Order 2004 Sensitive 1 WECC Phase 1 Rating Process Coordinated Planning and Technical Studies: PCC Presentation on the Avista Interconnection to the PG&E.

Slides:



Advertisements
Similar presentations
Planning For The Future Idaho Powers 2006 Integrated Resource Plan.
Advertisements

West of McNary Generation Integration Project
Sierra Subregional Planning Group 10-year Transmission Plan
Summary of Second Draft of the NERC Standard PRC Disturbance Monitoring and Reporting JSIS Meeting August 10, 2010 Salt Lake City, UT.
Central California Clean Energy Transmission Project
Central California Clean Energy Transmission Project PCC Meeting Vancouver, BC October 24, 2007.
1 Report of the Planning Coordination Committee Report to the WECC Annual Meeting April 20, 2006 Robert Jenkins, PCC Chair.
NTTG Report to TEPPC BiennialTransmission Plan.
WECC TRD/NERC TADS Webinar
Report of the Planning Coordination Committee WECC Board Meeting San Diego, CA April, 2009.
1 ColumbiaGrid Update June 27, Activities Planning OASIS Redispatch 2.
ACE Diversity Interchange (ADI)
ColumbiaGrid Update WECC PPC June 11, Biennial Plan Update Approved by the ColumbiaGrid Board of Directors on February 17, 2010.
Heidi Pacini Staff Engineer Developing a Draft 2011 Study Program March 10, 2010 SWG Conference Call.
Doug Tucker Associate Staff Engineer TRD/TADS update and Future reporting.
TransWest Express and Gateway South WECC Planning Coordination Committee David Smith, National Grid October 25-26, 2007 Vancouver, B.C.
1 WECC Regional Planning Study British Columbia – Northern California Presentation to PCC Jim Filippi, PG&E 10/26/2006.
Designation Process (EB ) and East-West Tie Line (EB ) March 23, 2012.
Mission Statement Trans-Elect, with the support of AES, is committed to expanding America’s electric transmission grid in the furtherance of public policy,
Study Committee Representatives Annual Report December, 2012
New England’s Regional Renewable Resource Development Efforts New England States Committee on Electricity November 3, 2011.
CREPC Meeting November 5-6, 2007 Snapshot of Major Transmission Proposals and Status of Transmission Planning Presenters: Paul Arnold and Jeff Miller.
Order 2004 Sensitive 1 WECC Phase 1 Rating Process Coordinated Planning and Technical Studies July 18, 2008 Portland Oregon.
Public Service Company of New Mexico
NTTG Economic Study and Biennial Study Update NTTG Economic Study and Biennial Study Update NTTG Study Cycle.
A review of offshore wind power grid connection options in the Bothnian Bay Offshore grids for wind power integration Sisu Niskanen VTT Technical Research.
WECC PCC Meeting Salt Lake City, UT March 26, 2014.
NWPP MC Initiative WECC Update March 25th, 2015 Kathy Anderson
Interconnection of Distributed Generation
Lunch & Learn Project Presents to you: “The Electric Power Grid” By: Dexter Hypolite Electrical Engineer VIWAPA.
North American Strategic Infrastructure Leadership Forum October 12, 2011.
IMPERIAL VALLEY CONFERENCE July 21, SOLICITATION RENEWABLES PORTFOLIO STANDARD.
Visibility 10/1/ Agenda Visibility Overview Status –WECC –ColumbiaGrid Issues Preliminary Thoughts Regarding Conclusions and Recommendations Next.
Sea Breeze Pacific Regional Transmission System Juan de Fuca Cable & West Coast Cable Keys to West Coast Transmission Progress.
Montana Ambassadors Helena, Montana February 25, 2011.
Energy Gateway Gateway West Project Gateway South Project
Order 2004 Sensitive 1 Transmission Project Sponsors Big Tent Meeting November 19, 2008 Portland, Oregon Welcome Darrell Gerrard - PacifiCorp.
Grizzly-Summer Lake 500 kV Line Planned Outage May 27-June hours Mike Viles – BPA Transmission Operations Technical Management Team June.
ISO Grid Planning Presentation to CREPC October 1, 2002
Increasing Access to the Grid NIPPC September 8, 2005 Brian Silverstein VP, Operations and Planning Bonneville Power Administration.
PJM© PJM Confidential PJM Generation Interconnection Overview Virginia Offshore Wind Conference Virginia Beach June 22, 2011 Paul McGlynn General.
Northern California to Pacific Northwest/Canada Transmission Line Steve Metague, PG&E February 29, 2008.
Approach to the Wind Resource Assessment for the Sixth Power Plan Northwest Power & Conservation Council Generating Resources Advisory Committee August.
Past Studies and Resource Diversity Western Renewable Energy Zones, a joint initiative of the Western Governor’s Association and the U.S. Department.
Successful Transmission Planning & Development in the West Kelly Barr Manager, Regulatory Affairs & Contracts Salt River Project Phoenix, Arizona June.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
Puget Sound Energy Columbia Grid Presentation June 19, 2007 John Phillips.
Energy Gateway Update for Wyoming Infrastructure Authority January 27, 2009 Darrell Gerrard Vice President Transmission System Planning.
Order 2004 Sensitive 1 WECC Phase 1 Rating Process Coordinated Planning and Technical Studies January 24, 2008 Portland Oregon.
Renewables Integration Development Project North West of the Island of Ireland Louis Fisher, EirGrid.
MISO Northwest Exploratory Study Presented to National Wind Coordinating Committee Participants in study – MISO, Various utilities in Minnesota, North.
Southwest Renewable Energy Transmission Conference May 21, 2010 This report contains transmission planning data that may be conceptual in nature and is.
© 2000 PACIFICORP kV LINE WALLA WALLA – WALLULA – Mc NARY 500 kV LINE HEMINGWAY – CAPTAIN JACK – REGIONAL PLANNING MEETING REGIONAL PLANNING PROJECT.
RPCG – 2026 CCTA Results and Next Steps Colby Johnson & Vijay Satyal W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Puget Sound Energy Columbia Grid Presentation August 15, 2007 John Phillips.
Transmission Capital Project Updates. Transmission Expansion Plan Sigurd to Red Butte 345 kV line in-service May, 2015 Permitting activities continue.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
Biennial Transmission Plan Studies Update - DRAFT April 6, 2011.
Northern Tier Transmission Group Report to Columbia Grid Planning Committee February 9, 2012 “To ensure efficient, effective, coordinated use & expansion.
Visibility Ramu Ramanathan 10/1/2007.
EI-WECC Seams Study Needed
Kenneth Silver Los Angeles Department of Water & Power
Transmission Planning Update October 20, 2010
Local Transmission Planning Process: Local Transmission Plan Update Meeting December 15, 2016.
Transmission and Sub-Transmission Network India – Present and Future Rajesh Suri GE (T&D) India Ltd 8 November 2018.
SunZia Project Description
ColumbiaGrid Planning Meeting FERC Order 1000 Activities June 7, 2018
Planning Committee- Map
PacifiCorp Overview Choose from three different title slide designs by selecting “New Slide.” These slides are suitable for business and community presentations.
Presentation transcript:

Order 2004 Sensitive 1 WECC Phase 1 Rating Process Coordinated Planning and Technical Studies: PCC Presentation on the Avista Interconnection to the PG&E Canada – California Project Scott Waples AvistaCorp March 7, 2008 Albuquerque New Mexico

New Transmission Projects Converging at Boardman Planned Operation: 2010 – 2015 Selkirk Sub Devils Gap and / or Spokane Converter Boardman Hub Idaho Power Single 500kV AC PacifiCorp Gateway West Single 500kV AC PG&E, et. al CNC Project Bi Pole HVDC PGE Southern Crossing Single 500kV AC PG&E et. al CNC Project Double 500kV AC BPA West of McNary Generation Integration Project Midpoint Capt. Jack Hemingway Bora h PacifiCorp/Idaho Gateway West Double 500kV AC PacifiCorp Walla 230kV AC To Tesla McNary Big Eddy BPA I-5 Corridor Station X Station Z NorthernLights DC To Edmonton/Heartland Legend: PG&E (AC or DC) PacifiCorp (500 or 230kV) PGE (500kV) Idaho Power (500kV) Avista Corp (500/230kV) BPA (500 kV)

3 Project Overview Conceptual Major Project Elements HVAC from Selkirk to either Boardman area or Grizzly/Round Butte are via Spokane area sub HVDC from either Boardman area or Grizzly/Round Butte area to Tesla/Tracy HVDC converter stations in the Round Butte/Grizzly area and Tesla/Tracy and potentially in the Round Mountain area Potential Bidirectional rating: 3000 MW Project Operating Date: late 2015 Project Website: AC DC

4 Canada to Northern California - Avista Interconnection(s)

5 Project Overview Major Project Elements: 500/230 kV interconnection at Devils Gap 230 kV Phase Shifting Transformers kV interconnections to the Spokane Area 230 kV Grid Potential Bidirectional rating: 500 MW Project Operating Date: 2015 Devils Gap kV PG&E-CAN 500 kV Line Beacon kV Sunset kV Major Highways Existing 230 kV Proposed 230 kV Existing 115 kV Westside kV

6 Project Overview; Walla Walla to McNary/Boardman Conceptual Major Project Elements: Single 230 kV circuit from Walla Walla Washington to McNary/Boardman Oregon with a tie to Wallula Substation Potential bidirectional rating: 400 MW Proposed Project Operating Date: 2011

7 Objectives and Resources The Avista interconnection to the PG&E Canada to Northern California 500 kV Project will provide up to 500 MW of access to the Main Stem Project from the Avista transmission system for renewable resources in the Avista service territory. A connection to Walla Walla and then on to the Boardman Hub would increase that capability. These interconnections will allow Avista access to other renewable resources in the Northwest as well as in Canada. The projects may also allow Avista to integrate some of its existing thermal resources to its loads over its own transmission, and may allow for additional imports of economy energy into the Avista system. Potential resources are wind resources located in various locations on the Avista system, including but not limited to wind farms near Spokane, Othello, Lewiston, and Clarkston Washington, as well as Grangeville, Idaho. Avista presently has 11 interconnection requests pending, with up to three additional that may soon be in the queue.

8 Background, Study Work, and Future Meetings: Avista has announced a Regional Planning Process that will run concurrently with a WECC Phase I Rating Process. The letter announcing these processes went to the WECC Committees and other stakeholders in the fourth quarter of Preliminary studies that have been run on the northern project indicate that a 500/230 kV interconnection at Devils Gap with the associated 230 kV construction is feasible. The studies further indicate that a phase shift angle of plus 20 degrees to minus 40 degrees will be sufficient to satisfy the goal of a bi-directional rating of 500 MW. No studies have yet been done on the southern project, but should soon be in the works. A kickoff meeting in Spokane for the above WECC Processes was held on February 29 th, Stay Tuned for more!

9