Organizing Wiring with Load Groups Load Groups may be needed for safety or functional reasons. The concept applies to both AC and DC systems. Load shedding.

Slides:



Advertisements
Similar presentations
Introducing Electricity and Electrical Safety
Advertisements

The D.C. Scout Battery Distribution System Ground Locator
Safety / Intro The mains supply and batteries are sources of Electrical Energy Electrical Appliances are Energy Changers.
Chapter 13 AC Motors. Chapter 13 AC Motors Objectives Discuss the operation of an induction motor. Identify and explain the operation of various three-phase.
Setup/Installation/Operation of an Environmental Control Unit (ECU)
AC-SSC-1 Installation and operation manual
Lesson 38 Shipboard Power
Air-Conditioning Control Systems
FIRE PUMP ELECTRICAL CONFIGURATIONS UNDER 600 VOLTS.
S Explain parallel circuits, components, and safety of house wiring. S Develop a formula for power consumption and solve related problems.
Electrical Power Systems
© 2011 Ericson Manufacturing, Willoughby, Ohio
Shipboard Electrical Distribution …“Shifting the Electric Plant to a Normal Full Power Lineup.”
NFPA ELECTRIC VEHICLE SAFETY FOR EMERGENCY RESPONDERS Module III : Vehicle Systems and Safety Features Module III : Vehicle Systems and Safety Features.
Chapter 7 SYSTEM PROTECTION
Freedom Combi Inverter
Electrical Fundamentals
Off-Grid Power Using Enphase Micro-Inverters Off-grid inverter systems, using batteries, can be used to provide AC power when the grid is down. It is possible.
Electrical Principles and Wiring Materials
Shipboard Electrical Distribution References Required Introduction to Naval Engineering – Ch 17.
Lesson 9: Electrical Components
Power Grid and Your Home
Chapter 22 Current Electricity.
Generating and Using Electricity
Basic Electricity DC and AC What is Electricity? Electricity is a general term used for the presence and flow of electric charge. Electricity is a general.
Residential Construction Unit 5- Energy Efficiencies and Mechanicals Mr. Todzia.
P  German physicist Georg Ohm ( ) found relationship between potential difference & current.  He kept potential difference & current.
Introducing… OutBack Power’s Radian Series GS8048 Inverter/Charger.
Chapter 26 DC Circuits. Units of Chapter EMF and Terminal Voltage - 1, Resistors in Series and in Parallel - 3, 4, 5, 6, Kirchhoff’s.
1 INTRUSION ALARM TECHNOLOGY POWER SUPPLIES. 2 INTRUSION ALARM TECHNOLOGY Security systems shall have a primary power source and a secondary power source.
Integrated Science Unit 3, Chapter 7.
GPS S8P5. Students will recognize characteristics of gravity, electricity, and magnetism as major kinds of forces acting in nature. Demonstrate the advantages.
 To Identify the concepts of electrical potential energy and electric potential.  To describe the basic properties of electric current.  To relate.
ADT490 Panel Theory. 2 System Power Supply Grounding ‣ Circuit separates positive / negative from Ground ‣ Ground fault - resistance to ground ≤ 10 kΩ.
Power Distribution System General Location. Power Distribution The Main Switchboard is the hub of the electrical distribution system. Everything ties.
A/C Power Systems General Locations. This module will cover the General Locations of the A/C Power Systems through out the vessel. The A/C Power Systems.
ELECTRICAL SYSTEMS. Chapter Twenty One: Electrical Systems  21.1 Series Circuits  21.2 Parallel Circuits  21.3 Electrical Power.
SERVICE ENTRANCE EQUIPMENT
A Training Presentation On 220 KV GSS CHOMU,JAIPUR
Shore Power System General Location. Shore Power Power comes on to the vessel in the form of 480 Volt, Three Phase, 60 Hz Alternating Current (A/C) electricity.
A Training Presentation On 132 KV GSS JAIPUR Submitted in partial fulfillment For the award of the degree of BACHELOR OF TECHNOLOGY Submitted To:- Submitted.
A SEMINAR ON 400 KV GSS(RRVPNL) BIKANER.
Closed Circuits In applications requiring the use of current, electrical components are arranged in the form of a circuit. A circuit is defined as a path.
Auto turn off battery charger Auto turn off battery charger.
HOUSE WIRING Final Review. Electricity Electricity = flow of electrons Conductor= electricity passes thru easily - Metal, water, person Insulator = restricts.
Switches and Over Current Protective Devices Class Instructor ALPHER E. DE VERA, uap.
HOUSE WIRING NOTES. Electricity  Proton – positive charge  Electron – Negative charge  Electricity = flow of electrons Conductor= electricity passes.
Chapter 19 DC Circuits. EMF and Terminal Voltage Any device that can transform a type of energy into electric energy is called a source of electromotive.
SYNERGY INSTITUTE OF ENGINEERING AND TECHNOLOGY
Basics of Bypass Capacitor, Its Functions and Applications.
Using a Multimeter.
Automatic Transfer Switches
Electrical Engineering for Physicists How to get from the 208 VAC 3-phase power in the building to 110- and 220-VAC Code issues All work must be done in.
Making Circuits Safe SNC1P1 Findlay.
Circuit Protection Unit 9.
Special-Purpose Outlets— Electric Heating, Air Conditioning
Understanding Olympian Generator Set Schematics
Energy Consumption: HOME.
Energy Consumption: HOME.
Agricultural Systems Technology II
Series and Parallel Circuits
Practical electricity
SERIES AND PARALLEL CIRCUITS
EET 323 – Electrical System Design Lecture 4: Wiring Devices
EET 323 – Electrical System Design Lecture 9: Grounding
Energy Consumption: HOME.
A. Touching both terminals with the hands can cause electrical shock
Lecture 2 Electrical and Electronics Circuits. After you study, and apply ideas in this Lecture, you will: Understand differences among resistance, capacitance,
DIPLOMA In ELECTRICAL ENGINEERING DEPARTMENT OF ELECTRICAL ENGINEERING GOVERNMENT POLYTECHNIC COLLEGE, HANUMANGARH Sept A Training Presentation On.
Presentation transcript:

Organizing Wiring with Load Groups Load Groups may be needed for safety or functional reasons. The concept applies to both AC and DC systems. Load shedding is a specific application of load groups to manage system loads.

Presenters Brian Criner – Paneltronics, Inc. Wayne Kelsoe – Blue Sea Systems (retired) Both are members of the ABYC Electrical Project Technical Committee

What is a load group? For our purposes, it is a group of branch circuits that have some shared characteristic, typically a specific source or return. Load groups are not mentioned in ABYC but it is implicit in many of the design requirements.

Load Groups in AC Specific load groups such as distribution from dual shore cords or from inverters are required for safety and functional reasons. Others manage loads that are eligible to be supplied only by specific sources. Others, such as using sub-panel distribution, involve good practices to contain noise, to control voltage drop. Load Groups can also be a way to organize load shedding to help control priorities when available power is limited.

Single 240VAC Source – Dual 120VAC Bus

Dual Shore Cords

Each group has its own neutral The safety ground is common, it can be two busses, each connected to the DC Gnd, or a single bus. We have been doing this for years, but it can be at risk if a subsequent installer adds something and breaks the rules. Returns a neutral to the wrong bus. Will trip ELCI’s Selects the wrong shore cord, may not create expected function.

Dual Shore Cords Can be done with two panels Can also be done with a single panel divided into groups Busses are most easily split in distinct columns Column busses can be segmented, but present more difficulty with marking Much easier to access the wrong neutral bus when working in a shared panel It would really be nice to help differentiate with color codes, but having extra colors in AC is a supply and a convention problem. Mark neutrals with colored tape.. Blue on Shore 2? Mark backside of shore 2 breakers with the same color?

“Pass Through” Inverters

“Pass Through Inverters” Some loads are inappropriate to feed from an inverter Some auxiliary battery chargers (handy for charging specialty batteries) Water Heating Space Heat and Air Conditioning This leads to the Pre-inverter and Post-inverter Neutrals The neither neutral can be grounded on the boat when shore power is in use. The post inverter neutral should be grounded when the inverter is the source of power and this is usually handled inside the inverter/charger if it is a marine inverter.

Common Errors Connecting a Pre-inverter load to the Post-inverter neutral. Will appear to function normally Could ground the shore neutral temporarily during the transition to shore power! Depending on dock wiring, large circulating current can flow from dock neutral to ground. Connecting a Post-inverter load to the Pre-inverter neutral. Will not function when in inverter mode. Could back feed, causing shore input neutral to be “hot” to ground during inverter operation, causing a shock hazard!

A “non-pass through” inverter Inverter’s that don’t pass through AC when available can be used with a manual selector switch. This allows the inverter’s output to be grounded, but kept separate from the shore neutral. Same considerations for applying loads to appropriate neutrals apply

MAIN DISTRIBUTION PANEL

Inverter without Automatic Transfer

Add in a GenSet

Adding the GenSet Did not introduce any new load groups in this configuration. Did add a source selector

Now we add a load group for the GenSet

GenSet only Load Group We see this on commercial fishing boats The refrigeration system requires more power than the shore cord can handle. Other possible loads may be larger air conditioners or anything not to be used in port. Alternative is run through main panel and post operator instructions not to use on shore power.. Prone to error.

Isolation Transformer with GenSet

Hey, that is only one load group. Why talk about that? Well, in older boats we see a variation on the theme that is a bit disturbing.

It is tempting to tie all neutrals common and use single pole source selection!

Now we have circulating currents in the Ground This is pretty easy to find on older boats Generally the circulating current will not exceed wire capacity This can cause voltage drop in grounds and differences in ground potential

This could be fixed with a single point grounding of the neutral at the common bus.

Using a single tie between Neutral and Ground would call for an exception to E-11 Instead of grounding the neutral at the source of power Ground the Neutral at the common bus If you have to work on a boat like this, consider single point grounding of the neutral rather than a major rewire.

Sub-Panels create load groups Source Main

Sub Panel load groups That looks pretty obvious How can we mess that up? Taking a short cut from a branch load back to the main neutral or to the main ground can increase noise and magnetic fields.

Neutral “Shortcut”

Example: Water heater is in engine room near main panel, but feed is from sub panel near the galley for ease of control. Well meaning installer shortcuts the neutral to the main neutral bus to shorten wiring. The big wire loop generates a magnetic field proportional to the area enclosed. These AC magnetic fields can induce currents in nearby metal If wires pass separately through a metal bulkhead or enclosure the circulating current can even start a fire! The same mistake in a DC system generates DC magnetic field, compass error and also transmits noise

Ground “Shortcut”

What is the harm, grounding wires are not normally current carrying? In power electronic devices such as battery chargers, many of the capacitors in the EMI filters return to the case ground. The filter current is noise current being directed to ground to reduce voltage changes on the case of the product. Again, the noise currents from EMI filters can occur in DC systems Good practice to bundle hot, neutral and ground or Plus, Minus and Ground in single cables or bundles.

DC Load Groups We talked about pairing feeds and returns as it applies to both DC and AC distribution. Other DC load groups are common wherever different battery systems are involved: Engine Start, House, Inverter, Bow Thruster, etc. Less obvious are Noise Sensitive vs. Noise Producing devices, may require distinct feeders and returns. Vital service such as navigation and communications with distinct source switches to choose the best available source. Loads that tolerate voltage drop distinct from those that are tolerant.

Basic DC Load Groups – House + Start

Adding 24 Hour Circuits

MAIN BATTERY SWITCH PANEL

MAIN DC BREAKER PANEL

Load Shedding Manual Need Ammeters for AC Need Voltmeter or State of Charge Meters for DC Meters with Alarms more effective than just indicators Automatic Dedicated switch devices in line with specific loads Meters with alarm outputs that can drive relays Digital Switching Systems that can be programmed for load shedding Smart Inverter/Chargers that cut charging current when other loads are high

AC Meters for Manual or Automatic Load Shedding Alarm Alarm plus Relay Out

DC Meters for Manual or Automatic Load Shedding Alarm Alarm plus Relay Out

Load Shedding – Dedicated Devices Example: Low Voltage Disconnect for DC Useful for removing low priority loads Example: Audio Systems on Ski and Wake Board boats without dedicated house batteries.

Load Shedding – Panel Groups When laying out a panel, low priority loads can be grouped for manually disconnecting Panel feeders can be cut, so dedicated devices or relays can drop out more than one circuit at the panel

Load Shedding – Digital Switching Digital Switching systems with measurement capability can be programmed to shed loads Examples are C-Zone, Carling ECS III, ETA PowerPlex, EmpirBus See individual manufacturers for capabilities, availability Many of these systems are targeted to OEM installation in larger boats. May or may not be suited to retrofit.

Load Shedding – Inverter-Chargers Mastervolt, Xantrex, Victron and possibly others have inverter/chargers that reduce charger load as AC line is overloaded. Unless there is an input for external metering, all AC must pass through the inverter This is different from the load group discussion earlier that isolated non- inverter loads Some units pass power for the non-inverter loads through the inverter for purposes of measurement, integrates with the load group panel design discussed earlier. See manufacturers here at the show for specific capabilities

AC LOAD SHEDDING Purpose in Life Eliminates nuisance tripping of shore main (dock and vessel) and generator main by momentarily shedding and then restoring loads

AC LOAD SHEDDING System will automatically shed loads when total current draw from shore or generator exceeds a preset threshold Automatically restores power to shed loads when total current drops below the threshold Should be easily integrated into existing or new Marine electrical power distribution systems Display can be remote mounted to better accommodate existing systems

SYSTEM COMPONENTS DISPLAY INTERFACE

120VAC TURNKEY ASSEMBLY

SYSTEM INSTALLATION

Any Questions? Thank You!