Report of the Planning Coordination Committee WECC Board Meeting Albuquerque, NM December, 2007.

Slides:



Advertisements
Similar presentations
1 Actuarial Management Resources, Inc SEAC Spring Meeting Miami Beach, Florida Individual Health Topics Exploring Methods for Premium Deficiency.
Advertisements

2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
Historical Hydro-Quebec Phase II Flow and Transfer Capability Limit Data Peter Wong, ISO New England Power Supply Planning Committee Meeting June 4, 2007.
Electricity and Natural Gas Supply, Reserves, and Resource Adequacy CMTA Energy Conference Energy: Growing Californias Economy William J. Keese California.
Armstrong Process Group, Inc. Copyright © , Armstrong Process Group, Inc., and others All rights reserved Armstrong Process.
WECC Board of Directors April 21-23, 2004 Seattle, Washington WECC Procedure for Reporting of System Events Disturbance Reports Rod Maslowski OC Vice Chairperson.
CPUC Vision for Transmission Planning in the West Dian M. Grueneich, Commissioner California Public Utilities Commission Western Electricity Coordinating.
Briefing on California ISO Dynamic Transfers Stakeholder Process For WECC Seams Issues Subcommittee Meeting May 4, 2010 Jim Price, Lead Engineering Specialist.
1 Sunrise Powerlink and Southwest Powerlink Reliability Performance Evaluation Double Line Outage Probability Analysis March 6, 2008.
1 Report of the Planning Coordination Committee Report to the WECC Annual Meeting April 20, 2006 Robert Jenkins, PCC Chair.
NERC TPL Standard Issues TSS Meeting #146 Seattle, WA August 15-17, 2007 Chifong Thomas.
1 Data Work Group WECC - TEPPC Technical Advisory Subcommittee Meeting San Francisco, CA November 28, 2007 Jamie Austin PacifiCorp Progress Report: 2007.
Operating Reserves --- Again A Discussion Primer
1 Report of the Planning Coordination Committee WECC Board of Directors Meeting April 21, 2006 San Diego, CA.
Report of the Planning Coordination Committee December 2006 WECC BOD Meeting Cabo Del Sol, Los Cabos.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Scope of Work Approval January 25, 2013 Joe Seabrook Puget Sound Energy.
WECC TEPPC – March 25, 2010 Proposed Revisions to PCC Regional Planning Document 1 Proposed Revisions to Overview of Policies and Procedures for Regional.
Report of the Planning Coordination Committee WECC Board Meeting San Diego, CA April, 2009.
1 Compliance Report WECC Board of Directors Meeting December 7-8, 2006 Steve Rueckert Director, Standards and Compliance.
Operating Transfer Capability Policy Committee Report Board of Directors Meeting April 21 & 23, 2004 Thomas A. Delawder OTCPC Chair Western Electricity.
LRS Report to PCC Wally Gibson, NWPCC Planning Coordination Committee Albuquerque, NM March 6-7, 2008.
Loads and Resources Subcommittee Report Wally Gibson, NWPCC PCC Meeting June 10-11, 2010.
California Transmission Planning Group Presentation to: WECC Transmission Expansion Planning Policy Committee June 16-17, 2010 TANC.
Northern Tier Transmission Group SPG Report to TEPPC June 17, 2010 Denver To ensure efficient, effective, coordinated use & expansion of the members transmission.
Presented to the WECC MIC June 15, 2007
Heidi Pacini Staff Engineer Developing a Draft 2011 Study Program March 10, 2010 SWG Conference Call.
0 - 0.
Addition Facts
Demand Resource Operable Capacity Analysis – Assumptions for FCA 5.
Gas-Electric Coordination Update JGC Meeting August 23-24, 2012.
Unclassified Performance Management Process For Unclassified Administrative and Professional (Non-Teaching) Employees Summer 2011.
AN INTRODUCTION TO THE MIDWEST ISO By Bill Malcolm Manager-State Regulatory Affairs Pierre, South Dakota June 9, 2006.
SAS 70 Third Party Report on Controls Overview and Timetable Finance / Audit Committee Meeting Austin, Texas January 14, 2003/ February 18, 2003.
Legal Framework, Investment Opportunities and Technical Innovation in the Electricity Sector Security of Supply through competitive markets: Design of.
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee March 2014.
Energy Efficiency Assumptions in the WIRAB Low Carbon Case Thomas Carr Western Interstate Energy Board July 30, 2008 Studies Work Group Meeting Portland,
2024 Common Case Results Resource Adequacy.
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee July 2014.
RPEWG Present and Future Activities Boise, August 17, 2011 RPEWG Meeting 1.
NERC PC Issues Update WECC PCC Meeting John Simpson, RRI Energy Planning Coordination Committee Seattle, WA June , 2010.
WECC Reliability Based Control Field Trial
TransWest Express and Gateway South WECC Planning Coordination Committee David Smith, National Grid October 25-26, 2007 Vancouver, B.C.
Rocky Mountain Area Transmission Study RMATS Economics Economic Comparisons Preliminary: Distribution of Gains and Losses RMATS Steering Committee July.
Addition 1’s to 20.
Al McBride MANAGER, AREA TRANSMISSION PLANNING Existing Import Interfaces: Transmission Transfer Capabilities and The Calculation of Tie Benefits DECEMBER.
Making Clean Local Energy Accessible Now December 16, 2013 Flattening the Duck Dynamic Grid Solutions for Integrating Renewables.
Update on the Western Region Resource Plan Presented to the Community Energy Advisory Council November 14, 2008.
Public Service Company of New Mexico
CPUC Procurement Policies Robert L. Strauss California Public Utilities Commission Energy Division - Procurement Section.
Preliminary Review of July 24 th Extreme Temperature Event & Implications for Pilot Capacity Standard Mary Johannis & Wally Gibson PNW Resource Adequacy.
WECC PCC Meeting Salt Lake City, UT March 26, 2014.
WECC PCC Meeting Salt Lake City, UT July 16, 2014.
5/23/08ACC 5 th BTA Workshop – Phoenix - SWAT – RE Kondziolka 1 SWAT Subregional Planning Group Update Arizona Corporation Commission Fifth Biennial Transmission.
NW Resource Adequacy Forum Steering Committee Conference Call November 4, 2010.
A Resource Adequacy Standard for the Pacific Northwest Resource Adequacy Technical Committee January 17, 2008 Portland Airport.
Adequacy Assessment for the 2017 Pacific Northwest Power Supply Steering Committee Meeting October 26, 2012 Portland, Oregon 1.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
Relationship of Regional Resource Adequacy Standards to Utility Planning PNW Resource Adequacy Steering Committee Meeting June 27, 2007.
Providing Resource Planning Guidance to Individual Utilities PNW Resource Adequacy Technical Committee Meeting June 20, 2007.
ISO Proposed Flexible Capacity Requirements Stephen Keehn Senior Advisor California ISO CPUC Workshop January 26, 2012.
CALIFORNIA ENERGY COMMISSION Workshop on the Staff Draft 2006 Summer Outlook Report December 8, 2005 Hearing Room B.
Out of Region Market Assumption Resource Adequacy Technical Committee December 1, 2011.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
Capacity, Demand and Reserves Report Bill Bojorquez Board of Directors Meeting May 16, 2007.
Long Term Transmission Integration Planning at the California ISO Intermittency Analysis Project (IAP) Energy Commission Staff Workshop February 13, 2007.
CPUC Resource Adequacy Program – LAO briefing May 25, 2009.
Out of Region Market Assumptions
Study Results Drought Scenario Study
Resource Adequacy Steering Committee Meeting October 4, 2011
Presentation transcript:

Report of the Planning Coordination Committee WECC Board Meeting Albuquerque, NM December, 2007

2 PCC Agenda Approval Items Revisions to the WECC Power Supply Assessment Policy Power Supply Assessment (PSA). Information Items Facility Rating Process

3 Changes to the Policy Current policy approved in 2000 and revised in 2002 Proposed substantive updates Specifies assessments shall consider capacity and energy Adds fuel supply interruption as potential uncertainty for future evaluation, an issue of interest to NERC Describes building blocks generally and characterizes them as initial adequacy guidelines, giving WECC a specific reference in policy for external parties Removes direction to calculate probabilities of serving load (will still be area of future LRS exploration) Creates a communication mandate to states and others

4 Proposed Motion The PCC recommends that the WECC Board approve the revisions of the WECC Power Supply Assessment Policy prepared by LRS.

5 Power Supply Assement History Aim: replace the Power Supply Design Criteria (PSDC) for WECC resource adequacy assessments LRS has been developing a bottom-up approach based on building blocks October 2006 PCC meeting: Described initial components in qualitative terms March 2007 PCC meeting: More detailed description of components being considered July 2007: Board approved the Building Block approach LRS made changes based on feedback October 2007: PCC unanimously approved the Assessment

Power Supply Assessment Two resource levels Class 1 – reported to be under construction and in- service by January 2011 Class 2 – reported to be under regulatory review and in-service by January 2013 Other reported resources (Class 3) listed but not used in analysis Cases, combinations of: Summer and winter Building block margins and flat 15% margin Extreme temperature scenarios, for only

7 Adequacy Reserve Margin Components Calculated by BA, applied by sub-region Components Contingency reserves from NERC/WECC standards Regulating reserves from NERC/WECC standards Reserves for additional forced outages that would require rebuilding contingency reserves – estimate from outage data Reserve for additional load caused by 1-in-20 temperatures

8 Response to Comments from Last Meeting Added appendix clarifying that PSA margins are not intended to supplant any margins ordered by regulatory agencies nor are they directly comparable to the margins an individual LSE or regulator might use to evaluate adequacy Did modify the calculation for California LSEs within ISO footprint to address aggregation issues Looked at effect of wind machines at 0% capacity factor – negligible in this PSA but an issue for future PSAs

9 Adequacy Reserve Margin Values in PSA Sub-area SAM Bubbles Included in Sub- area SummerWinter Margin CanadaBC, Alberta12.0%12.8% Southwest Arizona, N. Mexico, S. Nevada, IID, Four Corners, Palo Verde 15.7%14.6% NorthwestPacific Northwest, COB, Montana13.7%16.3% BasinIdaho, Utah, N. Nevada12.8%13.5% N. California N. California, Central California, San Francisco, SMUD 16.5%12.2% S. California/MexicoS. California, San Diego, LADWP, CFE, IPP16.6%13.0% Rocky MountainsColorado East, Colorado West, Wyoming14.2%15.4%

10 Power Supply Margin by Sub-region – Summer, Class 1 Resources Only

11 Power Supply Margin by Sub-region – Summer, Class 1 and 2 Resources

12 Power Supply Margin by Sub-region – Winter, Class 1 and 2 Resources

13 Response to Current Comments – 1 Comment: PSA assumes all existing resources remain in service. PSA should acknowledge uncertainty about aging plants, e.g., ~4,400 MW in N. California. Response: L&R data request asks for known retirements. Issue especially complex in California because of limited future resource info available to CAISO. BA vs. LSE and/or market knowledge is ongoing problem. An issue for next years PSA.

14 Response to Current Comments – 2 Comment: Recommend WECC develop rules for counting resources based on completion of milestones. Response: LRS will continue to look at the categorization of new resources in the L&R data request and in the PSA. Biggest problem is lack of BA knowledge. Comment: In future PSAs, WECC should adjust the adequacy metric to reflect changing mix of resources, especially increasing amounts of intermittent and non- dispatchable resources. Response: LRS will examine this issue further in future PSAs. Because of how we used resource class categories this is less of an issue this year.

15 Future Work Continue evaluation of data needs and data requests, including by other WECC users, e.g., TEPPC Adequately recognize energy constraints on the system Particularly, constraints on NW hydro operation and effect on capacity available to meet load Review, perhaps expand, building blocks and calculation of numerical values Examine use of Promod, or other models, for adequacy analysis Continue to improve consistency of WECC resource adequacy reports with NERC adequacy reports

16 Proposed Motion PCC recommends that the Board approve the 2007 Power Supply Assessment (PSA).

17 Information Items

18 Facility Rating Process Projects Entering Regional Planning Gateway/South Gateway/West Central California Clean Energy TransWest Wyoming West Projects Entering Phase 1 (none) Projects Entering Phase 2 Juan de Fuca Path 54 Springerville Unit #4 Tot 3 Upgrade Colorado/WY (TOT3) Projects Entering Phase 3 Centennial Path Redefinition Green Path MATL Path 27