WP5 Pilot implementations targeting clean vehicle usage Martino Soragni – Province of Reggio Emilia.

Slides:



Advertisements
Similar presentations
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
Advertisements

Department of Environmental Quality Environmental Management System Overview.
Project ideas for Mozambique Country Context Project 1. Integrated project of electrification using low cost technologies for rural villages and biomass.
© Tally Solutions Pvt. Ltd. All Rights Reserved 1 Shoper 9 Implementation in Chain Store March 2010.
The sole responsibility for the content of this presentation lies with the Clean Fleets project. It does not necessarily reflect the opinion of the European.
© 2007 COPLAN AND COMPANY. All Rights Reserved. Permission granted for use by HIMSS membership. 1 Procurement Management Scott R. Coplan, PMP Educational.
U.S. General Services Administration General Services Administration Policy, the Procurement Process, the Buy Accessible Wizard, and Purchasing Section.
New Rolling Stock in Tendered Contracts Frank Zerban Barcelona
WP3 - Proceedings Consortium Meeting, Graz (27. – ) Peter Wintersteller Iris Pein.
UGDIE PROJECT MEETING Bled September WP6 – Assessment and Evaluation Evaluation Planning  Draft Evaluation plan.
Public Private Partnership- Identification, Viability and Implementation Prof. Yashvir Tyagi Prof. Yashvir Tyagi Department of Economics Department of.
Module 6/7: DPR (Detailed Project Report) & EPC (Engineering Procurement Construction)
Chapter 17 Acquiring and Implementing Accounting Information Systems
Software Evolution Planning CIS 376 Bruce R. Maxim UM-Dearborn.
IMAGINE 1¢ Per Mile 1¢ Per Mile 250 mpg 250 mpg. Personal Background Steve Osborne Steve Osborne Trained as a geologist Trained as a geologist Worked.
Template For Building Project Schedule Jazz Presentation.
© 2010 Plexent – All rights reserved. 1 Change –The addition, modification or removal of approved, supported or baselined CIs Request for Change –Record.
Institute for Real Estate, Construction and Housing Eichendorffgasse 4/8 A 1190 Vienna/Austria Wolfgang Amann.
WP3 Semivirtual Campus Progress Report Petr Grygarek VSB-CZ.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
EU-funded Project “Implementation of Ukraine’s Commitments under WTO and ENP Frameworks in the Rural Sector (Sector-Wide Approach)” A step by step plan.
Alternative Fuel Readiness Plan for San Mateo County Overview of AFRP Presented to RMCP Meeting January 21, 2015.
Best Fleet Practices Department of General Services Presenters: Sharyl Blackington, Fleet Manager John Manring, Maintenance Fleet Coordinator April Heinze,
Free Powerpoint Templates Page 1 Free Powerpoint Templates How do we do it? Class 7.
Major project development in the Framework of CF and ERDF funds JASPERS - a technical support facility Presented at an InterAct Danube Region Strategy.
Greening Government Operations Green Procurement Implementation Tools & Resources Canadian Public Procurement Forum October 1 st, 2007.
WP3 - Proceedings Consortium Meeting, Reggio Emilia Doris Wiederwald Peter Wintersteller.
Green Emotion WP 4 – Grid Evolution, Task 1 - Functional and Design Requirements of Infrastructure Presented by: Philip LeGoy ESB ecars 3rd Stakeholder.
A ‘Plug’ for Electric Vehicles! Sally Herbert Sustainable Travel Officer Newcastle City Council.
A ‘Plug’ for Electric Vehicles! Sally Herbert Sustainable Travel Officer Newcastle City Council.
Preparation of a Strategic Pilot Program for Climate Resilience (PPCR) Project - Phase I (November January 2013) Climate Investment Funds (CIF) Grant.
HTSC High Tech Shopping Cart Project Vincent Declercq GSBA 573 Fall 2006 USD.
Handbook for Developing a Transportation Management Center Operations Manual Sponsored by the TMC Pooled-Fund Study Single.
SA1/SA2 meeting 28 November The status of EGEE project and next steps Bob Jones EGEE Technical Director EGEE is proposed as.
Strategic Business Planning: Building More Centralized Services Tim Cox June 2014.
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
Overview of the IST Priority Information Package National Contact Points 23rd Oct 2002 Tom McKinlay: IST Operations.
1 Robert Nowak, Transport Division, UNECE 15 March 2011, Tallinn, Estonia Railway Safety Education Conference LET’S SAVE LIVES United Nations Economic.
Final Report on Fast Responding Regulation Service (FRRS) Pilot Project TAC March 27th, 2014.
ISupport The future electronic case management and communication system in support of the 2007 Convention and 2009 Regulation on the recovery of maintenance.
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
8 th Quality Conference Session 7.1 e-Auctions in Public Procurement Sašo Matas Ministry of Public Administration, Republic of Slovenia.
Work Package 6 2nd Consortium meeting, Provincia di Reggio Emilia, 3rd May.2011 Blaz Jemensek, PIL Klemen Gostic, PIL.
Objectives: Define and implement a website layout that enables users to find key information efficiently Develop a process to ensure the sustainability.
MUNICIPALITY OF ATHENS CONTROLLED ON-STREET PARKING Chronis Akritidis Civil & Transportation Engineer Deputy Mayor of Athens John Frantzeskakis Professor.
GINA WP4.2 Business and Exploitation Plan March 10 th 2010 Lisbon GNSS for INnovative Road Applications.
“The World Bank – Italian Trust Fund for Environmental Protection in CHina” Technical Meetings – Beijing – January 23-24, 2006 Climate Changes Related.
NAMA potential of Vietnam Vuong Xuan Hoa Institute of Meteorology, Hydrology and Environment Ministry of Natural Resources and Environment Climate Change.
Multi-Use Application Use Case #3: Optimized Pricing and Resource Allocation (OPRA) Project. May 3, 2016.
CONTACT US : Magnific training INDIA : USA:
Global Clinical Engineering Success Stories Establishment of National Health Technology Management System for Public Hospitals Name: Bilal BECEREN Affiliation:
Principles of Information Systems Eighth Edition
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
Documentation control
Electric Vehicles Safety Global Technical Regulation
Co-Sponsors: China, Japan, EU and US 59th Session GRSP May 9-13, 2016
Module 8 : Implementing Port Reform
Electric Vehicles and the Environment (EVE IWG)
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
P-100 Industry Day 29 November 2007.
White Paper – Least Cost Electricity Procurement
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Transforming Maryland's Electric Distribution Systems
Draft Capacity & Connection Plan
Water & Environmental Affairs
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
ENabling SafE Multi-Brand Platooning for Europe
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Local authorities’ perspective
Presentation transcript:

WP5 Pilot implementations targeting clean vehicle usage Martino Soragni – Province of Reggio Emilia

5.1 - Detailed Specification of the local Pilots Local implementation / operating models (March 2011) –Preparation of a template for distribution to partners that will develop local pilots for the collection of data and information in order to define their operating model (25p each) Contents: Detailed description of the demonstration site (technical specifications) Implementation timeline (status quo and next operative steps) Decisional procedure (legal aspects, security provisions) Encountered obstacles and problems Expected results in terms of environmental, economic and social benefits

5.1 - Detailed Specification of the local Pilots Prepare Procurement / Leasing document (April 2011) –Definition of the EV type (in terms of performance, battery, safety, comfort…) –Definition of the formula for the acquisition of the ZEVs: leasing contract or procurement –Definition of contractual provisions that guarantee the full functionality and usage of the vehicle for the duration of the project: support and maintenance, courtesy vehicle, option to buy the leased vehicle at the end of the contract

5.2 - Preparing the roll out –User/Staff Training Training Materials (June 2011) –Training materials for users: handbook for the correct use of the EV (warnings, how to behave in case of failure, recharging methods, streets and traffic rules) –Training materials for fleet/depot managers: organization of the fleet (active and reserve vehicles), vehicle maintenance and efficiency (periodic testing of electrical and mechanical components)

5.2 - Preparing the roll out – User/Staff Training 5.2.2/.3/.4 Test vehicles (May 2011) Status quo: –Reggio Emilia: leasing of 5 EVs necessary to run the pilots (ecorenting model); public tender to select the service provider that will also be responsible for the local investment implementation (PV charging station) –Klagenfurt –Bolzano 5.2.6/.7 Demonstration (May 2011) Status quo: –Ljubljana –Györ 5.2.5/.8/.9 Solar Rally Upper Austria (November 2010, 2011, 2012) Status quo

5.3 Demonstration phase Demonstration log (March 2013) Producer briefing cars&heavy vehicles (October 2011) Producer briefing ultralight vehicle (December 2011)