1 AMS-02 Integration & Test Plans & Status Trent Martin 24 January, 2007.

Slides:



Advertisements
Similar presentations
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Advertisements

Xenon Detector Status Liquid Xenon Group. 1 Outline Cryostat construction –Honeycomb panel test at Pisa –Assembly –Cryogenic test at SIMIC –Leak test.
1 AMS-02 TRD Status Report Stefan Schael RWTH Aachen TIM Meeting, CERN, June 2001 TRD meeting: Wednesday 16:15 in room !!!
R.Becker (MIT) 15/10/02 UGBS Main Plate Patrick Schmid (left) of ETHZ did the CNC machining of the plate. Urs Horisberger (ETHZ) Completed follow up machining.
ATLAS Pixel Detector February 2003 N. Hartman LBNL 1 Pixel Support Tube PRR: Assembly, Production, Schedule February 2003.
AMS-02 Cryosystem Phase III Flight Safety Review January 12, 2010 Phil Mott.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
AMS tracker hardware status (mechanics and cabling) Divic RAPIN, UniGe AMS splinter tracker, Septidi 7 Brumaire 217 (october 28, 2008) off-line operations.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
AMS-02 tracker mechanics status of construction, assembly, integration Production: - Ladder integration - Installation on planes Inner tracker assembly:
MICE Video Meeting, 10 Jan 081 Spectrometer Magnet Progress Michael A. Green Lawrence Berkeley Laboratory.
AMS-02 Delta CDR Thermal. Overview Changing from Cryomagnet to PM greatly simplifies AMS-02 Thermal requirements – Keeping vacuum Case “cold as possible”
Stator Plan & Schedule Chris Booth 2 nd March stators to construct for mid-April. One complete coil assembly recovered from ISIS drive. Coils recoverable.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Integration and Test 14 October 2008 Martin Nordby.
SR1 ongoing workH.Pernegger21/2/02 Ongoing work in SR1 and preparations for detector macro assembly Heinz Pernegger.
Ground Safety Review – Phase II September 8-10, 2008 Phil Mott
Leland HillAMS-02 Phase II Safety Review 1 PHASE II FLIGHT SAFETY REVIEW.
Current Safety Status Phase III Flight Safety Review 12 Jan 2009.
Other Flight Pressure Systems Phase III Flight Safety Review 12 Jan 2009.
AMS Cabling CERN Prevessin 893-1D020 December 6, 2006 Agenda 1) Brief overview -Show Plumbing and VC ring-mounted-hardware -AMS overall -Common.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
AMS TIM July, 2008 – CERN 1 AMS 02 –Thermal Control System Design AMS-02 Thermal Control System (TCS)
Overview of AMS-02 Changes due the addition of the Permanent Magnet
24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 1 LARP Vertical Test Facility Vertical Dewar Design, Magnet Prep And Installation Paul Kovach.
Director’s Review Dec 1999 Tracker Integration and Installation W. E. Cooper 6 December 1999.
Status of AMS02 Integration Area in Building 867 January 10, 2007.
ATLAS SCT End-Cap C Integration 1.Introduction: to the SCT within ATLAS 2.End-Cap C Reception at CERN 3.Final Assembly 4.Integration with the TRT 5.Combined.
STATUS OF HO Sudhakar Katta TIFR, Mumbai India-CMS meeting, Delhi 27 th Sept 2007.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
Neil JacksonUK-V RAL 8th September Module to Disc Assembly Infrastructure –Services and test box –Evaporative cooling system –Disc Handling Tests.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware December 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
1 AMS-02 Integration & Test Plans & Status Ken Bollweg/NASA John Heilig/JS Robert Becker/MIT 12 January, 2007 AMS JSC.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
AMS-02 tracker mechanics status of construction, assembly, integration Ladder assembly Ladder installation on planes Integration details, cooling loop,
M. Brooks DC Meeting, 15-Sep-00 MuTr Mechanics Status SOUTH ARM: Chambers fabrication complete Stations 2+3 installed Station 1 test-installed will be.
Goddard Space Flight Center Cryogenics and Fluids Branch Status of the AMS-02 Cryocooler January 2007 TIM.
Payload Safety Review Plan and Issues Leland D. Hill.
Composite Overwrapped Pressure Vessels
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Operations and Logistics LAT Environmental.
G.Barber Mice Tracker Integration Harbin Jan Mice Tracker Integration Installation requirements & Procedure.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
ESCG\L. D. Hill AMS-02 Permanent Magnet Safety Impact 1 AMS-02-PM Design Review - May 4-5, 2010.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
KSC Ground Operations Timeline. KSC CGSE TIM A Technical Interchange Meeting regarding the Cryo Ground Support Equipment was held at KSC November 1 st.
PHASE II FLIGHT-SAFETY REVIEW AMS-02 EXPERIMENT sub-detector SILICON TRACKER Roberto Battiston - AMS-02 Phase II Safety Review - Houston JSC May 21-25,
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
Installation of the T600 at Fermilab CSN2, September 22,
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
CR AMS-02 D-0161 AMS Configuration Control Board Comments for AMS-02/D-016 Magnetic Spectrometer – 02 (AMS-02) Assembly and Testing Integration Plan.
Phil MottAMS-02 Phase II Safety Review1 Vacuum Case Mechanical Design Alpha Magnetic Spectrometer (AMS) - 02 Phase II Flight Safety Review Vacuum Case.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
AMS Tracker Meeting17/10/05 Eric Perrin (GE) Tracker mechanics at Uni -Ge Safety issues Assembly Still to be made.
AMS TIM January, Houston 1 AMS 02 –Thermal Control System Design AMS Thermal Control System (TCS): A Status Report Group Leaders: Drj Sun – AIDC,
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
Stator Plan & Schedule Chris Booth 2nd March 2009
Installation of the T600 at Fermilab
Completion of the MICE-US construction project
LARP Vertical Test Facility
GLAST Large Area Telescope:
Cryomodule Assembly Plan
Polarized 3He target installation
Presentation transcript:

1 AMS-02 Integration & Test Plans & Status Trent Martin 24 January, 2007

2 Agenda Integration Documentation AMS Assembly Area/Clean Room 867 STA & Flight Integration Hardware Status Pre-integration of STAs in the Flight USS prior to STA VC/CMR arrival Pre-integration of Detectors on the STA VC & Flight USS prior to Flight Cryomagnet arrival Integration discussion items & plans for resolutions Final Flight Integration

3 Integration Documentation All NASA developed AMS documentation can be found at – –Includes payload Interface Control Documents and AMS-02 Assembly and Testing Integration Plan

Assembled AMS 02 AMS 02 Shipping Upper Part Lower Part AMS 02 Integration at CERN

- Beam Test - Experiment Calibration - Thermal Vacuum ESTEC AMS-02 CERN / ESTEC KSC Processing KSC Launch 3 Operational Years ISS AMS-02 Hurricane Cover SSPF

AMS 02 Assembly Sequence for Pre-Integration and Flight Integration

Upper USS & Magnet Technical Interchange Meeting July 23, 2004 R.Becker (MIT) Magnet USS-02 UPS CAB CVB 1) SCL delivers Magnet (Flight) or NASA delivers STA Magnet (Pre-Integration) 2) NASA delivers USS 3) USS main bolted to Vacuum Case (Magnet must be warm) & placed into rotation assembly stand

Radiator Mounted Electronics Assembly - Crate Installation using Jig Electronics Assembly Jig Installed Electronics mounted in sequence with detectors during pre-integration Jig replaced with Radiator during flight integration when all crates are linked and form a self supporting structure

VC ACC 1)Finger brackets bolted to inner lower bore of VC 2)16 Scintilator panels placed in inner bore resting on finger brackets 3) Carbon composite cylinder and with compliant brackets mounted at upper and lower inner edge of VC securing the paddles 4) PMT’s, fiber couplers, and optical fibers mounted to Conical flange ACC VC

Star Tracker Tracker Electronics Crates Tracker VC Flange of VC Tracker Cooling Box Tracker, Cooling, & Star Tracker 1) Tracker Inner planes and upper conical flange lowered and secured 2) Lower conical flange mounted 3) Cooling loops, TTCS, & plumbing 4) Outer planes (1 & 5) 5) Crates & cabling* 6) Star Tracker camera 1) 2) 3) 4) 5) 6)

TRD & Upper TOF TRD MLI TRD GAS System TRD 1) TRD with M-structure lowered onto USS & bolted 2) Gas system installed and plumbed to TRD 3) MLI enclosure 4) Crates & Cabling Upper TOF: 1) Upper TOF mounted to TRD

(6) RICH 1) RICH lowered, shimmed and bolted to lower USS 2) Crates and Cabling (7) ECAL RICH/Lower USS assembly lifted & lowered onto ECAL –then bolted in place Crates & Cabling These steps can be done in parallel with upper USS integration and only need to be done once (ie. No pre-integration) (5) Lower TOF 1) Reinforced with Jig, rolled underneath AMS & lifted into position. Struts adjusted and bolted in place 2) Crates and Cabling Lower USS Integration

Upper Part Upper & Lower Parts Integration 1)Lower part rolled underneath Upper 2)Lifted in place, shimmed, and bolted 3)Electrical connections made Lower Part

Temporarily remove mid- brackets and lower struts De-integration for Flight Magnet

Move Main Ram & Wake Radiators outward to allow installation of Flight VC & Magnet Temporarily Reattach Top Brackets to Upper USS

RAM Radiator Radiators & Electronics 1)Zenith radiators with plumbing attached assembled in quadrants: bolted to TRD upper honeycomb and heat exchangers to Cryocoolers 2)Plumbing secured and insulated 3)Main radiators: jigs removed from self supporting crates and radiators bolted 4)Tracker Radiators: Jigs holding heat exchangers removed and radiators lowered and bolted to USS and exchangers Zenith Radiator Tracker Radiator WAKE Radiator Tracker Radiator RAM Radiator

17 AMS Assembly Area Clean Room 867 Everything in the AMS Assembly Area/Clean Room 867 needed to begin the STA integration will be ready no later than (NLT) February 2, Operation as a Clean Room (air conditioning, filters, sealed & positive pressure) will be ready in May, 2007 Rotation Assembly Stand (RAS) delivered, assembled, installed, and ready for use Scaffolding delivered, assembled, and ready for use

18 AMS Assembly Area Clean Room 867 Information provided in the Resource Requirements checklists has been used to order common use supplies and to estimate facility requirements Work area required – with & without crane access & special access Crate storage area, volume, and environment Tables & chairs Storage cabinets & open shelves Air bearing pallet requirements Cleaning fluids/supplies & vacuum cleaners Supply gases (He, CO2, N2, Compressed air, etc.) Fans for ventilation/cooling of hardware & personnel Power requirements ??? If you didn’t ask for it on the checklists, do NOT expect it to be provided!

19 Remov- able Ceiling Panels N Ceiling Panels are NOT Removable Airlock AMS Assembly Area Clean Room 867

20 STA VC integration with the STA Magnet (Cold Mass Replica - CMR) was completed in December at SM STA VC Arrived in Terni/INFN for Sine Sweep Tests on January 10th Test hardware was previously shipped to Terni and testing has been completed Ship STA VC to ESTEC for Acoustic Tests - March ’07 * Return to CERN for integration in USS – late March ’07 * * Depends on results of STA VC/CMR sine sweep & acoustic tests AMS STA Integration Hardware

21 Flight USS is complete and has arrived at CERN with the Primary Support Stand (PSS) and the Primary Lift Fixture (PLF) AMS Flight Integration Hardware Flight Vacuum Case is complete and will be shipped to SCL/SM when they have room in their facility to accommodate it (after Flight Cryomagnet tests are completed and the SFHe Tank is delivered and SFHe leak tested)

22 Pre-integration of STAs in the Flight USS Prior to STA VC Arrival STA Hardware Pre-integration in Flight USS On-line integration of the STA Crates/Radiators on the USS will begin the week of February 5, 2007– before the STA VC arrives This allows work to proceed even if the sine sweep & acoustic tests are delayed 10T crane installation will be delayed until after STA Pre- integration is complete at beginning of March If necessary, the USS/STAs in PSS will be moved away from crane installation There are ~3-4 weeks available in March to use the flight USS & STAs for fit checks, cable & plumbing runs, measurements, etc.

23 STA Hardware assembly in Flight USS (cont) Integration of all STAs in USS to be completed by mid-April ’07 * Even though the STA VC delivery to Terni slipped ~5 weeks and the RAS readiness at CERN slipped ~3 weeks, this is only ~2 weeks later than previously reported at AMS TIM on October 27, 2006 Ship USS with STAs to Munich/IABG in April ’07 * Static Tests Modal Tests Return USS with STAs to CERN in August ’07 * * Depends on results of STA VC/CMR sine sweep & acoustic tests and USS/STA modal & static tests Pre-integration of STAs in the Flight USS Prior to STA VC Arrival

24 Interference between Flight VC/Magnet & Electronics Crates during Final Flight Installation R. Becker/MIT, J. Kastelic & P. Mott/JS, & R. Stafford-Allen/SM to determine how much room is required to clear the Flight VC/Magnet as well as how much room is available by Jan 29 th. Provide estimate of additional length required for lower inter-radiator cables to M. Capell & A. Lebedev Final cable routing must accommodate additional length Be sure there’s no interference with hardware mounted outboard of crate jigs during pre-integration activities Upper inter-radiator connections will be disconnected because the additional length will be too much additional weight C. Lauritzen/JS to determine if there is any problem on the USS if the brackets are temporarily re-attached at a wider position by Feb 5th M. Molina/CGS to determine if Radiator brackets are OK by Feb 5th Consider using blocks/spacers under the brackets and reattaching the lower struts K. Bollweg & J. Heilig will arrange trial test using STA Crates/radiators in late February

25 All the detector groups have continued to evaluate the pre- integration proposal and have agreed that it should proceed according to the schedules thoroughly discussed at this TIM Current estimate of Pre-integration start: August, 2007 Pre-integration finish: December, 2007 Optical fibers between ACC & VC for TAS will be installed Constantly monitor the Cryomagnet progress and decide how much more flight hardware to pre-integrate Current estimate of magnet delivery to CERN: February, 2008 Do as little de-integration as possible – just in time to remove the STA VC and install the Flight VC & Cryomagnet in the USS Pre-integration of Detectors on STA VC & USS prior to Cryomagnet Arrival

26 Consider removing the STA VC, Tracker, and ACC from the USS as an assembly so parallel work can continue during Flight VC/Magnet installation Use VC rotation fixture and wheels/brackets developed at SM This could shorten deintegration by 2-3 weeks; thus allowing combined cosmic ray testing to be extended Pre-integration of Detectors on STA VC & USS prior to Cryomagnet Arrival

27 All detectors must be integrated and functionally tested with the Flight VC and Cryomagnet at CERN by July, 2008 Beam tests at CERN (~1 month reserved) Thermal Vacuum Tests at ESTEC (~3 months reserved) EMI Tests at ESTEC (~1 month reserved) Delivery to KSC in December, 2008 Final integration of Detectors on Flight VC & USS after Cryomagnet Arrival

What we have… sort of.

Where we must be by December 2008 at KSC...