Investment Model for Moving to a Data– Centric Configuration and Asset Information Management System Breakout Session June 9, 2015 Bob Renuart – Renuart.

Slides:



Advertisements
Similar presentations
1 of 18 Information Dissemination New Digital Opportunities IMARK Investing in Information for Development Information Dissemination New Digital Opportunities.
Advertisements

Chapter 1 Business Driven Technology
Components of GIS.
MIS 2000 Class 20 System Development Process Updated 2014.
US Department of Energy Smart Grid Computational Tool (SGCT) Overview Note: View presentation in Slide Show mode for best results
Importing Transfer Equivalencies: How to Maximize Efficiency How Columbia College Office of Registrar improved productivity through third party solutions.
Group 3 John Gregory John Marsh Gerri Houston Samantha McNeily.
© ABB Group May 15, 2015 | Slide 1 The MotorAdvantage – how to save UK industry Steve Ruddell, Division Manager, Discrete Automation and Motion, ABB Ltd.
Dr Gordon Russell, Napier University Unit Data Dictionary 1 Data Dictionary Unit 5.3.
Plant Information Model (PIM) Breakout N1 – (1:00pm – 2:30pm), Monday, June 16, 2014 Russell Adams – EPRI Consultant Laurent Perkins, Bentley Kent Freeland,
Delaware Valley Chapter
Projmgmt-1/33 DePaul University Project Management I - Risk Management Instructor: David A. Lash.
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by.
0 Smart Grid Computational Tool (SGCT) For best results view this presentation in Slide Show mode.
©2003 Prentice Hall Business Publishing, Accounting Information Systems, 9/e, Romney/Steinbart 18-1 Accounting Information Systems 9 th Edition Marshall.
Software Configuration Management (SCM)
Lecture Nine Database Planning, Design, and Administration
Computerised Maintenance Management Systems
United Nations Economic Commission for Europe Statistical Division Applying the GSBPM to Business Register Management Steven Vale UNECE
Systems Life Cycle A summary of what needs to be done.
Cash Flow Management For Non-Profits Presented by Theresa F. Weber Alexandria Consulting Team (ACT) LLC
Chapter 22 Systems Design, Implementation, and Operation Copyright © 2012 Pearson Education, Inc. publishing as Prentice Hall 22-1.
© Mahindra Satyam 2009 Project Metrics QMS Training.
Commercial Database Applications Testing. Test Plan Testing Strategy Testing Planning Testing Design (covered in other modules) Unit Testing (covered.
Database System Development Lifecycle © Pearson Education Limited 1995, 2005.
IS 466 ADVANCED TOPICS IN INFORMATION SYSTEMS LECTURER : NOUF ALMUJALLY 3 – 10 – 2011 College Of Computer Science and Information, Information Systems.
Appendix 2 Automated Tools for Systems Development © 2006 ITT Educational Services Inc. SE350 System Analysis for Software Engineers: Unit 2 Slide 1.
Project Risk Management. The Importance of Project Risk Management Project risk management is the art and science of identifying, analyzing, and responding.
Computer Literacy for IC 3 Unit 1: Computing Fundamentals © 2010 Pearson Education, Inc. | Publishing as Prentice Hall.1 Chapter 1: Identifying Types of.
MSS Technologies and the AIIM Grand Canyon Chapter present: Electronic Document Management System Needs Analysis.
© 2009 Capaccio Environmental Engineering, Inc. “Helping Industry and the Environment Prosper” Pollution Prevention Saves Money By Reducing Operational.
Transaction Processing System  Business Transactions are certain events that occur routinely in a business firm.  A transaction is a set of activities.
Find out more about JCS at Importance of online resources from trusted sources...
Why you need Stratity™? Mantos Consulting, Inc. Stratity™ is a proprietary process used to develop Information Technology (I.T.) Strategies that support.
OBJECT ORIENTED SYSTEM ANALYSIS AND DESIGN. COURSE OUTLINE The world of the Information Systems Analyst Approaches to System Development The Analyst as.
© 2001 Business & Information Systems 2/e1 Chapter 8 Personal Productivity and Problem Solving.
1 Information Handover at UniStar Lessons Learned Presented By: Bob Renuart UniStar.
The Computer System Review Game. Allison turned her computer on, but nothing happened. What is Allison’s computer most likely missing? A. Application.
Configuration Management Benchmarking Group Conference June 6 – 9, 2004 Kansas City, MO © 2004 CMBG Characteristics of a Good Calculation Program Presented.
Technology Transfer Execution Framework. 2 © 2007 Electric Power Research Institute, Inc. All rights reserved. Relationship Between Your EPRI Value and.
Database What is a database? A database is a collection of information that is typically organized so that it can easily be storing, managing and retrieving.
Computers Are Your Future Tenth Edition Chapter 13: Systems Analysis & Design Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall1.
Glen Fields - Final Project Presentation. What Sets CSI Apart... GBA 573 Consultants Company Background Located in San Diego, CA 5 Engineering Consultants.
©2002 Prentice Hall Business Publishing, Introduction to Management Accounting 12/e, Horngren/Sundem/Stratton Chapter 1 Managerial Accounting & The.
Chapter 5 Technology in the Business Office Copyright © 2011, 2006 Mosby, Inc., an affiliate of Elsevier. All rights reserved.
Cmpe 589 Spring 2006 Lecture 2. Software Engineering Definition –A strategy for producing high quality software.
An exercise in preservation and applied technology Making an Electronic Text.
GCSE ICT Systems Analysis. Systems analysis Systems analysis is the application of analytical processes to the planning, design and implementation of.
Financial Management and Budgeting The Details. What Is a Budget? A useful tool for keeping track of funds. A useful tool for keeping track of funds.
By: Dr. Mohammed Alojail College of Computer Sciences & Information Technology 1.
Computerised Maintenance Management Systems
Proven systems for managing asset integrity & reliability by implementing effective Ex maintenance and inspection strategies Streamlining the ATEX inspection.
Scientific data storage: How are computers involved in the following?
Chapter 1 Objectives Define the term, computer Identify the components of a computer Discuss the advantages and disadvantages of using computers Recognize.
Strategic Information Systems Planning
IOT – Firefighting Example
Accounting Principles, Ninth Edition
Computer Aided Software Engineering (CASE)
Industrial Assessment Center Database
Business System Development
Lecture 6. Information systems
Quality management standards
Unit I Flash Cards Start.
Configuration Management DataBase
SNC/SCANA – New Build Configuration Management
Accounting Principles, Ninth Edition
ACCOUNTING INFORMATION SYSTEMS Accounting Principles, Eighth Edition
Final Design Authorization
Managing Project Work, Scope, Schedules, and Cost
Accounting Principles, Ninth Edition
Presentation transcript:

Investment Model for Moving to a Data– Centric Configuration and Asset Information Management System Breakout Session June 9, 2015 Bob Renuart – Renuart Consulting Tom Esselman – LPI, Inc. Renuart Consulting 4626 Harbour Village Blvd. Ponce Inlet, FL 32127

Renuart Consulting Roadmap Where you are? Where do you want to be? How do you get data? How to populate the model and run it? How to get the money?

Renuart Consulting Roadmap Define “Current State” and “Future State”. Don’t define how to get there. Define this carefully. Write it down. Current State Future State

Renuart Consulting Potential CM End States – Each State Builds on the Prior State 1.Electronic Document Centralization 2.Documents -Tags Cross Referenced 3.Data Centralization 4.Relationship Model 5.2D/3D Model Integration with data model 6.2D/3D Model Authoring Tool Integration

Renuart Consulting Where Are You? End State 1 –Have you achieved electronic conversion of all the documents needed on a regular basis?

Renuart Consulting Where Are You? End State 2 –To what extent have you cross referenced documents to tags? –Have you expanded the tag cross references beyond process tags, e.g., cable tags, weld number tags, electrical device tags, etc? –Did you realize the benefits of finding the information for a particular tag better with the cross reference versus the old way of doing a text search for the tag in the document management system?

Renuart Consulting Where Are You? End State 3 –How many siloed databases do you have? –Do you have issues maintaining them up to date when the plant is changed? –Are all the databases considered as affected information resources that need to evaluated in a design change impact review? –If the design and program data were centralized and change controlled, could you eliminate the need to publish in documents?

Renuart Consulting Where Are You? End State 4 –Who has gone to an object-relationship model? –What was the driving factor for going to relationship model? –How much time do you estimate an engineer saves doing an impact review with a relationship model?

Renuart Consulting Where Are You? End State 5 –How many plants have integrated their 2D models with information access through the tag number? –How many plants have developed 3D models? –For what purpose? –Are they being maintained? –Are they hot spotted to the equipment database?

Renuart Consulting Future States 1.Electronic Document Centralization 2.Documents -Tags Cross Referenced 3.Data Centralization 4.Relationship Model 5.2D/3D Model Integration with data model 6.2D/3D Model Authoring Tool Integration

Renuart Consulting Roadmap Once “Current State” and “Future State” are defined, begin to define the path that you will follow. Can include software, computer systems, staff, cultural changes, and others. Current State Future State

How do you get this done? –Get data. –Populate the cost-benefit model and run it. –Present the results. –Get the money. 12 Roadmap Current State Future State

Renuart Consulting How Do You Get Data? Get endorsement from management for data collection. Set up a broad range of interviews. Generally do interviews one person at a time. Look for confirmatory or contradictory data. “What do you do? How much time do you spend? How much time will we save if we move to the future state?”

Renuart Consulting Input Worksheet

Renuart Consulting How Do You Define Distributions? L-1L-2 L-3 It is more likely that you will save less than expected.

Renuart Consulting How Do You Define Soft Cost Savings? Soft savings should be expected to occur with improved access to accurate information and improvised work processes. The soft cost reductions could include items such as: –reduction of regulatory risk –reduction in forced outage times –reduction of refueling outage time –Improved regulatory ratings –others

Renuart Consulting Enter Soft Savings

Renuart Consulting Complete Data Input Assign Distributions. Use User’s Manual to select other input like number of iterations, discount rate, correlations between input and savings, and others.

Renuart Consulting How Do You Define Investments? LABOR COSTS Start-Up (Staff per Year) Year Distr$ per person Initial Set-UpCY-4CY-3CY-2CY-1CY Configure Software 33333L3 $150,000 Data Mining03333L3 $130,000 Data Validation02222L3 $130,000 SME Evaluation and Input 33333L3 $180,000 Software Validation22222L3 $150,000 Scanning Documents00000L3 $ 80,000 Training00222L3 $200,000 YearCY-4CY-3CY-2CY-1CY Percentage Benefit of Savings0% 20%35% CY = Completion Year

Renuart Consulting Make Runs

Renuart Consulting Output

Renuart Consulting Use Cases Five Use Cases have been prepared based on the benchmarking.  Use Case 1: End State 1 + to End State 3 (Operating Plant)  Use Case 2: End State 1 + to End State 4 (Operating Plant)  Use Case 3: End State 1 + to End State 5 (Operating Plant)  Use Case 4: End State 1 + to End State 5 (New Plant)  Use Case 5: End State 1 + to End State 5 (New Plant) Each Use Case Model will be provided to a User so that their plant specific data can be entered and analyzed.

Renuart Consulting Where to Get More Information? EPRI Website - Report Bob Renuart – Renuart Consulting, Tom Esselman – LPI, Inc.