway Solutions In High Volume Corridors
Sully District Council of Citizens Associations January 25, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation.
Highway 14 – Owatonna to Dodge Center District 6 Update
General Tab Project, Cost Schedule, and Work Limits Roadway Character
ASSOCIATION OF AMERICAN RAILROADS. ASSOCIATION OF AMERICAN RAILROADS.
SR 400 Express Lanes: Market Sounding
by Robert W. Poole, Jr. Director of Transportation Policy
Presentation transcript:

Some things can’t wait for traffic Capital Beltway HOT Lanes – Our Challenges & Successes Herb Morgan Vice President Fluor Infrastructure

Some things can’t wait for traffic 2 nd most congested region in US Population growing at twice national rate Polls show transportation #1 issue Beltway congested 6-8 hours per day Costs local economy $5.5 billion a year Welcome to Northern Virginia

Some things can’t wait for traffic Public-Private Partnership Nearly $2 billion transportation improvement project 80-year partnership agreement Approximately $1.5 billion in private equity and debt Key risks transferred to private sector, away from taxpayers –Schedule (fixed date with LD’s of $250K per day) –Cost (Lump Sum) State grant and use of innovative federal loan programs Partnership agreement includes key provisions to protect public interest –Revenue sharing –No non-compete

Some things can’t wait for traffic Construction of $2 Billion Capital Beltway HOT Lanes is expected to: Support 11,200 jobs Generate $2.7 billion in economic benefit for region Contribute 10% of job growth and 20% of total economic growth in Fairfax County Commitments with 103 Disadvantage Business Enterprise (DBE) firms and 118 Small Woman and Minority (SWaM) firms; totaling $368M Stimulating the Local Economy* *George Mason University, 2009 Tysons Corner – Rt. 123

Significant Project Challenges and Successes Unique Contractual Relationship Capital Beltway Express LLC Design-Build Contractor Operations & Maintenance Subcontractor Subcontractors ETC Maintenance Roadway Maintenance ARCA Design-Build Contract O&SS Contract 5

Some things can’t wait for traffic Overview of Improvements Two new lanes (High Occupancy Toll) in each direction from Springfield Interchange to north of Dulles Toll Road (14 miles) Upgrades to 11 key interchanges Improved connections for all new interchanges, particularly at I-66 Building 58 new bridges and overpasses New HOT Lanes dynamic tolling system More than 80,000 linear feet of new sound walls, protecting neighboring communities New bike paths and sidewalks on every Beltway crossing

Some things can’t wait for traffic 5 years Dec – Dec % design to final detailed design ROW acquisition (144 parcels) Utility relocations (12 owners – 102,000 feet of utilities) Construction Start up / check out tolling system Toll Revenue - December 20, 2012 Schedule I-66 at I-495 To D.C.

Some things can’t wait for traffic One of largest highway improvement projects in U.S ($1.4B Design Build Contract). Over 900 employees and subcontractors on the job Current $35 - $40 million per month burn rate 73,513 cubic yards of concrete 1.3 million tons of asphalt 21.4 thousand tons of steel 224+ pieces of heavy equipment 890,000 sq. ft. of retaining walls 80,000 linear ft. of sound walls Key Construction Metrics

Some things can’t wait for traffic Safety – keeping workers and drivers safe The Challenges 200,000+ vehicles a day Tight construction footprint, multiple lane shifts, narrow lanes Frustrated and distracted drivers/cell phones Large amount of night work Aggressive schedule – entire 14 miles under construction Significant Project Challenges and Successes

Some things can’t wait for traffic Safety – keeping workers and drivers safe Action Steps Emphasize total team commitment to Safety Set and track safety expectations Utilize engineered safety controls whenever possible Aggressive VDOT media outreach – Orange Cones No Phones – Construction activities Significant Project Challenges and Successes I-495 over Rt. 50

Some things can’t wait for traffic Safety – keeping workers and drivers safe Results: Fewer serious work zone accidents 2.8 million safe hours on job with only one lost time.84 OSHA Rate Increased program ownership at all levels Still a work in progress Significant Project Challenges and Successes

Some things can’t wait for traffic Construction Construction Approach – Design/Build Design packaging feeds into construction planning Just in time design Construction involvement in design – Unique Contractual Relationship – Project divided into 4 construction area – Construction Area Manager and independent construction team – VDOT/GEC leads paired with area managers – Key decision making level – Most interchanges 3 stage construction approach 12–18 month schedule savings realized at 2 interchanges by switching to a 2 stage approach Significant Project Challenges and Successes

Some things can’t wait for traffic Construction Work Phasing –Build outer 2 lanes: 2008 – 2011 –Rebuild/lengthen all bridges & overpasses along alignment: 2008 – 2011 –Shift traffic into two new outer lanes: –Build inner two (HOT) lanes: 2011 – 2012 Significant Project Challenges and Successes Braddock Rd.

Some things can’t wait for traffic Construction Demolition Approach – Bridge demo at night to allow needed lane closures – Noise an issue to nearby residents and hotels. Utilized techniques to speed work while decreasing noise Media & public outreach – Maximize lane closures and duration of closures to increase hours available for demolition (in some cases coordinate with the state to provide full road closures, with detours in place, to accelerate demolition Significant Project Challenges and Successes SB I-495 at Rt. 123 Little River Turnpike

Some things can’t wait for traffic Construction Demolition Approach – Utilize specialist demo subcontractor with specialized demolition equipment (Hydraulic shear, large hydraulic claw) – Careful planning of the work to make most efficient use of the lane closure window and maximize productivity Significant Project Challenges and Successes Rt. 123

Some things can’t wait for traffic Construction Field Construction – Switch from drilled shafts to driven piles – Utility relocation & work sequencing – Integrated Right of Way acquisition process – Multiple work fronts within each interchange – Double shift and weekend work of critical activities Significant Project Challenges and Successes I-495 at Dulles Toll Road

Some things can’t wait for traffic Construction Field Construction –Detailed planning and coordination, particularly when in close proximity to third party construction (Dulles Metro) –Balance of self perform and subcontract resources to maximize work fronts –Close internal coordination between functions (roadway, structures, MOT, utilities) to maximize efficiency of the work and interface between groups – Significant Project Challenges and Successes Tysons Corner

Some things can’t wait for traffic Conclusion Moving from 30% design review to ROW acquisition, utility relocation, construction & toll service within 5 years - remarkable accomplishment VDOT/GEC/Transurban/Fluor-Lane have worked hard to succeed in this PPP Truly unique project Project Successes

Some things can’t wait for traffic Project Successes