Development of CAISO / PacifiCorp Energy Imbalance Market Briefing on Design Straw Proposal and Issue Paper Presentation to WECC Seams Issues & Market.

Slides:



Advertisements
Similar presentations
T&D Losses Reflecting Losses in DR within ERCOT August 22, 2012.
Advertisements

NERC Policies Introduction
MISO Day 2: A Transmission Users (Marketers) Perspective Leon White August 8, 2007.
Business Practices Subcommittee Update August 17, 2010.
NAESB Coordinate Interchange Version 1 Standard Revision 1, Draft 5 August, 2005.
NAESB Coordinate Interchange
Unscheduled Flow Administrative Subcommittee Report Robin Chung October 24, 2013 Anaheim, CA.
Definition of Firm Energy and Interruptible Transmission Two Issues Causing Problems for Business in the Western Interconnection.
Briefing on California ISO Dynamic Transfers Stakeholder Process For WECC Seams Issues Subcommittee Meeting May 4, 2010 Jim Price, Lead Engineering Specialist.
NAESB Coordinate Interchange Standard, Version 1 / 0
Overview Seams Coordination Process. 2 Introduction Midwest ISO Non-profit organization that manages the reliable flow of electricity across much of the.
Development of CAISO / PacifiCorp Energy Imbalance Market Briefing on CAISO Straw Proposal & Benefit Study Presentation to WECC Market Interface Committee,
1 RTO West Update & Stage 2 Filing Overview WECC Board of Directors June 5,2002 Portland,OR RTO WEST Frank Afranji.
Intra Hour Tagging/Oasis During System Contingencies The transmission tagging process was initially developed to solve an after the fact accounting issue.
Update on CAISO / PacifiCorp Energy Imbalance Market
1 ITU Interconnection Workshop 17 August 2001 Role of the Regulator K S Wong Office of the Telecommunications Authority Hong Kong, China.
Gas-Electric Coordination Update JGC Meeting August 23-24, 2012.
FERC Order minute Scheduling.
EMS Checklist (ISO model)
Chapter 5 – Enterprise Analysis
Standard Market Design (SMD) in New England Federal Energy Regulation Commission Conference on Standard Market Design January 22, 2002 David LaPlante Vice.
Overview of CAISO Stakeholder Process for FERC Order 764 Compliance Implementation of 15 minute scheduling and settlement Jim Price, CAISO Presentation.
AN INTRODUCTION TO THE MIDWEST ISO By Bill Malcolm Manager-State Regulatory Affairs Pierre, South Dakota June 9, 2006.
Summary of Proposed Market Rules For Transition Period Price-Responsive Demand and Active Demand Resources in the Forward Capacity Market Henry Yoshimura,
FEBRUARY 14, 2013 RELIABILITY COMMITTEE MEETING Steve Weaver SYSTEM OPERATIONS In-Day Reserves & Supplemental Procurement.
SAS 70 Third Party Report on Controls Overview and Timetable Finance / Audit Committee Meeting Austin, Texas January 14, 2003/ February 18, 2003.
Enhanced Curtailment Calculator (ECC) Task Force Joint Guidance Committee Presentation and Motion to the OC & MIC Standing Committee Meetings March 27-29,
Briefing on CAISO / PacifiCorp Energy Imbalance Market Presentation to WECC Unscheduled Flow Administrative Subcommittee January 8, 2014 Jim Price, Senior.
CAISO-PacifiCorp EIM Update WECC Scheduler’s Meeting
Update on CAISO / PacifiCorp Energy Imbalance Market Presentation to WECC Market Interface Committee March 25, 2014 Jim Price, Senior Advisor, Market Development.
The Northwest Power Pool Members’ Market Assessment and Coordination Committee (MC) Initiative Dan Williams Portland General Electric NWPP MC Phase 2 Policy.
Page 1 of 43 To the ETS – Bidding Query by Map Online Training Course Welcome This training module provides the procedures for using Query by Map for a.
Internal Control–Integrated Framework
03/11/2013 MARKETS COMMITTEE Aleks Mitreski MARKET DEVELOPMENT (413) Overview of Market Rule revisions.
Winter 2013/2014 Reliability Solution Including LNG MWHs N. Jonathan Peress Conservation Law Foundation Greg Lander Skipping Stone NEPOOL Markets & Reliability.
IMPACT TO FREQUENCY CONTROL DURING STARTUP AND SHUT DOWN OF UNITS
Congestion Management Settlement Credits December, 2002.
JANUARY 14-15, 2014 | NEPOOL MARKETS COMMITTEE Matthew Brewster MARKET DEVELOPMENT | Conceptual design.
OCTOBER 8, 2014 Bob Laurita INTERNAL MARKET MONITORING New Import Capacity Resource FCM Market Power Mitigation Order to Show Cause Compliance Filing.
Convergence Bidding Overview Margaret Miller Manager, Market Design & Regulatory Policy CPUC Convergence Bidding Workshop August 26, 2010.
PacifiCorp-CAISO EIM Initiative Overview
1 The Midwest ISO At the Crossroads of America International Meeting of Very Large Power Grid Operators October 24 & 25, 2005 Beijing, China.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
Presentation to WECC Market Interface Committee March 24, 2015
NV Energy Energy Imbalance Market (EIM) Presentation to ISAS
Overview of LMP Markets Features of ISOs / RTOs David Withrow Senior Market Economist Fall 2007 Meeting of the NARUC Staff Subcommittee on Accounting and.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
PacifiCorp Participation in the California ISO. 2 Full participation provides significant benefits beyond those of the Energy Imbalance Market EIM BenefitsFull.
Welcome New York Independent System Operator. (Pre-NYISO) Regulated Market Physical contracts Regulated industry Cost Based System Two Party Deals Bundled.
2013 Calendar Year Customer Survey Results
Bulk Power Transmission System
IWWG Annual Conference Wind Management at MISO July 22, 2011.
Update on Energy Imbalance Market Presentation to WECC Market Interface Committee October 15, 2015 Jim Price, Senior Advisor, Market Development & Analysis,
January 14, 2016 PacifiCorp-CAISO-NVE EIM Initiative Overview.
Role of Account Management at ERCOT 2006 TAC Subcommittee Review ERCOT Board February 21, 2006.
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
CAISO Market Design Initiatives Update Donald Tretheway Senior Market Design and Policy Specialist CPUC Storage Proceeding January 14, 2013.
Texas Nodal Program ERCOT Readiness & Transition (ERT) Supplemental Information TPTF January 12, 2009 Kevin Frankeny.
EIM AWG July 5, Guiding Principles The intent of the group is to work collaboratively to better understand the WECC EIM costs and benefits analyses.
IPC’s Energy Imbalance Market OATT Stakeholder Meeting
Wind Management at MISO
Consolidated EIM Initiatives from 2017 Roadmap Issue Paper
Asia-Pacific Energy Regulatory Forum
The New Texas Wholesale/Retail Market
Briefing on 2017 CAISO Policy Initiatives Roadmap
Lorenzo Kristov, Ph.D. Principal, Market & Infrastructure Policy
On the Horizon: Energy Imbalance Market
PacifiCorp-CAISO-NVE EIM Initiative Overview
Update on Energy Imbalance Market
Presentation transcript:

Development of CAISO / PacifiCorp Energy Imbalance Market Briefing on Design Straw Proposal and Issue Paper Presentation to WECC Seams Issues & Market Issues Subcommittees May 16, 2013 Jim Price, Senior Advisor, Market Development & Analysis, CAISO Khaled Abdul-Rahman, Executive Director, Power Systems & Smart Grid Technology, CAISO

Objective of today’s briefing Common understanding of CAISO/PacifiCorp EIM proposal and how it overlays existing CAISO market Identify and understand interactions with other business practices in Western Interconnection, other than issues that will need to be resolved through the CAISO and PacifiCorp stakeholder processes

EIM stakeholder process proceeds in parallel with PacifiCorp implementation 2013 2014 Implementation agreement FERC review Implementation work System testing market simulation Board authorization 3/20/2013 Filing 4/30/2013 FERC acceptance Process Merger Go live 10/1/2014 tariff language EIM stakeholder process FERC review Expand on principles in the MOU Establish the project description and schedule Description based on EIM straw proposal Schedule identifies project tasks Board authorization 11/8/2013 Filing FERC acceptance Stakeholder meetings: 4/11/2013 – Folsom 6/6/2013 – Folsom 7/9/2013 – Phoenix 8/20/2013 – Portland 9/30/2013 – Folsom

The ISO offers comprehensive training programs Welcome to the CAISO Introduction to CAISO Markets Market Transactions EIM specific training is under development Training calendar - http://www.caiso.com/participate/Pages/Training/default.aspx Contact us - markettraining@caiso.com

March 2012, CAISO proposed a scalable approach for implementing Energy Imbalance Market (EIM) No critical mass required – each participant can enter EIM when ready Preserves participants’ autonomy and current practices Balancing authorities balance and provide their own ancillary services Balancing authorities can trade bilaterally Participants retain all physical scheduling rights Flexible modes of participation are available BAA 1 BAA 2 BAA 3 Confidential - Attorney Work Product - Prepared in Anticipation of Litigation

CAISO proposed a scalable approach for implementing Energy Imbalance Market (EIM) network modeling transmission monitoring BAAs bidding/self-scheduling intra-hour dispatch settlements

Benefits of Energy Imbalance Market Leverages existing CAISO market Enhances reliability through improved situational awareness in CAISO and EIM footprint Captures the benefits of geographical diversity of load and resources Potentially reduces reserve requirements Provides easy entry/exit for EIM participation

Design Straw Proposal

Review of EIM design straw proposal Real-Time Market Processes Hour-Ahead (HA) Real Time Unit Commitment (RTUC) Real Time Dispatch (RTD) Market Input Data Market Optimization Market Results System Operations Settlement and Accounting Other

Energy Imbalance Market Definitions EIM Entity is a balancing authority area that is enabling EIM to occur in their area. By enabling EIM, load and generation imbalances within the balancing authority will settle through the EIM. EIM Participant is a resource within the EIM Entity represented by a Scheduling Coordinator that has voluntarily elected to economically participate in the EIM.

FERC Order No. 764 introduces financially binding 15-minute market to real-time market design CAISO EIM Day Ahead Schedule Adjusted Base Schedule 15-Minute Schedule 15-Minute Schedule Real-Time Dispatch Real-Time Dispatch

Real-Time Market Processes Hour Ahead Process CAISO accept block intertie transactions 15-Minute Market: Real-Time Unit Commitment (RTUC) CAISO unit commitment, incremental AS, energy schedules EIM energy schedule changes from adjusted base schedule 5-Minute: Real-Time Dispatch (RTD) Energy dispatch within CAISO and EIM footprint

Market Input Data As needed Prior to operating hour (T-75 minutes) Resource operational characteristics Network model topology Static contingencies observed Prior to operating hour (T-75 minutes) Economic bids and hourly base schedules Ongoing Transmission and generation outages 15-minute base schedules Load and VER forecasts Dynamic contingency list Actual ETC/ATC scheduling limits and ETC uses

Hourly process for real-time market T-75: Real-Time Bid Submission Deadline T-45: Results from Hourly Process to Accept Block Schedules Published T-20: Intertie Hourly Transmission Profile and Energy Schedule for Market 1 E-Tag Deadline T T = Start of the Hour T-37.5: Start of Market 1 Optimization No hourly financially binding schedules in real-time

15-Minute Market Timeline under FERC Order No. 764 Financially Binding Market 2 T-5: Market 2 Energy Schedule E-Tag Deadline T-22.5: Self Schedule Changes for Market 2 T-7.5: Market 2 Energy Schedule Awards T T-22.5: Market 2 Optimization Starts 37.5 Minutes 20 Minutes T = Start of the Hour Honor intra-hour 20 minute e-Tag submission to avoid seams issues

RTD Market Timeline under FERC Order 764 Financially Binding Market 1 Market 2 T+15 RTD 4 RTD 2 RTD 6 T+7.5: RTD 4 Optimization Starts T+12.5: RTD 4 Dispatch, RTD 5 Optimization Begins RTD 3 RTD 5 T = Start of the Hour 7.5 Min No changes to RTD 5-minute dispatch RTD provides operational instruction to all generation and demand response resources

Establishment of Load Aggregation Points (LAP) EIM Entity defines the LAPs within its BAA For example, internal to the CAISO LAPs are defined by utility service territories The number of LAPs must be weighed against the availability of multiple granular load forecasts CAISO is responsible for determining Load Distribution Factors (LDFs) with its state estimator CAISO uses LDFs to distribute LAP forecast to individual nodes within the network model CAISO publishes LDFs used in the day-ahead market three days after the trade date CAISO will not communicate load forecast at LDF granularity to the EIM Entity

Load forecasting Load forecast by LAP should be net of “behind the meter” generation Two options for load forecast for establishing base schedule: Use ISO forecast Use EIM Participant forecast, but subject to over/under scheduling charges when errors exceed 4% threshold

Base schedule should be balanced prior to start of real-time market Load forecast from prior slide Resource plans: base schedules Self-scheduled resources Intertie schedules Base generation schedules Resource plans also include: Ancillary services reservations protected from dispatch Operational characteristics (e.g., ramp rate) Economic Bids = Base schedule must be balanced or they will be adjusted prior to start of EIM.

Establishment of balanced and feasible adjusted base schedule (1 of 2) Base schedules must consider transmission losses and be free from congestion within the EIM Entity CAISO will perform an AC optimal power flow (ACOPF) on base schedule The objective function will minimize the MW re-dispatch necessary to resolve congestion, not based on economics Only resources that have economic bids can be re-dispatched The changes to base schedules are not settled in EIM, but become the baseline to measure imbalances

Establishment of balanced and feasible adjusted base schedule (2 of 2) CAISO will provide feedback on schedules up to the binding 15-minute market ACOPF with net interchange fixed run to set the adjusted base schedule 15-minute market Changes to advisory schedules result in 15-minute market awards 5-minute market Uses the awarded 15-minute schedule from the 15-minute market as starting point

Market Optimization uses the economic bids submitted at T-75 minutes New: 15-minute process under FERC Order No. 764 Multi-interval Security Constrained Unit Commitment Runs every 15 minutes with 15-minute interval granularity Intra-hour market’s schedules maintain balance: change in generation matches interchange Imbalance energy is the difference between adjusted base schedule and 15-minute schedule

Market Optimization uses the economic bids submitted at T-75 minutes 5-minute dispatch process Multi-interval Security Constrained Economic Commitment Runs every 5 minutes with 5-minute interval granularity Imbalance energy is the difference between 15-minute schedule and 5-minute dispatch LMP marginal cost of congestion component reflects congestion contribution from binding network constraints

EIM Entity identifies resource constraints to address reliability issues which cannot be modeled CAISO will enforce reliability constraint within EIM area until the dispatch is reflected in the base schedule CAISO will not issue exceptional dispatch instructions to EIM Entity resources Any resource constraint for reliability will be settled at the EIM LMP

Market Results (1 of 2) 15-minute adjusted base schedules will be published to SCs through CAISO Market Results Interface (CMRI) 15-minute energy schedules will be published to SCs through CMRI 5-minute dispatch instructions will be communicated to the EIM Entity and the SCs Net scheduled interchange will change every five minutes through the Dynamic Schedule to ensure AGC control accuracy for the CAISO and EIM Entity

Market Results (2 of 2) Locational marginal prices for 15-minute market and RTD will be published on OASIS for all nodes and LAPs. Binding transmission constraints and shadow prices will be published on OASIS Additional market data that requires an NDA is published on CMRI

EIM System Operations (1 of 3) EIM Entity responsible for meeting Ancillary Services requirements per NERC and WECC Reserve sharing schedules EIM Entity is responsible for their share of DCS compliance EIM Entity deploys operating reserves and regulation in conformance with NERC and WECC policies If reserves are dispatched, they will be subject to EIM imbalance settlement until reflected in the adjusted base schedule Capacity to meet reserve sharing obligations is included in the resource plans used for base schedules. The capacity is protected for dispatch through EIM.

EIM System Operations (2 of 3) CAISO will manage congestion in EIM by automatically activating constraints, before flows approach capacity This allows the EIM dispatch to try and resolve the congestion Alerts the EIM Entity that they may be required to initiate UFMP Once activated, constraint will be enforced to maintain flows below the limit EIM will coordinate with WECC’s Unscheduled Flow Mitigation Procedure (UFMP) and Enhanced Curtailment Calculator (ECC) If EIM Entity initiates UFMP, CAISO will reflect the affected schedules in EIM dispatch, and enforce constraint limits as requested by RC.

EIM System Operations (3 of 3) EIM Entity responsible for dispatching contingency reserves CAISO and EIM Entity address respective shortfalls through regulation or other procedures during scarcity EIM Entity coordinates Load curtailment with its UDCs. In the event of a market disruption, the CAISO will enforce a net interchange constraint to decouple the BAA EIM Entity is responsible for managing dispatch in the event communication is lost with CAISO

EIM Settlement and Accounting (1 of 4) Instructed imbalance energy settled in two tiers at the relevant LMP: 15-minute instructed imbalance energy; and, 5-minute instructed imbalance energy Uninstructed imbalance energy treatment based upon meter granularity Generation, participating load, and dynamic resources that are metered in 5-minute intervals settle at relevant interval LMP Non-participating Load settles at the volumetric hourly weighted average LMP for the DLAP based upon the difference between the actual and the load forecast used

EIM Settlement and Accounting (2 of 4) Unaccounted for Energy Net energy delivered into UDC adjusted for service losses EIM Entities need to define UFE service areas within footprint Inadvertent Energy EIM Entity responsible for tracking and administering payment via WECC process CAISO will maintain a dynamic schedule to track energy between EIM Entities and CAISO The hourly energy will be updated on the e-Tag within 60 minutes of the end of the operating hour Settlement Metering is required for Generators. Options: CAISO Metered Entity Scheduling Coordinator Metered Entity

EIM Settlement and Accounting (3 of 4) Interchange Meter Data E-Tag information will be deemed delivered for settlement Forecasting Services CAISO Load forecast is included in Administrative Rate VER forecasting available for $0.10 per MWh CAISO Payment Calendar will be the same for EIM Neutrality Rounding adjustments apply on a 5-minute basis

EIM Settlement and Accounting (4 of 4) Administrative Costs Cost effective for October 2014-December 2014 CAISO GMC and Cost of Service Study will be updated for the rates starting 2015 Startup costs equal $0.03 times the total annual energy usage Administrative rate if $0.19 per MWh volume as calculated by: Generation = MAX (5% Gross Generation, Generation Imbalance Energy: 5-minute vs. 15-minute) Load = MAX (5% Gross Load, Load Imbalance Energy: 5-minute vs. 15-minute) Dispute resolution is through Customer Inquiry, Dispute and Information (CIDI)

Other design items Market monitoring provided by CAISO Third party arrangements between EIM Entity and EIM Participants can be made as necessary All EIM Entities and EIM Participants must fulfill regulatory compliance obligations EIM Participants responsible for following EIM tariff related to the Enforcement Protocol

Issues to Resolve

Stakeholder process will address following EIM policy issues Market rule oversight Market rule structure Transmission service Process for new EIM entities joining Uplift allocations Greenhouse gas accounting Others identified through stakeholder process

Market Rule Oversight and Rule Structure (1 of 2) Initial EIM implementation under existing CAISO market rule oversight EIM oversight may evolve over time based on stakeholder feedback Immediate options bounded by current governance Further changes require additional consideration EIM rules proposed to be a discrete part of CAISO tariff

Market Rule Oversight and Rule Structure (2 of 2) Market Administrator Model Oversight of EIM rules under the CAISO Board Possible EIM Advisory Committee Market Operator Model Independent body from the current CAISO Board Presents risks to a low incremental EIM cost Hybrid Model Contract enhancements to EIM operator relationship Can be considered as a future arrangement

Transmission Service Since initial transfer capability between CAISO and PacifiCorp will be limited, CAISO proposes no charge for as-available transmission EIM may adopt transmission rates for EIM transfers, subject to agreed upon limits establish in the EIM design

Uplift and Cost Allocation Uplifts and cost allocation will follow published cost allocation guiding principles EIM design will seek to minimize comingled costs to the extent possible. Based upon EIM design, allocations of real-time costs made to Measured Demand (Metered Demand + Exports) may need to be revised

The cost allocation guiding principles consist of seven elements Causation Comparable treatment Accurate price signals Incentivize behavior Manageable Synchronized Rational

CAISO committed to ensuring EIM design will properly account for GHG costs Entities that import energy to California have obligation to surrender compliance instruments to CARB The net incremental transfer to CAISO from EIM will be tracked through e-Tag for dynamic schedules The market optimization will consider GHG costs

Process for New EIM Entities Encourage interested parties to engage as early as possible For 2014, assessment based upon system complexity and timing of commitment Anticipate future implementations will occur on an annual commitment cycle with 12-18 month lead time Implementation requires significant network modeling changes Must align with CAISO spring and fall software release cycle New entrants pay start up fee ($0.03 per MWh Demand) Payment will be established through implementation agreement filed with FERC