0 MTA Track Program Review Presentation to CPOC February 17, 2011 STRATEGIC INITIATIVES GROUP CAPITAL PROGRAM MANAGEMENT OFFICE OF CONSTRUCTION OVERSIGHT.

Slides:



Advertisements
Similar presentations
Piedmont Improvement Program NC Society of Engineers
Advertisements

Symantec 2010 Windows 7 Migration EMEA Results. Methodology Applied Research performed survey 1,360 enterprises worldwide SMBs and enterprises Cross-industry.
Symantec 2010 Windows 7 Migration Global Results.
Michigan Department of Transportation Michigans Infrastructure Needs and Funding 2013.
4x10 Surveys & Measurements November Employee Survey To measure personal impact of those who changed from 5x8 to 4x10 during the 4forMesa pilot.
TACTICAL/OPERATIONAL PLANNING
1
Operations Management Maintenance and Reliability Chapter 17
Copyright © 2002 Pearson Education, Inc. Slide 1.
PowerPoint Presentation
Cognitive Radio Communications and Networks: Principles and Practice By A. M. Wyglinski, M. Nekovee, Y. T. Hou (Elsevier, December 2009) 1 Chapter 12 Cross-Layer.
Author: Julia Richards and R. Scott Hawley
ALGEBRA Number Walls
David Burdett May 11, 2004 Package Binding for WS CDL.
Metropolitan Transportation Authority November 2008 Financial Plan /15/ :22 AM 1 Metropolitan Transportation Authority November 20,
MTA Business Service Center Operations Update MTA Finance Committee Report February 17, 2011.
00 Project Gates Briefing to the Capital Program Oversight Committee February 2011 Capital Program Management.
2008 MTA NYC Travel Survey Summary of Selected Results June 22, 2009.
Smarter Travel Programmes– Financial impacts for Transport for London COLIN BUCHANAN
CALENDAR.
1 Career Pathways for All Students PreK-14 2 Compiled by Sue Updegraff Keystone AEA Information from –Iowa Career Pathways –Iowa School-to-Work –Iowa.
0 - 0.
1 MAXIMIZING PUBLIC INVESTMENT Ohio Department of Transportation Highway Funding Overview Julie Ray, Deputy Director Division of Finance & Forecasting.
1 Credit Cards Avoid the Minimum Payments Trap! 3% examples Revised November 2012.
Inspections on an iPad, iPhone, iPod Touch, Android Tablet or Android Phone.
How Reliability Impacts Shareholder Value Bruce Hawkins, CMRP Management Resources Group, Inc.
1 Commonwealth of Virginia Executive Branch Strategic Planning, Service Area Planning, and Performance-Based Budgeting Productivity Measurement: Cabinet.
MA Metal Finishing Forum Tools and Techniques for Optimizing Metal Finishing Process/Environmental MA Metal Finishing Forum Kevin L. Klink, P.E.
Break Time Remaining 10:00.
ASSESSING THE VALUE OF BUS SERVICES FOR LEISURE Dr Jo Guiver Nick Davies Institute of Transport and Tourism.
Andrew McNaughton 1 Radical Change is Entirely Possible! 2 nd November 2011.
Chapter 5 – Enterprise Analysis
Effective Test Planning: Scope, Estimates, and Schedule Presented By: Shaun Bradshaw
Property Management Contract Oversight VDOTs Outsourced Safety Rest Area Program November 15, 2013 Maintenance Division.
Cost Control and the Menu—Determining Selling Prices and Product Mix
What Is Cost Control? 1 Controlling Foodservice Costs OH 1-1.
PP Test Review Sections 6-1 to 6-6
Developing a Project Plan CHAPTER SIX Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Developing the Project Plan
Where We Are Now Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
SLP – Endless Possibilities What can SLP do for your school? Everything you need to know about SLP – past, present and future.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
1 The new government has to develop a systematic campaign to contact: 1) Regional and communal associations abroad and in Haiti. Communities can participate.
Employment Ontario Program Updates EO Leadership Summit – May 13, 2013 Barb Simmons, MTCU.
1 Eligibility Business Process Re-engineering & Conversion to a Task-Based Model (Lessons Learned - Successes Achieved) Presented by: Kim Forrester Health.
Before Between After.
1 Tracking Innovation in NC Patterns and Implications for NC's Eastern Region John Hardin, Executive Director NC Board of Science & Technology
Positive Train Control Benefits
Benefits of an As-Needed Construction Management Services Contract CMAA NATIONAL CONFERENCE October 2009 Copyright © 2009 by R. W. Beck, Inc. All Rights.
Copyright © 2008 Pearson Addison-Wesley. All rights reserved. Chapter 10 A Monetary Intertemporal Model: Money, Prices, and Monetary Policy.
1 Titre de la diapositive SDMO Industries – Training Département MICS KERYS 09- MICS KERYS – WEBSITE.
Clock will move after 1 minute
famous photographer Ara Guler famous photographer ARA GULER.
Chapter 11 Flexible Budgeting and the Management of Overhead and Support Activity Costs.
A Real Intertemporal Model with Investment
Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved Chapter The Future of Training and Development.
Chapter 14: Network Design and Facility Location.
Introduction to Management Science
Two Special Right Triangles
Select a time to count down from the clock above
Educator Evaluation: A Protocol for Developing S.M.A.R.T. Goal Statements.
Aviation Management System 1 2  Silver Wings Aircraft Aviation Management System represents a functional “high – end” suite of integrated applications.
Chapter 5 The Mathematics of Diversification
INFORMS 2012 Shared Corridor Railway Maintenance Scheduling Brennan M. Caughron Graduate Research Assistant Rail Transportation and Engineering Center.
WORKING IN THE DARK: Citizens Budget Commission October 20, 2009 IMPLEMENTATION OF THE METROPOLITAN TRANSPORTATION AUTHORITY’S CAPITAL PLAN.
Metropolitan Transportation Authority July Financial Plan 2016 – 2019 Presentation to the Board July 22, 2015.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Presentation transcript:

0 MTA Track Program Review Presentation to CPOC February 17, 2011 STRATEGIC INITIATIVES GROUP CAPITAL PROGRAM MANAGEMENT OFFICE OF CONSTRUCTION OVERSIGHT / IEC AGENCY TRACK PROGRAMS

1 The MTA agency track programs deliver safe and reliable track Agency track program spending varies widely due to significant differences in methods, constraints and asset needs Key areas of opportunity suggest $50 million in annual MTA-wide track efficiency improvement potential: Labor efficiency Overtime Substitute service The MTA agencies are presently pursuing initiatives directed towards realizing the identified efficiency potential Summary

2 Track statistics defy typical MTA rankings, with each agency leading in a different asset area Mainline track miles* MNR NYCT LIRR Mainline track switches* NYCT LIRR MNR ,754 LIRR348 NYCT MNR113 Mainline track grade (road) crossings* * The scope of this study is restricted to mainline track and does not examine yard track Rail Tie Ballast

3 During , the agencies invested an average of $520 million per year through programs tailored to deliver safe and reliable track MNR*2% LIRR4% NYCT5% % train delays due to track, * MNR figures based upon East of Hudson network (92% of track-miles) Average annual track investment, $ million NYCT MNR7634 LIRR Operating Capital $ thousand / mainline track mile MNR103 LIRR205 55% 45% 39%61% NYCT50836%64% Minimal delays due to track

4 Variations in agency track spending are attributable to differing methods, constraints and asset needs Track renewal method Track access: hours of operation, OTP, location, special events, other projects Work rules: scheduling flexibility, overtime, job title restrictions Asset life: track geometry, utilization, environment, etc. Constraints NYCT: full track renewal LIRR/ MNR: compon- ent track renewal Rail, thousand feet MNR575 LIRR121 NYCT849 Ties, thousands Switches, each Grade xings, each 150 Assets renewed by capital program, Trackbed Rail fasteners Rail joints Track surfacing Other renewals

5 Regardless of differences, labor expense is the largest opportunity for reducing track program cost Construction / maintenance labor as % of track program expense, MNR LIRR NYCT Operating Capital Improve labor efficiency and reduce overtime

6 Numerous indicators highlight opportunities for improving track program labor efficiency Typical NYCT nighttime track access, hours -38% Shift length Work window * Amtraks Infrastructure Maintenance Program Evaluation Report, Amtrak Office of Inspector General, Sep 2009 Track workers per track mile LIRR -26% MNR NYCT example LIRR example Average switch renewal interval, years International peers* -22% MNR MNR example Expand track access Evaluate staffing level Optimize asset renewals Opportunities

7 Reducing overtime will also help to minimize track program labor expense, particularly in the capital program Overtime as % of track program labor expense, Extensive track program overtime Schedule more work on weekdays (facilitated by expanded track access) Reallocate staff to shorten shifts (16 hour weekend shifts are typical) Avoid early start times in instances that will trigger full-day overtime pay Reassess work rules that provide overtime for routinely scheduled weekend workdays (only NYCT has first 8 hours of Saturday and Sunday on straight time) MNR 15% 43% LIRR 18% 33% NYCT 6% 24% Operating Capital Opportunities

8 Substitute service represents a further significant opportunity for reducing track capital program cost at NYCT Substitute service as % of typical NYCT renewal project expense Minimize duration of substitute service (use efficiency gains to speed project completion) Eliminate replacement bus service in areas with numerous alternatives (e.g., Manhattan CBD, Downtown Brooklyn, Long Island City) Minimize overtime incurred by staff supporting diversions 16% 11% +51% Switch +91% Track 27% 14% NYCT21% MNR1% LIRR3% Substitute service as % of capital track program expense, Opportunities

9 A 10% improvement in each of the identified areas of opportunity suggests $50 million in annual efficiency potential Annual MTA-wide efficiency potential, $ million Total Operating Capital Agencies are presently working to pursue this efficiency potential

10 Current: full renewal Less cost and disruption NYCT analysis of nighttime track work, hours Productive time Work window Shift length Increased labor efficiency Track access Track renewal method Pilot: component renewal Examples of opportunities being pursued at NYCT Other Review substitute service Pilot video-based track inspection

11 Increased labor efficiency Less cost and disruption Insulated joint failures Track access Examples of opportunities being pursued at LIRR and MNR Other Review asset renewal rates Identify good practices through ISRBG benchmarking group Analyze cost/benefit of increasing work window Apply industrial engineering techniques to maximize productive work time Use multi-department approach of NYCT study (involving track, operations, budget, etc.) Failures cause delaysRepairs are laborious A joint LIRR / MNR study is investigating ways to prevent insulated joint failures:

12 Benchmarking has provided insight into track program spending, agency-specific approaches and opportunities for improvement Identified areas of opportunity suggest $50 million in annual track program efficiency improvement potential The agencies will evaluate identified opportunities and develop agency-specific action plans to maximize efficiency in 2011 and out years The agencies will provide periodic progress updates to CPOC on their action plans Conclusions