Composite Load Model Implementation Update

Slides:



Advertisements
Similar presentations
You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Advertisements

2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Balloting/Handling Negative Votes September 11, 2006 ASTM Training Session Bob Morgan Brynn Iwanowski.
UNITED NATIONS Shipment Details Report – January 2006.
WECC Board of Directors April 21-23, 2004 Seattle, Washington WECC Procedure for Reporting of System Events Disturbance Reports Rod Maslowski OC Vice Chairperson.
Summary of Second Draft of the NERC Standard PRC Disturbance Monitoring and Reporting JSIS Meeting August 10, 2010 Salt Lake City, UT.
NERC TPL Standard Issues TSS Meeting #146 Seattle, WA August 15-17, 2007 Chifong Thomas.
1 TSS Report PCC Meeting Salt Lake City, UT October 26-27, 2006.
Composite Load Model Implementation Update Craig Quist, PacifiCorp April 25-27, 2012 TSS Meeting.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Scope of Work Approval January 25, 2013 Joe Seabrook Puget Sound Energy.
Composite Load Model Implementation Update Craig Quist, PacifiCorp January 23-25, 2013 TSS Meeting.
Use of Node-Breaker Model in POM Suite/ROSE Software
WECC System Performance Criteria 1st Team Meeting Background
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) May 15, 2013 Joe Seabrook Puget Sound Energy.
Market Interface Committee Recent Regulatory Activities Philip Tice October 14, 2011.
FIGURE 3.1 System for illustrating Boolean applications to control.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Demand Resource Operable Capacity Analysis – Assumptions for FCA 5.
System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011.
EE 369 POWER SYSTEM ANALYSIS

S-Curves & the Zero Bug Bounce:
Beckett Energy Systems
1 Overview. 2 Benefits of RATC Applications Real-time corrective Hour ahead corrective and preventive Day ahead corrective Day ahead market/economic based.
EE369 POWER SYSTEM ANALYSIS
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee March 2014.
1 Review of AC Circuits Smith College, EGR 325 March 27, 2006.
Jerry Rust Chair - Underfrequency Load Shedding Criterion Team
Enoch Davies Associate Engineer Composite Load Model Implementation January 19, 2012 Salt Lake City, UT.
Marv Landauer Report to TSS on Annual Study Program Report Review Task Force April 2012 TSS Meeting Salt Lake City.
Reading a GE PSLF *.epc into PWS
SRWG Activity Report (as presented) March 21-23, 2012 TSS Meeting #160 WECC Offices Salt Lake City, Utah Mark Graham, SRWG Chair/David Franklin TSS.
FAFSA on the Web Preview Presentation December 2013.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
Executional Architecture
1 Overview of Testing Methodology Obtain generic Test Scripts Populate Self Testing Work Paper Template Prepare actual test scripts Determine sample Combine.
BAL-001-TRE-1 Primary Frequency Response Update for Texas RE RSC
Addition 1’s to 20.
25 seconds left…...
Week 1.
Types of selection structures
Copyright © 2013 Pearson Education, Inc. All rights reserved Chapter 11 Simple Linear Regression.
Underfrequency Load Shedding Assessment Report Kent Bolton January 30, 2014 JGC Meeting SLC, UT.
Lecture 2 Complex Power, Reactive Compensation, Three Phase Dr. Youssef A. Mobarak Department of Electrical Engineering EE 351 POWER SYSTEM ANALYSIS.
Announcements Be reading Chapters 9 and 10 HW 8 is due now.
ERCOT VRT Study, Phase I ERCOT ROS Meeting December 10, 2009.
User Experience with New Solar PV Models California ISO
1 Cheng-Ting Hsu Chao-Shun Chen Islanding Operations for the Distribution Systems with Dispersed Generation Systems Department of Electrical Engineering.
WECC Load Model Sensitivity Study “ An Analysis of the Sensitivity of WECC Grid Planning Models to Assumptions Regarding the Composition of Loads ” Task.
Application and Implementation of State Estimator at Idaho Power Company S. Kincic and M. Papic.
Stability Analysis on WECC Systems with Wind Penetration and Composite Load Model Introduction The growing complexity of generation and load pattern in.
WECC-0100 Scope, Content & Status Update Rikin Shah, PAC Orlando Ciniglio, IPC WECC TSS Meeting, Salt Lake City, UT January ,
OPSTF – Issue 7 Long-term unavailability of autotransformers.
NERC LMTF: Current Activities Ryan Quint, PhD, PE Staff Coordinator, NERC Load Modeling Task Force WECC MVWG Meeting June 2016.
PowerWorld Case Validation
Modeling DER in Transmission Planning CAISO Experience
WECC Load Modeling and Validation Group Meeting
Slaven Kincic SMVTF Progress Report
Next Steps in Load Modeling
CMPLDWG Composite Model with Distributed Generation Approval
CMPLDWG Composite Model with Distributed Generation Approval
WECC Load Modeling and Validation Group Meeting
User Experience with New Solar PV Models California ISO
Palo Verde-COI RAS Retirement
Palo Verde-COI RAS Retirement
Presentation transcript:

Composite Load Model Implementation Update Craig Quist/Rikin Shah, PacifiCorp May 15-17, 2013 TSS Meeting

Composite Load Model – Status Update… Following the last TSS meeting (January 2013) a request was submitted to members to reevaluate the composite load model using an updated load model representation. Responses from 11 (additional) entities were received by 4/11/2013 (due 3/29/2013) Responses received fit into 12 performance categories and two software/ data reevaluation categories, as noted in the table below: Composite Load Model - status update meeting w/M&VWG held on 3/26-28/2013 A summary of responses received is noted on the following pages:

Composite Load Model – Status Update… Arizona Public Service (APS): Analysis was performed on six different transmission paths (50, 22, 23, 51, PV East, 49) After five seconds, the frequency traces were noticeably different. From the results seen in this phase I assessment, the composite model’s performance is equal to or slightly better than the performance of the interim load model. At this time, we would recommend using the phase I model as opposed to the interim model.

Composite Load Model – Status Update… California Independent System Operator (CAISO): Loss of load is observed during 3-phase faults Post-transient voltage recovers to higher voltage Generators may go out-of-step Some small generators may go out of step because of under excitation SPS Modeling Considerations For contingencies that have SPS involving load tripping, switch files should be changed considering that the loads are moved to low voltages and distribution feeders are added. Reliability Criteria Violations An example may be Malin-Round Mountain 500 kV single line outage. With the composite load model, there were frequency criteria violations on several buses in Northwest.

Composite Load Model – Status Update… Chelan County Public Utilities District (CHPD): For the majority of the faults simulated, there was no significant difference between the two models. (This may be due to the dynamics of the generation having a much greater influence on our system than load.) While not one of the requested performance attributes, system angle was another factor that notably changed. While, several contingencies known for causing voltage issues were specifically chosen and run; in two of the instances the composite load model recovered to a higher voltage; while in a third instance, the composite load model failed to converge.

Composite Load Model – Status Update… El Paso Electric (EPE): Alamogpg 69 kV bus voltage The Arroyo 115 kV bus is taken as the benchmark bus representative of what would occur at all key EPE buses during an EPE Westmesa‐Arroyo 345 kV line (“EP line”) contingency. There were no voltage or frequency violations for the Arroyo 115 kV bus. However, there were some voltage violations and other unknown frequency excursions and unusual voltage recovery for the (TSGT) Alamogpg 69 kV bus. Results have been forwarded to Tri-State G&T.

Composite Load Model – Status Update… Nevada Energy (NVE): NV Energy used all three dyds for comparison, the 12hs4 composite load dyd, a 20% motorw dyd and a 50% motor w dyd. The voltage recovery in the 50% motorw dyd was similar to the voltage recovery using the composite load dyd. However, underfrequency load shedding was not correct per the incompatibility of the motorw models and the lsdt9 relays. NV Energy likes the performance of the composite load models and believes that their inclusion will be a needed improvement to transient stability studies. NV Energy is confident that the performance will be correct and that the only issues at this time for Area 18 and Area 64 are incomplete channel reporting. NV Energy would like some assistance in developing a winter peaking commercial/industrial residential load that represents a ski area load. *ASSISTANCE REQUEST*

Composite Load Model – Status Update… NorthWestern Energy (NWE): PSS/E composite load models not available Black Hills Corporation

Composite Load Model – Status Update… Portland General Electric (PGE): Post transient voltage recovery at PGE load buses was observed to recover at a higher voltage for some studied outages and at a lower voltage than the interim model for others, and Delayed frequency recovery was also observed at various buses for some outages. Typically the composite load model has a more exaggerated response than results seen using the interim model this is expected due to the higher power draw during the fault and initial motor tripping immediately after clearing. We believe there could be a potential Reliability Criteria violations using the new model so we would recommend that Phase I be recommended as is and that Reliability Sub-committee precede with its own evaluation of the performance requirements, and consider loosening the performance criteria for frequency recovery times.

Composite Load Model – Status Update… Sacramento Municipal Utility District (SMUD): Rancho Seco – Bellota double line outage results in an unexpected higher overall frequency in the WECC system which settled at 60.0214 Hz. This maybe the result of tripping off some of the motor load components on the composite load model The composite load model study results show lower voltage during fault (due to larger power draw), higher and faster initial recovery and higher post-transient voltages (1.02 pu - see attached plot).

Composite Load Model – Status Update… Salt River Project (SRP): Composite Load Modeling evaluated Path 54 at its rated value. SRP found significant issues and does not recommend implementation of “Phase I” Composite Load Model while the issue of WECC Criteria from TPL-001-WECC-RBP-2 is not resolved.

Composite Load Model – Status Update… PacifiCorp (PAC): Additional analysis was performed to compare the composite load model implementation in the PTI PSS/E vs. GE PSLF software packages. Utilizing a three bus test case, analysis focused on two scenarios: No fault @60 cycles, no fault – open line 101-102 #1 and line 101-103 #1 @20 seconds, terminate the simulation Three-phase faulted lines @60 cycles, 3-phase fault on GEN115 bus 101 @65 cycles, clear the fault with loss of line 101-102 #1 and line 101-103 #1

PacifiCorp – PSS/E vs PSLF (Scenario: No Disturbance)

PacifiCorp – PSS/E vs PSLF (Scenario: No Disturbance)

PacifiCorp – PSS/E vs PSLF (Scenario: Three-Phase Fault)

PacifiCorp – PSS/E vs PSLF (Scenario: Three-Phase Fault)

Shifting Gears… Transition from: Composite Load Model discussion to: PSLF-PSS/E Software Implementation Issue Discussion

PSLF – PSSE Conversion Status Update Bill Hall currently working on Conversion to PSSE V33 Lot of issues with wind turbine models. Issues with GE wind turbine models as well as the generic wind WT3 models. Currently working on resolving these issues. Able to initialize after gnetting all the wind generation. Functionality differences also causing the solution to change in the two different platforms. Hopefully will have the conversion completed in a month.

Recommendations PTI Users need to evaluate the Composite Load Model (CLM) Use PSSE Ver 32 “12HS” case available on WECC website. Limit the CLM to only a few buses in their system. Need to provide input on their evaluation. Present the results of the PTI evaluations to TSS. Recommend to RS the changes to the criteria for their evaluation. Entities believe that the criteria needs to be re-evaluated and changed before the CLM can be implemented in the WECC base cases. Changes to the TPL standards might be necessary Update the RC on the implementation. Finally implement the CLM throughout the system.