WESTERN ELECTRICITY COORDINATING COUNCIL OPERATIONS COMMITTEE June 18, 2009 Salt Lake City, UT Base Case Coordination System (BCCS) Request For Information.

Slides:



Advertisements
Similar presentations
ColumbiaGrid Reliability Workshop October 1, 2007 Developmental and Staffing Reliability Functional Agreement (DSRFA) Details This program is the cornerstone.
Advertisements

Parallel Flow Visualization/Mitigation Proposal
NAESB Coordinate Interchange
WECC/TEPPC Response to DOE Funding Opportunity Status Update June 29, 2009 Bradley Nickell Renewable Integration and Planning Director.
Summary of Second Draft of the NERC Standard PRC Disturbance Monitoring and Reporting JSIS Meeting August 10, 2010 Salt Lake City, UT.
PCC Update Presentation to TEPPC June 2010 Dana Cabbell PCC Chair.
TRDTF Transmission Reliability Database Task Force Update & Approval Vote Brian Keel SRP
Strategic Planning Update For Board Meeting December 5, 2007.
Base Case Coordination System RFP David Franklin BCCS System Review Group/Planning Tool Subcommittee (PTS) Pre-Bid Conference Salt Lake City, Utah.
1 Report of the Planning Coordination Committee WECC Board of Directors Meeting April 21, 2006 San Diego, CA.
Report of the Planning Coordination Committee December 2006 WECC BOD Meeting Cabo Del Sol, Los Cabos.
1 TSS Report PCC Meeting Salt Lake City, UT October 26-27, 2006.
Bulk Electric System Definition Task Force Update Michelle Mizumori June 18, 2009 Salt Lake City.
Craig L. Williams UFAS Liaison Market Interface Manager ECC Cost Benefit Analysis Review July 17-19, 2013 Standing Committees Joint Session.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Scope of Work Approval January 25, 2013 Joe Seabrook Puget Sound Energy.
Wide Area Measurement Communication Network Proposal June 2009 Operating Committee Meeting.
WECC Operating Committee Report WECC Member Meeting April 20, 2006.
Standards Update WECC Board of Directors Technical Session December 5, 2007 Albuquerque, New Mexico Steve Rueckert Director of Standards.
Western Electricity Coordinating Council Identify, coordinate, and propose solutions to seams issues Participate, monitor and communicate the development.
LRS Report to PCC Wally Gibson, NWPCC Planning Coordination Committee Albuquerque, NM March 6-7, 2008.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) May 15, 2013 Joe Seabrook Puget Sound Energy.
Unscheduled Flow Administrative Subcommittee Report David Lemmons March 27, 2013 Salt Lake City, UT.
Western Electricity Coordinating Council Status of NERC Standards Activity WECC PCC Meeting March 6-7, 2008.
Demand Resource Operable Capacity Analysis – Assumptions for FCA 5.
1 Quality Indicators for Device Demonstrations April 21, 2009 Lisa Kosh Diana Carl.
NREL Wind Integration Workshop By Electric Power Systems, Inc. June 28-29, 2010.
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee March 2014.
Jerry Rust Chair - Underfrequency Load Shedding Criterion Team
Brett Wangen, Director of Engineering WECC RC Update to PCC Planning Coordination Committee Meeting October 24, 2013.
Enhanced Curtailment Calculator (ECC) Task Force Joint Guidance Committee Presentation and Motion to the OC & MIC Standing Committee Meetings March 27-29,
Brenda Ambrosi ISAS Chair OC Update August 2012 Salt Lake City, UT.
OC Chair Items Don Watkins June 18-19, 2009 Operating Committee.
Marv Landauer Report to TSS on Annual Study Program Report Review Task Force April 2012 TSS Meeting Salt Lake City.
NERC PC Issues Update WECC PCC Meeting John Simpson, RRI Energy Planning Coordination Committee Seattle, WA June , 2010.
SRWG Activity Report (as presented) March 21-23, 2012 TSS Meeting #160 WECC Offices Salt Lake City, Utah Mark Graham, SRWG Chair/David Franklin TSS.
North American Electric Reliability Council 1 Coordinate Operations Standard Jason Shaver Standard Drafting Team Chair September 29, 2005.
Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
SRWG Chair Report March 2015 WECC HQ
SRWG Update to TSS February 2015, Meeting 168 WECC HQ
Tracy Rolstad TSS Chair TSS Chair Report October 2014 Salt Lake City, UT 1.
Visibility 10/1/ Agenda Visibility Overview Status –WECC –ColumbiaGrid Issues Preliminary Thoughts Regarding Conclusions and Recommendations Next.
Transmission planning in Vermont Past, present and future Docket 7081 workshop By Dean LaForest 9/19/05.
AICT5 – eProject Project Planning for ICT. Process Centre receives Scenario Group Work Scenario on website in October Assessment Window Individual Work.
Integrated Security Analysis Pete Sauer, PSERC – Illinois Kevin Tomsovic, PSERC – WSU Steve Widergren, PNNL January 27-29, 2004 Washington, D.C. Transmission.
Peak RCCo Performance Metrics Draft –November 2013.
Enhanced State Estimation by Advanced Substation Monitoring PSerc Project Review MeetingTexas A&M University November 7, 2001 College Station, TX PIs:
WestConnect Activities Charles Reinhold WestConnect Project Manager 2008 ACC BTA Workshop Phoenix, AZ May 22, 2008.
Application and Implementation of State Estimator at Idaho Power Company S. Kincic and M. Papic.
13 Step Approach to Network Design Steps A Systems Approach 8Conduct a feasibility Study 8Prepare a plan 8Understand the current system 8Design.
Tracy Rolstad TSS Chair TSS Chair Report July 2014 Salt Lake City, UT 1.
1 Progress Report Policies and Procedures Tom Green PCC Salt Lake City July 15, 2014.
Section 4.9 Work Group Members Kris Hafner, Chair, Board Member Rob Kondziolka, MAC Chair Maury Galbraith, WIRAB Shelley Longmuir, Governance Committee.
TEPPC Review Task Force January 11, Purpose Advise and make recommendations on Future potential future generation and load balance Adequacy of the.
CREPC/WIRAB Meeting April 27, 2016 Salt Lake City, UT Thomas Carr Western Interstate Energy Board Evolution of Grid Planning in the West.
TEPPC Review Task Force Ian McKay, Chair, TEPPC W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Study Plan Development & Approach May 5, 2010 Conference Call & Webinar “To ensure efficient, effective, coordinated use & expansion of the members’
Visibility Ramu Ramanathan 10/1/2007.
Western Electricity Coordinating Council
TEPPC Review Task Force Meeting February 4-5, 2016
Reconciling Power Flow (PF) with Production Cost Model (PCM) Cases
Unscheduled Flow Administrative Subcommittee Report
Reliability Assessment Committee Proposal TSS Meeting
Nick Hatton Associate Engineer March 9, 2017
Reliability Assessment Committee
Planning Tools Overview
ColumbiaGrid Planning Meeting WECC Update February 9, 2017
Jonathan young ColumbiaGrid
System Review Work Group Update to TSS
AICT5 – eProject Project Planning for ICT
RPCG – CCTA Process Overview
Presentation transcript:

WESTERN ELECTRICITY COORDINATING COUNCIL OPERATIONS COMMITTEE June 18, 2009 Salt Lake City, UT Base Case Coordination System (BCCS) Request For Information (RFI) Presented by: Randy Rhodes David Franklin

BCCS RFI The purpose of this RFI is to seek information from Responders qualified to provide WECC with a software solution for improved management of transmission planning data at a central location and improved coordination of transmission planning base cases. SRWG/TSS is seeking to improve the existing process by automating planning case development and review that are now done manually. These improvements are expected to both improve planning model accuracy and reduce manpower requirements. In this RFI, SRWG/TSS is seeking information that will likely be used in developing a Request for Proposal (RFP) to supply and implement this software. 2

Back Ground History In July 2006, SRWG Evaluated The Base Case Process SRWG (Randy Rhodes) Meetings with WECC RC In Vancouver, WA PCC/OC Conference Call Meeting – May 29 th, 2009 OC agreed that a RFI would be the next step for BCCS 3

Planning Functions The two primary Planning deliverables are to deliver a construction plan and establish boundary operating conditions for the transmission system. To support these primary deliverables and other needs, Planners: Validate/establish path ratings Respond to generation interconnection requests Respond to transmission service requests Perform stability studies Examine major transmission changes Evaluate system device changes/additions/deletions Support the WECC Annual Study Program Support their company Integrated Resource Planning (IRP) process Support TEPPC and other regional transmission planning needs 4

Current Base Case Preparation Process The current interaction process between Transmission Planners and WECC A base case generally requires 14 weeks or longer from data request to posting the base case on WECC website. currentbasecaseassembly.docx 5

SRWGs Evaluation Issues With The Current Base Case Preparation Process Process Manual Base Case Preparation Process Time Consuming for Area Coordinators Communication Data Submittal Consistency (Improved With Short Term Solution) Late Data submittals (Improved With Short Term Solution) Lack Viewing of Significant Additions Lack of a Centralized Data Base System 6

Planning Needs WECC's System Review Work Group (SRWG), as a representative of the transmission planning community, has tentatively established a set of needs and desired improvements to support the base case development process and aid the planning community as a whole. Needs and desired improvements are: Improve data entry Improve Area Coordinators Communication Independent of Power Flow Format Better data error checking and correction capability Store current/future year topologies of the system Add more automation to the planning process (less manual) Potentially increase the number of yearly base cases Be able to more efficiently make base case variations To have a more centralized data base Web based accessibility 7

Plannings Needs (Cont) Potentially develop longer-range cases (10-15 years) Increase efficient to assemble disturbance validation cases Improve data consistency/accuracy Need a way to help validate load modeling Need a way to validate dispatch patterns Capture any real-time scenario for examination Capture sequential system conditions for study Easy project additions for any year-out cases Model voltages below 100kV 8

BCCS Implementation WECC anticipates that this system could be hosted at the WECC facilities. The primary systems at that location include the EMS and associated model management environment. The following diagram illustrates the relationship between the BCCS and the WSM environment in the Reliability Centers in more detail. 9

BCCS Implementation (cont) The Full BCCS Implementation Will Take Place in Stages and in Coordination with the Further Development of the WSM. 10

SRWGs Conclusion Conceptual BCCS Although there are programs available to potentially meet planning needs, further evaluation is required to make that determination. West Wide System Model A tool to meet operations needs and to develop validation base cases Although the WSM meets some planning needs, additional tools are required to fully address base case preparation issues. For example, but not limited to: Model Voltages Below 100kV Identify Facility Outages When The Snap – Shot is Taken of the System Improve Interchange Discrepancies Improve Communication Between Area Coordinators Provide the ability to build long term base cases 11