Page 1 PCC Meeting October 25, 2007 PCC and TEPPC Coordination of Roles and Responsibilities in Regional Planning Brian Silverstein and Robert Kondziolka.

Slides:



Advertisements
Similar presentations
Capacity Building Mandate We, the participants…recognize the need to support: …A coordinated effort to involve and assist developing countries in improving.
Advertisements

WECC/TEPPC Response to DOE Funding Opportunity Status Update June 29, 2009 Bradley Nickell Renewable Integration and Planning Director.
1 Report of the Planning Coordination Committee Report to the WECC Annual Meeting April 20, 2006 Robert Jenkins, PCC Chair.
Strategic Planning Update For Board Meeting December 5, 2007.
WECC - Addressing Commercial Practices Ed Beck Chair, Market Interface Committee.
WESTERN ELECTRICITY COORDINATING COUNCIL OPERATIONS COMMITTEE June 18, 2009 Salt Lake City, UT Base Case Coordination System (BCCS) Request For Information.
WECC TRD/NERC TADS Webinar
2007 Goals. Introduction Western Electricity Coordinating Council (WECC) will be primarily defined throughout the 2007 year by Electric Reliability.
1 Report of the Planning Coordination Committee WECC Board of Directors Meeting April 21, 2006 San Diego, CA.
WECC TEPPC – March 25, 2010 Proposed Revisions to PCC Regional Planning Document 1 Proposed Revisions to Overview of Policies and Procedures for Regional.
Report of the Planning Coordination Committee WECC Board Meeting San Diego, CA April, 2009.
WV/VA issued permits Forest Service blocked line MN/WI issued permits Land owners sued AZ issued issued permit for TEP line Forest Service did not issue.
Western Electricity Coordinating Council Market Interface Committee Report to the WECC Board of Directors December 6-7, 2007 Robert D. Schwermann MIC Chair.
WECC TEPPC – March 14, 2008 PCC – TEPPC Coordination Roles & Responsibilities – RE Kondziolka 1 PCC – TEPPC Coordinating Roles and Responsibilities WECC.
California Transmission Planning Group Presentation to: WECC Transmission Expansion Planning Policy Committee June 16-17, 2010 TANC.
1 Colorado Coordinated Planning Group PCC Update March 6-7, 2008.
ActionDescription 1Decisions about planning and managing the coast are governed by general legal instruments. 2Sectoral stakeholders meet on an ad hoc.
1 Bradley Nickell Director of Transmission Planning 10-Year Regional Transmission Plan WECC Overview September 2011.
WECC Planning Coordinating Committee Brian K. Keel Chair – Reliability Subcommittee June, 2010 WECC Reliability Subcommittee Report.
Brett Wangen, Director of Engineering WECC RC Update to PCC Planning Coordination Committee Meeting October 24, 2013.
TransWest Express and Gateway South WECC Planning Coordination Committee David Smith, National Grid October 25-26, 2007 Vancouver, B.C.
Interim Guidance on the Application of Travel and Land Use Forecasting in NEPA Statewide Travel Demand Modeling Committee October 14, 2010.
Mission Statement Trans-Elect, with the support of AES, is committed to expanding America’s electric transmission grid in the furtherance of public policy,
The Big Picture Discussion with the Wyoming Infrastructure Authority and Joint Minerals Committee Steve Ellenbecker Wyoming Infrastructure Authority.
CREPC Meeting November 5-6, 2007 Snapshot of Major Transmission Proposals and Status of Transmission Planning Presenters: Paul Arnold and Jeff Miller.
RESOLVE, Inc. National Geothermal Collaborative An Overview January 20, 2004.
1 May 8, 2006 Briefing to Northwest Congressional Delegation Staff.
Montana Energy Summit Transmission Planning Process April 22, 2008.
Energy Issues in Peru and the Andes: Environmental and Social Aspects George Washington University January 28, 2005 Dr. Robert H. Montgomery Head, Environmental.
Charles Hosken, General Manager Imperial Irrigation District
Rocky Mountain Area Transmission Study Connecting the Region Today for the Energy Needs of the Future Rocky Mountain Area Transmission Study Recommendations.
Transmission Expansion in the Western U.S. Transmission Policy, Incentives, and Expansions in the Western States Marcus Wood Stoel Rives LLP 900 SW Fifth.
5/23/08ACC 5 th BTA Workshop – Phoenix - SWAT – RE Kondziolka 1 SWAT Subregional Planning Group Update Arizona Corporation Commission Fifth Biennial Transmission.
Successful Transmission Planning & Development in the West Kelly Barr Manager, Regulatory Affairs & Contracts Salt River Project Phoenix, Arizona June.
JJ Jamieson MIC Chair MIC Report for ISAS August 2014 Salt Lake City.
WestConnect Activities Charles Reinhold WestConnect Project Manager 2008 ACC BTA Workshop Phoenix, AZ May 22, 2008.
Joint Outreach Team Implementation Plan July 12, :30-11:30 a.m.
COMMON USE SYSTEM March 5, 2008 Black Hills Power Service Center Rapid City, SD TRANSMISSION COORDINATION AND PLANNING COMMITTEE.
JJ Jamieson MIC Chair JGC update September 2014 Salt Lake City.
R E T I Coordinating Committee California’s Renewable Energy Transmission Initiative: Status Update California Public Utilities Commission California Energy.
Business Analysis. Business Analysis Concepts Enterprise Analysis ► Identify business opportunities ► Understand the business strategy ► Identify Business.
Section 4.9 Review Report Request for MAC Approval December 1, 2015.
Bob Cupit Manager, Energy Facility Permitting Minnesota Public Utilities Commission.
Renewable Energy Transmission Initiative 2.0 Organizational Structure and Work Plan California Energy Commission and California Public Utilities Commission.
Western Planning Regions Discussion Needs/Expectations Relative to TEPPC TEPPC Review Task Force Meeting January 11, /8/20161.
© 2000 PACIFICORP kV LINE WALLA WALLA – WALLULA – Mc NARY 500 kV LINE HEMINGWAY – CAPTAIN JACK – REGIONAL PLANNING MEETING REGIONAL PLANNING PROJECT.
RPCG – 2026 CCTA Results and Next Steps Colby Johnson & Vijay Satyal W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
BC Coordinated Planning Group Development of BCCPG Charter Steering Committee Meeting – Conference Call Friday, May 27, – 2:30pm.
Future Expectations of TEPPC: Products, Users, and Values Maury Galbraith Presentation to TEPPC Review Task Force January 11,
Steve Rueckert Director of Standards TPL Discussion – PCC Steering Committee March 25, 2014.
MEKONG RIVER COMMISSION PROGRAMMES FOR SUSTAINABLE DEVELOPMENT.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
Multistate Research Program Roles & Responsibilities Eric Young SAAESD Meeting Corpus Christi, TX April 3-6, 2005.
Long Term Transmission Integration Planning at the California ISO Intermittency Analysis Project (IAP) Energy Commission Staff Workshop February 13, 2007.
TEPPC Review Task Force January 11, Purpose Advise and make recommendations on Future potential future generation and load balance Adequacy of the.
BPA Pacific DC Intertie (PDCI) Upgrade Project WECC Path Rating Process PDCI 3220 MW North to South Phase 1 Kick-off Meeting October 23, :00-4:00.
CREPC/WIRAB Meeting April 27, 2016 Salt Lake City, UT Thomas Carr Western Interstate Energy Board Evolution of Grid Planning in the West.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
Northern Tier Transmission Group Report to Columbia Grid Planning Committee February 9, 2012 “To ensure efficient, effective, coordinated use & expansion.
RAC Implementation Status
EIA approval process, Management plan and Monitoring
Reliability Assessment Committee Proposal TSS Meeting
Nick Hatton Associate Engineer March 9, 2017
SEARUC Conference Little Rock, AR June 4, 2007
Reliability Assessment Committee
MAC Board Effectiveness Survey
RAC Implementation Status
Request for MAC Approval December 1, 2015
MAC Board Effectiveness Survey
MAC Input on Section 4.9 Review
Presentation transcript:

Page 1 PCC Meeting October 25, 2007 PCC and TEPPC Coordination of Roles and Responsibilities in Regional Planning Brian Silverstein and Robert Kondziolka

Page 2 PCC Meeting October 25, 2007 Meet Transmission Providers FERC Order 890 Planning Requirements Address concerns of transmission developers Address original TEPPC formation issues Clearly delineate PCC and TEPPC responsibilities and coordination interfaces Address the best way to manage the processes Reason To Address

Page 3 PCC Meeting October 25, 2007 Transmission Projects and Path Rating Increases Under Consideration Palo Verde–Devers II Green Path Project IV-San Felipe Indian Hills - Upland Sunrise Powerlink En-ti (Ely-Harry Allen) Harry Allen- Robinson Summit Montana Alberta Tie Line Frontier Project Northern Lights West Coast Cable BC- Northern California Transmission Juan de Fuca Cable Path 66 Path 26 Path 75 Path 54 Path 27 Paths 46 & 49 White Pine-Midpoint Path 36 Lake Elsinore Advanced PSP Trans-West Express Project Navajo Transmission Project Segment 1 Miracle Mile-Ault SunZia High Plain Express Colorado-New Mexico Interconnection Project TOT3 Expansion Project Eastern Plains Mountain States PacifiCorp Xsm Source: Robert Jenkins, June 2007

Page 4 PCC Meeting October 25, 2007 WECC Regional Planning Process Sequence StagesNeedsFormation Technical Studies LicensingConstruction Screening Studies SynchronizedStudyPlan ProjectPlanningReview Project Path Rating Review ProgressReports Regional Planning Guidelines Assessment Regional Planning Guidelines Assessment Phase 1 Phase 1 Proposed Rating Phase 2 Phase 2 Planned Rating Phase 3 Phase 3 Accepted Rating Annual Reports Required Throughout Planning Process Annual Reports Required Throughout Planning Process Column Heading Notes: Needs = Examination of potential long-term transmission needs. Formation = Development of proposals of specific project proposals by sponsors. Technical Studies = Power flow and dynamic stability studies. Licensing = Project sponsor activities to obtain rights-of-way, certificates of purpose and necessity, etc. Construction= Building of foundations, towers, conductor, substations, etc. Presented by Steve Walton at FERC Order 890 Technical Conference on Attachment K in Denver on October 23, 2007

Page 5 PCC Meeting October 25, 2007 January 17, 2006 White Paper Communication links should also be formed between TEPPC and L&R Subcommittee to avoid possible duplication of effort and to avoid divergent models and assumptions. TEPPC should focus on economic screening studies for resource and transmission expansion alternatives that have broad, regional implications. PCC should address issues from project inception to in-service.

Page 6 PCC Meeting October 25, 2007 January 17, 2006 White Paper Consideration should be given to integrating the TEPPC process and WECC current regional planning process. This would involve moving the oversight of the Regional Planning Project Review phase of the PCC process over to TEPPC to avoid duplication.

Page 7 PCC Meeting October 25, 2007 Provide guidance and leadership to the expansion planning process and ensure that the process is conducted in an open stakeholder forum, is impartial, transparent, properly executed and well communicated. Ensure that appropriate regional experts and stakeholders participate in the expansion planning process. Identify, develop and seek consensus on a process for high-level coordination of economic transmission expansion planning in the West, and successfully implement this process. TEPPC Function 2 Objectives

Page 8 PCC Meeting October 25, 2007 Ensure development and maintenance of a catalog of potential transmission projects that span multiple states, provinces or sub-regions in the Western Interconnection that may be, on a screening study basis, economically viable and may merit further consideration by sub-regional groups, policy makers and the WECC members. Ensure the analysis of demand-side resources and other non-wires solutions to congestion problems is represented along with the analysis of transmission solutions. TEPPC Function 3 Objectives

Page 9 PCC Meeting October 25, 2007 PCC Regional Planning Guidelines 1. Take multiple project needs and plans into account, including identified utilities' and nonutilities future needs, environmental and other stakeholder interests; 2. Cooperate with others to look beyond specific end points of the sponsors' project to identify broader regional and subregional needs or opportunities; 3. Address the efficient use of transmission corridors (e.g., rights-of- ways, new projects, optimal line voltage, upgrades, etc.); 4. Identify and show how the project improves efficient use of, or impacts existing and planned resources of the region (e.g., benefits and impacts, transmission constraint mitigation); 5. Cooperate with Regional Planning Review Group members in determining the benefits and impacts due to the project; 6. Identify transmission physical and operational constraints resulting from the project or that are removed by the project;

Page 10 PCC Meeting October 25, 2007 PCC Regional Planning Guidelines 7. Coordinate project plans with and seek input from all interested members, subregional planning groups, power pools, and region-wide planning group(s); 8. Coordinate project plans with and seek input from other stakeholders including utilities, independent power producers, environmental and land use groups, regulators, and other stakeholders that may have an interest; 9. Review the possibility of using the existing system, upgrades or reasonable alternatives to the project to meet the need (including non-transmission alternatives where appropriate); 10. Indicate that the sponsors evaluation of the project has takent into account costs and benefits of the project compared with reasonable alternatives; 11. Coordinate with potentially parallel or competing projects and consolidate projects where practicable.

Page 11 PCC Meeting October 25, 2007 Identify coordination and handoff issues between TEPPC and PCC. Modify the document to include the TEPPC role so the process describes a single integrated process of Regional Planning including sub-regional planning activity. Ensure that the Regional Planning Guidelines are followed and review is completed in a timely manner. Evaluate whether the Project Planning Review activity would fit better under TEPPCs administration or whether it should remain with PCC. This will be addressed in the Strategic Planning process. Modify the existing Regional Planning document (Project Planning Review) to include the TEPPC role RECOMMENDATION