Federal Force Account Utilizing Sponsor Resources Georgia Airports Association – Spring Workshop March 13, 2014 Presented By Katie Eleam Aviation Project.

Slides:



Advertisements
Similar presentations
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
Advertisements

Airport Development Process - Airport Capital Improvement Plan (ACIP)
Managing a Successful Mechanical System project Following design – what next?
Oklahoma Department of Transportation Susan McClune Regulatory Services.
Disaster Cost Reimbursement Assistance IDAHO BUREAU OF HOMELAND SECURITY.
Outsourcing Success Story Santa Rosa County School District So what are you going to say when your Superintendent tells you the district is considering.
Guaranteed Energy Savings Contracts Contracting Requirements for Local Governments Norma Houston NCGFOA Annual Conference July 18, 2011.
Marcy Mealy Procurement Specialist CDBG Program
The Bottom Line In Energy Cost Reduction Energy Automation Systems, Inc. EASI.
Single Point of Contact (SPOC) MTC Workshop PRESENTED BY: Sylvia Fung District 4 Local Assistance September 2014.
Circular A-110 Everything You Didn’t Want to Know.
CACFP Financial Management
LPA – Utility Coordination Natalie Parks StructurePoint November 20, 2013.
November 3, 2002CVEN349 - Maxwell1 Procurement and Materials Management Module 6.2 November 3, 2002.
Workforce Connection Subsidized Employment Program A partnership between Department of Public Social Services & Human Resources Department - Temporary.
Discussion Topics Construction Contract Administration Lessons Learned Other Construction Issues Questions? / Comments (Anytime)
Genesis Solar Module Brochure ™
A SOUND INVESTMENT IN SUCCESSFUL VR OUTCOMES FINANCIAL MANAGEMENT FINANCIAL MANAGEMENT.
HOW TO WRITE A BUDGET…. The Importance of Your Budget Preparation of the budget is an important part of the proposal preparation process. Pre-Award and.
KEEPING LABOR AND OVERHEAD COSTS DOWN Controlling Labor and Overhead Costs as a Long Term Strategy.
1 Maintenance Contracts for Rural Roads International Road Federation (IRF) German Agency for Technical Cooperation (GTZ) ) Economic Commission for Latin.
COMPLIANCE WITH GRANT IMPLEMENTATION PROCEDURES TxDot Grant Fund Project.
Procedural Requirements For Force Account Work on Federal and State Projects 2015 ACCA Conference Orange Beach, Alabama.
Completing the State Aid Payment Request (SAPR). Tips Each spring check on the State Aid Finance web page for the current version of the State Aid Pay.
How to Prevent Findings Part 2 Michigan State Police Emergency Management and Homeland Security Division Ms. Jackie Reese, Audit Unit Manager Mr. Richard.
UESC Project Implementation Construction & Installation ä Issue TO for construction ä The pre-construction meeting ä Review/accept final construction package.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Pacific Air Forces 1 Preconstruction Orientation HQ PACAF/LGC.
Presented to: By: Date: Federal Aviation Administration Airports Division Eastern Region Grant Closeout Guidance 33 rd Annual Airports Conference Patricia.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
Presented to: By: Date: Federal Aviation Administration Airport Inspection & Maintenance at General Aviation Airports Airport Compliance Airports Conference.
COMPETITION REQUIREMENTS
Federal Land Acquisition Process Georgia Airports Association March 14, 2014 Presented By Carla Sands Acting Program Manager, Aviation Programs.
Best Practices: Financial Resource Management February 2011.
Developing and Issuing the RFP. Why should qualifications be your procurement focus? n Having the necessary range of capabilities is more important than.
1 Procurement. 2 Overview Every municipality should keep procurement records that allow an auditor or other interested party to track the specific nature.
Adult Education and Literacy Budget Development and Cost Allocation.
MARCH 9, 2006 Boating Safety and Enforcement Grant Program Regulations Stakeholder Workshop Proposed Conceptual Regulations Department of Boating and Waterways.
Construction Materials and Workmanship. All workmanship, materials, equipment, and articles incorporated into the work are to be of the best available.
IAEA International Atomic Energy Agency Sole source bid evaluation John H. Moore Nuclear Power Engineering Section VIE2012/9002/01 Meeting.
1 ID-XX-20XX DR-XXXX FMAG-XXXX Applicant Brief and Kickoff Meeting IDAHO BUREAU OF HOMELAND SECURITY.
September 11, 2013 Association of California Airports C ONTRACTING FOR C ONSTRUCTION M ANAGEMENT S ERVICES.
How an Electric Utility can get ready for FEMA Marci Lopez P.E.
Sole Source Contracting PENNY BURGER, MAY 12, 2014.
1 Common Issues on Site Re-certification Training For Level IA Fundamentals Certified Personnel Issued May 2009.
Uniform Grant Guidance Roundtable Discussion: October 5, 2015 Procurement 1.
Office of Procurement Services.  Vendor Application Website: 
Measurement and Payment
Is this extension or experiment station PI must complete justification form and include as many details as possible about the costs in budget justification.
Stockton University Purchasing and Grants 11/4/15.
The New Super Circular Inaugural Tribal Accounting Conference November 16, 2015 Morgan Aronson National Single Audit Coordinator
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
Introduction to Procurement for Public Housing Authorities Alternatives to Procurement: Force Account Labor Unit 9.
HOW TO DO BUSINESS WITH THE CITY OF ATLANTA Department of Procurement Presented by: Keith O. Brooks, CPPO.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
Introduction to Procurement for Public Housing Authorities Procurement Planning: Choosing a Contracting Method Unit 2.
POST-APPROVAL MANAGEMENT CONFERENCE CHICAGO REGIONAL OFFICE POST-APPROVAL MANAGEMENT CONFERENCE CHICAGO REGIONAL OFFICE.
Introduction to Procurement for Public Housing Authorities Cooperative Purchasing, Intergovernmental Agreements and Joint Ventures Unit 8.
Louisiana State University. IT GOVERNANCE LOUISIANA CONSTITUTION (allows us to purchase with state funds) LA REVISED STATUTES (provides the laws that.
3 CDBG Disaster Recovery Waterway Debris Program Wednesday, January 13, 2010.
US Army Corps of Engineers BUILDING STRONG ® Building and Preserving Alaska’s Future Alaska District Design-Build Contracts Moolin Seminar November.
Operations Update Report
CDBG Procurement Date of Session, 2017 Washington, DC Brian Delvaux
(Additional materials)
WHOI Procurement Uniform Guidance 2018
AX7665D82 Areawide Total Maximum Daily Load (TMDL) Design-Build
Effectively Communicating Your Project in a Funding Request
Procurement.
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Directed Change Constructive Change
Presentation transcript:

Federal Force Account Utilizing Sponsor Resources Georgia Airports Association – Spring Workshop March 13, 2014 Presented By Katie Eleam Aviation Project Manager, Aviation Programs

 Work completed by sponsor’s employees  Planning, engineering, construction  Can also be performed by another public agency with sponsor agreement What is Force Account?

Advantages of Federal Force Account  Lower cost than contract construction  Allows sponsors to utilize in-kind resources

Potential Disadvantages  Depending on sponsor workload, may delay project  Extensive record keeping required of sponsor

Why Federal Force Account?  Weak economy  Need to get creative to fund projects  Sponsors have qualified personnel that can complete projects more efficiently

Case Studies  Fulton County – Signage Installation  Rome – Runway Safety Area Improvements and Obstruction Removal  Ellijay – Runway Safety Area Improvements and Obstruction Removal

What Projects are Eligible?  Eligible Sponsor  AIP Eligible Project  On the Airport Layout Plan  Included in the Capital Improvement Program  Has an application  Routine airport maintenance projects are not eligible (i.e. mowing)

Notes to Keep in Mind  Prior GDOT approval is required  Qualified personnel must be used  Appropriate NEPA document must be completed  No deviation from AIP standards for construction (AC 150/ ) allowed  Must meet federal construction standards -Procurement of materials -Inspection and Testing -Construction reporting -Plans and Specifications

How to Apply - Sponsor’s Proposal  Preferred method under the AIP is through qualification based selection or competitive bidding  Sponsor’s proposal must: -Be submitted before work initiated -Provide sufficient justification -Include detailed cost estimates, resource information, and plans and specs

Sponsor’s Proposal - Justification  Benefits to the sponsor and the Federal Government must clearly be shown  Key Phrases that should be included: -Willing & Able -Cost Savings -Qualified Personnel and Equipment -Acknowledge and Comply with all federal requirements

 Wage Rates  Estimated work hours  Non-Salary Expenses  Indirect Costs  Comparison of costs between sponsor and contract construction -Must show that force account construction is more cost effective Sponsor’s Proposal – Detailed Cost Estimates

Project ListMaterialLaborEquipment Est.ItemMaterialExtended Item NoItem DescriptionQtyUnitUnit PriceItem CostOperRateHoursExtendedEquipRateHoursExtended 1CONSTRUCTION EXIT1.0EACH$2,000 1$182$36Dozer$802$160 1$122$24Tandem$602$120 2TYPE C SILT FENCE LF$40$1,0402$1520$600Trencher$520$100 3CUT44,756.0CU. YD. 1$18470$8,460Dozer$80470$37,600 44,756/12 = 3730 Loads 1$18470$8,460Excavator$115470$54, /80 Loads per day = 47 days 3$12470$16,920Tandem$60470$84,600 4FILL12,963.0CU. YD. 1$18140$2,520Dozer$80140$11,200 12,963/12 = 1080 Loads 1$18140$2,520Excavator$115140$16, /80 Loads per day = 14 days 3$12140$5,040Tandem$60140$25,200 1$15140$2,100Compactor$25140$3,500 5STORM DRAIN PIPE, 18 IN, H LIN. FT.$18$2,3042$18160$5,760Gradall$40160$6,400 FES, 18 IN, STORM DRAIN1.0EACH$600 2$12160$3,8406 Yard$35160$11,200 STORM DRAIN PIPE, 24 IN, H LIN. FT.$20$9,240 FES, 24 IN, STORM DRAIN1.0EACH$700 STORM DRAIN PIPE, 30 IN, H LIN. FT.$24$2,400 FES, 30 IN, STORM DRAIN1.0EACH$800 JUNCTION BOX4.0EACH$2,000$8,000 6STN DUMPED RIP RAP, TP 3, 12 IN120.0CU. YD.$5$5402$1210$2406 Yard$3510$700 7PERMANENT GRASSING13.5ACRE$500$6,7501$1520$300Hyrdoseeder$6020$1,200 8EROSION CONTROL MATS, SLOPES3,333.0SQ. YD.$1$3,3331$1520$300 9TEMPORARY SEDIMENT BASIN GRASSING2ACRE$500$1,0001$1880$1,440Gradall$4080$3,200 18" PIPE60.0LIN. FT.$18$1,0801$1880$1,440Mini Exc$6580$5,200 2$1280$1,9206 yard$3580$5,600 1$1510$150Hydroseeder$6010$600 Subtotals$39,787$61,920$260,530 Project Totals$362,237 Example Detailed Cost Estimate – Rome RSA Project

Sponsor’s Proposal – Resources  Labor – qualified for the work specified and capable  Material – proper procurement  Equipment -Compare rates to United States Army Corps of Engineers “Construction Equipment Ownership and Operating Expense Schedule”  Financing  Workload  Schedule

Procurement Methods - Materials  Competitive Sealed Bids  Competitive Proposal  Small Purchase -Under $100,000 -Price quotes obtained from adequate number of qualified sources  Noncompetitive Proposals -Single Source -Emergency -Competition inadequate

 Shows the nature and extent of the work  Makes sense for the project  Does not have to be a full, complete set -Erosion Control -Construction Safety and Phasing Plan (7460 submittal) Sponsor’s Proposal – Plans and Specifications

Proposal Acceptance  Requirements met  Proposal submitted to GDOT  Reviewed by Project Manager  Proposal and project accepted

What’s Next  Important to maintain detailed records -Timesheets signed off by supervisor -Direct Costs  Construction Administration -Pre-Construction Meeting -Monthly pay requests -Final Inspection  AIP Required Deliverables (if design) -Engineer’s Report -Construction Safety and Phasing Plan

What to Remember  Prior GDOT approval is required  Qualified personnel must be used  Cost Savings  Appropriate NEPA document must be completed  No deviation from AIP standards for construction (AC 150/ ) allowed  Accurate record keeping  Consultants are a great asset and can assist in all phases of the project

Resources ations/orders/media/aip_5100_38c.pdf ations/orders/media/aip_5100_38c.pdf sor_guide/media/1400.pdf sor_guide/media/1400.pdf /general/ /general/

Questions?