1 ROCKVILLE VOLUNTEER FIRE city of rockville, maryland MICHAEL HACKLEY ARCHITECTS.

Slides:



Advertisements
Similar presentations
1 SEVERN VOLUNTEER FIRE anne arundel county, maryland MICHAEL HACKLEY ARCHITECTS.
Advertisements

Southwest High School Albuquerque, New Mexico High School Design Concept / Projects Under Construction Award Perkins+Will 2008 Exhibition of School Planning.
1 HYATTSVILLE VOLUNTEER FIRE prince georges county, maryland MICHAEL HACKLEY ARCHITECTS.
YMCA Proposal Writing Successful Strategies for Financial Development.
1 Solicitations/Advertisements Solicitations/Advertisements
East Hampton High School July 2013 – July 2014 Design Phases.
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
ST. MARYS COUNTY HIGH SCHOOL CAREER-TECHNOLOGY FIRE AND EMS PROGRAM.
1 Procuring a Design Project engineers perspective on starting the design process and establishing the A/E scope of work Frank C. Quigley General Engineer.
City of Petaluma Fire Station/ Headquarters Building August 30, 2006 Workshop.
Facility Needs Assessment and Conceptual Design Pleasant Grove Civic Center.
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
ALTERATIONS TO HARTLEY DODGE MEMORIAL HOLT  MORGAN  RUSSELL ARCHITECTS.
College of Southern Nevada Instructional Center – City of Las Vegas Fire Station Las Vegas, Nevada Project of Distinction New Construction JMA Architecture.
Proposed Fire Suppression Service Gary Holte, Manager, Environment & Engineering Services Peter Jarman Manager Finance and IT Services.
Office Designs The Design Process at Work © MS Office Suite.
Chapter 4 After Green Light. After the Green Light Contractual Agreement Marketing Requirements Document (MRD) Project DefinitionBudget Project Approval.
4900 S ROUTE 31 CRYSTAL LAKE 1. AERIAL 2 PROPERTY HISTORY 3 Constructed by Sherman Hospital in 1978 Now Owned by Advocate Group.
South Bay-North Olympia Merger Preparing for our Future Objectives: 1)Brief Status Report 2)Incident Readiness & Response Staffing Assumptions for Budgeting;
FIRE DEPARTMENT ORGANIZATION State of Georgia BASIC FIRE FIGHTER TRAINING COURSE.
Design & Layout of Foodservice Facilities
NEW COMMUNITY FACILITY Adam Kroll - Lighting / Electrical - Consultant: Dr. Richard Mistrick - Tech 3: Schematic Design.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
Webinar April 19, 2011 HazMat Grant Program: HMEP Application Guidance Overview and Explanation of the Sample Application for the HMEP Grant Program for.
Fire & Emergency Services Administration Chapter 12 The Future.
ARCH – 4601 Architecture Firm Presentation Popham Walter Architects Jason B. Ashe.
Data to Deployment Clark County Fire Department IAFF 2007 EMS Conference.
Chapter 42 Construction Specifications. 2 Links for Chapter 42 Introduction Construction Specifications Construction Documents.
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
Fairfax High School Renovation and Addition Washington, DC M ICHAEL F UNK Construction Management.
Site Plan Review 8 May 2013 Jeff Shaw, AIA Principal-in-charge Newton Fire Station #10.
Westside Elementary School
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Preliminary Project Descriptions/Outline Specifications
DePauw University Judson and Joyce Green Center for the Performing Arts Greencastle, Indiana New Construction Project of Distinction Institutions of Higher.
Samuel Brighouse Elementary School
THE FUTURE OF MAKING THINGS BIM Design Submission Team Details Team Name - Member 1 - Member 2 - Institution - General Floor Plan Project Name:
Presented By: Jeffrey T. Folden, P.E. Assistant Chief, Innovative Contracting Division.
Business Project Plan Presenter Name | Company Name.
Lessons Learned From Opening a New Facility Steve Myers, LeeTran Director.
CPSC 372 John D. McGregor More EPF Module 2 Session 4.
Schematic Design | December 9, 2009 | Cassandra Watson Franklin Square Hospital Center Patient Tower and Emergency Department Addition.
Financial Update 1. Fund Balance Projections Final Adopted Budget Your Role in Improving the Department’s Financial Condition Questions/Answers.
THE GOVERNMENT OF THE HONG KONG SPECIAL ADMINISTRATIVE REGION FIRE SERVICES DEPARTMENT.
The Premier Business Team Project Collaboration Tool.
The Government of the Hong Kong Special Administrative Region Fire Services Department.
Capital Facilities Program Update San Rafael City Schools 10 May 2016.
Site & Building Assessment Study Conducted by: Caolo & Bieniek Associates, Inc. Fire Station Study Committee Report to Select Board September 18, 2006.
San Francisco Fire Department Facilities Update.
DHS/ODP OVERVIEW The Department of Homeland Security (DHS), Office for Domestic Preparedness (ODP) implements programs designed to enhance the preparedness.
Justice Planners and Designers 212 North 25 th Street, Milwaukee, Wisconsin / Door County Architectural and Engineering.
Alpine County Government Center Board of Supervisors Presentation June 26, 2013.
MONTROSE FIRE DEPARTMENT FIRE POLICE TRAINING. FIRE POLICE Members of a Volunteer Fire Department. Members of a Volunteer Fire Department. May receive.
BLAKELY  Welcome.
SONOMA COUNTY JUNIOR COLLEGE DISTRICT Measure H update for the Governing Board April 11, 2017.
San Francisco Fire Department FY 2006 Proposed Budget
John D. McGregor Eclipse Process Framework Module 2 Session 4
Woodbrook ES Addition & Modernization
ADDITION AND MODERNIZATION
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Acterna Headquarters John M Sekel, EIT Germantown, Maryland
the Franklin Square Hospital Center
Prepared by: Joshima V.M. University of Nizwa, Sultanate of Oman.
Design process.
IMPLEMENTATION TEAM STRUCTURE, ROLES, AND RESPONSIBILITIES
2011 Exhibition of School Planning and Architecture
FIVE PROJECT PHASES.
Project Name TEAM MEMBER 1 NAME TEAM MEMBER 2 NAME TEAM MEMBER 3 NAME
Center/Institute Name Director’s Name Proposal Team Members
Presentation transcript:

1 ROCKVILLE VOLUNTEER FIRE city of rockville, maryland MICHAEL HACKLEY ARCHITECTS

2 ROCKVILLE VOLUNTEER FIRE STATION #3 RELEVANT EXPERIENCE Name of project Rockville VFD Headquarters Fire Station #3 Type of building Fire and EMS Facility Project location City of Rockville, Maryland Total project cost 9 million (estimated) Project description New two story and basement 35,000 SF four drive through bay facility for a combination volunteer department. Project delivery method Traditional design, bid and build. Describe the services your firm provided Initial design, space planning and other standard architectural services. Indicate which team members were actually involved in the project and specify their role Michael Hackley was intimately involved in the feasibility study that created the project and later he will provide complete full-service architectural services particularly on the exterior and interior design including the initial concept design, interior space planning and circulation, material and equipment selections, construction details and will assist in the construction administration. Provide a statement acknowledging if the project was completed on time and on budget This project is in the initial design phase. Project contact Key Firm Personnel Russell Dawson, Deputy Chief R. Michael Hackley, Architect 380 Hungerford Drive, Rockville, Maryland Constant Course, Columbia, Maryland (301) (410) MICHAEL HACKLEY ARCHITECTS

3 overviews MICHAEL HACKLEY ARCHITECTS

4 side elevations MICHAEL HACKLEY ARCHITECTS

5 apparatus bays MICHAEL HACKLEY ARCHITECTS