AHCAL Electronics. Front-end electronics and DAQ Mathias Reinecke CALICE meeting Hamburg March 21st, 2013.

Slides:



Advertisements
Similar presentations
HCAL Front End Boards HCAL – Technical Meeting Status of the FE Boards Parameter Shift Register Time Schedule Test Setup Mathias Reinecke.
Advertisements

Sci-Fi tracker for IT replacement 1 Lausanne 9. December 2010.
LED calibration systems for CALICE hadron calorimeter June 11, 2011TIPP 2011, Chicago1.
LCWS2010, Beijing, 2010 MAR29 Ivo Polák, FZU, Prague1 LED notched fibre system at AHCAL Calibration system for SiPM Ivo Polák 1.Notched fibre.
Calice, UT ArlingtonJiri Kvasnicka, FZU, Prague1 LED notched fiber system Jiri Kvasnicka 1.Introduction 2.Test setup and fiber layout on HBU0.
Tests of the fiber-based calibration system CALICE collaboration meeting Cambridge, UK 2012/9/18 Jaroslav Zalesak Institute of Physics, Prague  QMB1 LED.
Oct, 2000CMS Tracker Electronics1 APV25s1 STATUS Testing started beginning September 1 wafer cut, others left for probing 10 chips mounted on test boards.
Mathias Reinecke CALICE meeting Argonne EUDET module – Electronics Integration Contents -Next prototype : architecture -HCAL Base Unit (HBU)
Feb 20, 2009 CALICE meeting, Daegu, Korea QRL in Magnetic Field 1 QRLed Driver in Magnetic Field Jaroslav Zalesak Institute of Physics of the ASCR, Prague.
Optical calibration system for EUDET AHCAL module Jaroslav Cvach IPASCR 1.Calibration system for SiPM photodetectors 2.QRLED driver photoelectron spectra.
AHCAL – Electromechanical Integration EUDET annual meeting – Paris Oct M. Reinecke.
LED calibration systems for CALICE hadron calorimeter Jiri Kvasnicka Institute of Physics, Prague June 11, 2011TIPP 2011, Chicago1 Under.
AHCAL Electronics. Status EUDET Prototype Mathias Reinecke for the DESY AHCAL developers EUDET Electronics/DAQ meeting London, June 9th, 2009.
Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.
Second generation Front-end chip for H-Cal SiPM readout : SPIROC DESY Hamburg – le 13 février 2007 M. Bouchel, F. Dulucq, J. Fleury, C. de La Taille, G.
AHCAL Electronics. Status and Outlook Mathias Reinecke AHCAL main Meeting D ESY Hamburg, Dec. 16th, 2014.
AHCAL Electronics. Status Commissioning and Integration Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 12th, 2010.
Calibration UV LED system for CALICE scintillator based Tile Hadron Calorimeter Ivo Polák on behalf of the CALICE Collaboration Institute of Physics of.
AHCAL – DIF Interface EUDET annual meeting – Paris Oct M. Reinecke.
AHCAL electronics. Status and Outlook Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 11th, 2010.
LCWA, ALCPG 2009 Albuquerque, NM Ivo Polák, FZU, Prague1 Calibration system of CALICE AHCAL detector Ivo Polák 1.Two calibration light distribution.
AHCAL updates: SPIROC and DIF Mathias Reinecke, Felix Sefkow CALICE/EUDET electronics meeting London, January 10, 2008.
AHCAL Electronics. Status and Outlook Mathias Reinecke CALICE collaboration meeting Cambridge, UK March 16th-19th, 2012.
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
1. DESY tests 2. Electronics developments 3. Optical developments 4. Outlook Casablanca J. Cvach, CALICE Coll. meeting.
AHCAL Status. Electronics and DAQ Mathias Reinecke CALICE meeting Argonne ANL, Mar. 19th, 2014.
HCAL – Integration Plans Mathias ReineckeHCAL – Main meeting Introduction 2.HCAL Base Unit (HBU) - Update 3.Testboards 4.Light Calibration System.
Detector Interface (DIF) Status CALICE meeting – DESYDec Mathias Reinecke.
R&D for a 2nd generation AHCAL prototype LCWS 2007 – DESY Hamburg Mathias Reinecke on behalf of the AHCAL partners.
5 July 2010Ivo Polák, FZU, Prague LED notched fibre distributing system Calibration system for SiPM Ivo Polák, Ji ř í Kvasni č ka
Vendredi 18 décembre 2015 Status report on SPIROC chips Michel Bouchel, Stéphane Callier, Frédéric Dulucq, Julien Fleury, Gisèle Martin- Chassard, Christophe.
Trip-t testing progress report
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers HCAL main meeting Hamburg, Dec. 10th, 2009.
AHCAL Physics Prototype. The Electronics Part Mathias Reinecke for the AHCAL developers DESY, March 2nd, 2010.
AHCAL electronics. Status Module Production an Power Pulsing Mathias Reinecke AHCAL main meeting DESY, Dec. 10th, 2013.
AHCAL Electronics. SPIROC2 and HBU measurement results Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.
SPIROC update Felix Sefkow Most slides from Ludovic Raux HCAL main meeting April 18, 2007.
Main HCAL, JUL1,2008Ivo Polak, IP_ASCR, Prague1 Calibration system with optical fibers HCAL main meeting, DESY.
DESY BT analysis - MPPC Saturation Correction - S. Uozumi Feb Sci-ECAL meeting 1.MPPC Gain Measurement (with LED data) 2.Inter-calibration of readout.
(s)T3B Update – Calibration and Temperature Corrections AHCAL meeting– December 13 th 2011 – Hamburg Christian Soldner Max-Planck-Institute for Physics.
Systematics on ScECAL 1 st prototype DESY Apr , CALICE Satoru Uozumi for the CALICE collaboration NIM A, 763 (2014) 278.
Mathias Reinecke AHCAL Main Meeting Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
ShinShu, 2012 Mar 6Ivo Polák, FZU, Prague1 LED notched fibre distributing system QMB1 with HBU2 test Ivo Polák, on behalf of Prague’s group
Organization for Micro-Electronics desiGn and Applications Ludovic Raux OMEGA microelectronics group Ecole Polytechnique & CNRS IN2P3
AHCAL Electronics. integration status and open issues Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.
AHCAL Electronics. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE Days DESY Hamburg, March 31st, 2009.
14 jan 2010 CALICE/EUDET FEE status C. de LA TAILLE.
AHCAL Integration. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE week Lyon IPNL, Sept. 16th – 18th, 2009.
Mathias Reinecke CALICE week - Manchester Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
Study of the MPPC for the GLD Calorimeter Readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group Kobe Introduction Performance.
KM2A PMT testing platform FENG Cunfeng, LI Chaoju, SUN Yansheng Shandong University THE 2 nd WORKSHOP OF AIR SHOWER DETECTION AT HIGH ALTITUDES IHEP, Beijing,
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers EUDET electronics and DAQ meeting Paris Palaiseau, Jan. 14th, 2010.
AHCAL Electronics. status and open issues Mathias Reinecke CALICE ECAL/AHCAL - EUDET electronics and DAQ - AIDA DESY, July 5th to 6th, 2010.
LED notched fibre distributing system Calibration system for SiPM
STATUS OF SPIROC measurement
LED notched fibre system short HBU0 party with QMB6
CTA-LST meeting February 2015
Status of HBU, EBU and SM_HBU
CALICE meeting 2007 – Prague
HCAL task status report
Testbeam Timing Issues.
LED notched fibre system at AHCAL Calibration system for SiPM
HCAL Modules -First Ideas
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
SPIROC Status : Last developments for SPIROC
CALICE meeting 2007 – Prague
Status of the EUDET Prototype
Scintillator HCal Prototype
Presentation transcript:

AHCAL Electronics. Front-end electronics and DAQ Mathias Reinecke CALICE meeting Hamburg March 21st, 2013

Mathias Reinecke | CALICE meeting | March 21st, 2013 | Page 2 Outline > Latest results from electronics tests  SPIROC2c  Integrated LED System  SiPM termination > New AHCAL DAQ HBU2 stack

Mathias Reinecke | CALICE meeting | March 21st, 2013 | Page 3 SPIROC2c at DESY SPIROC2c on HBU2 > Input stage referenced to GND (not VDDA) > Set HG/LG PAs separately. > SP2b pedestal shift gone? SP2b: by Oskar Hartbrich SPIROC2b

Mathias Reinecke | CALICE meeting | March 21st, 2013 | Page 4 SPIROC2c ped.-shift: Setup > Charge injection with two pulse- generators (see right). > LED system and tiles. Experimental setups:

Mathias Reinecke | CALICE meeting | March 21st, 2013 | Page 5 SPIROC2c ped.-shift: Charge Injection, autotrigger > Channels with and without signal show different behaviour. > Autotrigger mode: pedestals rise with signal amplitude in neighb. channels.

Mathias Reinecke | CALICE meeting | March 21st, 2013 | Page 6 SPIROC2c ped.-shift: LED system > LED light into 4 channels (50ns shaping, 300fF PA feedback). > Pedestals show distortion at high signal amplitudes in neighb. channels. HG LG medium amplitude 36 channels 1 trigger high amplitude

Mathias Reinecke | CALICE meeting | March 21st, 2013 | Page 7 Conclusions SPIROC2c > Pure pedestal shift much smaller in SP2c. But additionally: pedestal distortion. > Possible reason for pedestal distortion: crosstalk via GND (input reference). One problem: changed pinout of SP2c: “high” impedance gnd path. > In SP2c and SP2b both, the pedestal shift/distortion depends on preamplifier and trigger discriminator setting (on/off). > The effects need deeper understanding => new tests ongoing.

Mathias Reinecke | CALICE meeting | March 21st, 2013 | Page 8 Current LED System > Switch-on time varies up to 10ns (left). > LED Bias (VCALIB) shows large spread (right) and depends on position. > Reasons for both cannot be the LEDs alone. nsec by Oskar Hartbrich 18 channels, same optical power for SPS characterization in each channel. LED light measured with PMT H

Mathias Reinecke | CALICE meeting | March 21st, 2013 | Page 9 LED Driver on HBU2 8 repeaters for 144 channels: > Different trace lengths. > Repeaters have to drive capacitive load and work at their limits.

Mathias Reinecke | CALICE meeting | March 21st, 2013 | Page 10 Modified LED system – Single Channel VCALIB1 LED TCALIB1‘ 144x on HBU2 51  => 91  LED charge capacitors

Mathias Reinecke | CALICE meeting | March 21st, 2013 | Page 11 LED performance – old and new circuit old LED circuit new LED circuit > delay spread is much smaller (but still a few outliers), > channels of one repeater (one colour) are close together (2-3ns, 18 chns). > No pulse widening (FWHM <5ns) With new LED circuit: LED light measured with PMT H

Mathias Reinecke | CALICE meeting | March 21st, 2013 | Page 12 LED performance - new circuit LED bias spread for old circuit new circuit > LED bias spread (VCALIB settings) is reduced by new circuit. > Much better dynamic range now (SiPM saturation)! LED light measured with PMT H

Mathias Reinecke | CALICE meeting | March 21st, 2013 | Page 13 LED (tile) response for different LED charge-capacitors > 150pF ± ~20pF should be ok for new LED circuit. (150pf def., 22pF, 100pF) With new LED circuit we expect all LEDs to start radiating within this window

Mathias Reinecke | CALICE meeting | March 21st, 2013 | Page 14 SiPM termination > Is a 50  termination necessary (longest trace ~10cm)? > Increase channel gain by a higher input termination. > Can the Signal/Noise ratio be improved by decreasing the SiPM bias voltage? SPIROC2b preamplifier gain?

Mathias Reinecke | CALICE meeting | March 21st, 2013 | Page 15 SiPM termination Curves of upper plot streched and superimposed > 91  termination increases the channel gain as expected. > SPIROC preamplifier gain can be decreased. > No S/N improvement (after a first quick analysis). > Can be used for low-gain SiPMs.

Mathias Reinecke | CALICE meeting | March 21st, 2013 | Page 16 AHCAL DAQ AHCAL modules stacked up … … to a tower!! > End of May: DESY testbeam with AHCAL tower. > Current Labview/USB DAQ: only single layers possible. > Synchronous operation of multi- layer setups, combined testbeam with other CALICE detectors: new DAQ necessary. > CALICE DAQ not open for collaborators currently. => AHCAL DAQ

Mathias Reinecke | CALICE meeting | March 21st, 2013 | Page 17 AHCAL DAQ > Coorporation Uni Mainz, DESY… > LDA integration in several steps. Very similar packet structure as CALICE DAQ. > Direct integration of ScECAL and easy synchr. with SDHCAL possible. > Status: Basic features tested, flow-control scheme has been set up. > Middle/long term: switch to CALICE DAQ (better performance)! Multilayer USB adaptation: Oskar Hartbricht

Mathias Reinecke | CALICE meeting | March 21st, 2013 | Page 18 Module Production > 8 new HBU2s, in production > CIBs, CALIBs, POWERs, DIFs (NIU), in production / ordering phase > EBU horizontal (in design): > Setups (HBU2+DAQ+Labview) delivered: Mainz, Shinshu, NIU EBU vertical, finished

Mathias Reinecke | CALICE meeting | March 21st, 2013 | Page 19 Conclusions > A new LED circuit is proposed with much improved switch on time (TDC calibration) and bias spread (number of calibration runs). > Dynamic range of LED system improved. > SiPM termination with 91  does not improve the S/N. > New AHCAL (and ScECAL) DAQ under development for May testbeam (Mainz and DESY). See:

Mathias Reinecke | CALICE meeting | March 21st, 2013 | Page 20 Backup Backup Slides

Mathias Reinecke | CALICE meeting | March 21st, 2013 | Page 21 AHCAL DAQ – Flow Control

Mathias Reinecke | CALICE meeting | March 21st, 2013 | Page 22 New LED System: Single-pixel spectra and uniformity > With only one LED Bias voltage VCALIB, almost all equipped channels show SPS spectra. => Number of calibration runs reduced. Not equipped