Reducing ITS Project Risk By using and developing consensus based regional ITS architecture and a systems engineering process Robert S. Jaffe, Ph.D., CSEP.

Slides:



Advertisements
Similar presentations
Program Management Office (PMO) Design
Advertisements

The HR Paradigm Shift Discover Stakeholder Value for the Human Resources Function.
Software Quality David Jones, Director. 2 Agenda What is it and why is it important? How do we deliver it? Conclusions.
Ninth Lecture Hour 8:30 – 9:20 pm, Thursday, September 13
“Not Fully Specified (Project) Objectives” CS524 – Software Engineering I Azusa Pacific University Professor Dr. Sheldon X. Liang Fall I 2007 Ernie Rosales.
 The Rise of Computer Science ◦ Machine Language (1 st Gen) ◦ Assembly Language (2 nd Gen) ◦ Third Generation Languages (FORTRAN, BASIC, Java, C++, etc.)
Secure System Administration & Certification DITSCAP Manual (Chapter 6) Phase 4 Post Accreditation Stephen I. Khan Ted Chapman University of Tulsa Department.
Understanding Information Technology System Project Failure By: Michael Bury MIS
Winning Strategy 2 CSR plan
Microsoft Office Project Portfolio Server
Justice Information Network Strategic Plan Development Justice Information Network Board March 18, 2008 Mo West, JIN Program Manager.
© Joseph F Iaquinto, PE May 14, © Joseph F Iaquinto, PE May 14, 2012 EAI / SOA Composite System A System Engineering Approach.
BIS310: Structured Analysis and Design Introduction and Systems Planning Week 1.
Copyright Course Technology 1999
Supporting tools in an IT Project & Portfolio Management environment Ann Van Belle -
Software Project Management Introduction to Project Management.
Engineering, Operations & Technology | Information TechnologyAPEX | 1 Copyright © 2009 Boeing. All rights reserved. Architecture Concept UG D- DOC UG D-
THE REGIONAL MUNICIPALITY OF YORK Information Technology Strategy & 5 Year Plan.
Creating a New Vision for Kentucky’s Youth Kentucky Youth Policy Assessment How can we Improve Services for Kentucky’s Youth? September 2005.
-Nikhil Bhatia 28 th October What is RUP? Central Elements of RUP Project Lifecycle Phases Six Engineering Disciplines Three Supporting Disciplines.
1 ITS America Palm Springs, CA June 6, 2007 SunGuide SM Software – Florida's ITS Software ITS America Palm Springs, CA June 6, 2007 Trey Tillander, P.E.
NextGen: Changes to Strengthen Validation and Verification Jay Merkle Director, Enterprise System Integration October, 2011.
Business Systems Development SDLC and introduction to the Microsoft Solutions Framework Team and Process Models.
The Challenge of IT-Business Alignment
Doug Bellomo April 6, NFDA Retreat & Conference “Risk MAP--Foundation, Transition, Integration” Risk MAP: An Update to NFDA.
GBA IT Project Management Final Project - Establishment of a Project Management Management Office 10 July, 2003.
Kelly J. Harris SEARCH Deputy Executive Director
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
1 Approaches for Integrating Systems Engineering into Your Agency’s Business Practices Presented by: Amy Tang McElwain August 2, 2007 Talking Technology.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
IT Requirements Management Balancing Needs and Expectations.
Homeland Security Grant Program 2015 Process Michelle Hanneken Illinois Emergency Management Agency.
NCHRP Study (30) Performance Measures for Context Sensitive Solutions – A Guidebook for State DOTs As presented by Sally Oldham at the 2005 Midwest.
PROJECT MANAGEMENT FUNDAMENTALS Page 2 Why Project Management? Current Issues: n Complex nature of business today — More cross-functional efforts — Need.
Improving Integration of Learning and Management Systems Paul Shoesmith Director of Technical Strategy Becta.
1 Requirements Management - General concepts - Noureddine Abbadeni King Saud University College of Computer and Information Sciences Based on “Software.
ITS Standards Program Strategic Plan Summary June 16, 2009 Blake Christie Principal Engineer, Noblis for Steve Sill Project Manager, ITS Standards Program.
Traffic Monitoring Guide 2012 Update May 9, 2013 DBP Roadway Transportation Data Business Plan presented to Data Palooza U.S. Department of Transportation.
Microsoft Office Project 2003: Selling EPM in your Organization Matt Wilson Business Solutions Specialist LMR Solutions.
Rational Requirements Management with Use Cases v5.5 Copyright © Rational Software, all rights reserved 1 Requirements Management with Use Cases.
Project Kick-off Meeting Presented By: > > > > Office of the Chief Information Officer.
ConSysTec 3 rd Israel ITS AnnualMeeting Israel ITS Architecture Development Rob Jaffe, Ph.D. President, ConSysTec Shenorock, NY USA.
Search Engine Optimization © HiTech Institute. All rights reserved. Slide 1 What is Solution Assessment & Validation?
Statistics from the Famous 1995 Standish Group Report.
Practical Investment Assurance Framework PIAF Copyright © 2009 Group Joy Pty. Ltd. All rights reserved. Recommended for C- Level Executives.
Software Requirements and Design Khalid Ishaq
Project Portfolio Management Business Priorities Presentation.
Implementation: Results from the Using Your Regional ITS Architecture Peer Exchange Network Workshop Mac Lister FHWA Resource Center ITS America Annual.
Business Analysis. Business Analysis Concepts Enterprise Analysis ► Identify business opportunities ► Understand the business strategy ► Identify Business.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
1 The Requirements Problem Chapter 1. 2 Standish Group Research Research paper at:  php (1994)
SOFTWARE PROCESS IMPROVEMENT SHARATH CHANDAR REDDY ALETI CSC 532 TERM PAPER.
ITS ePrimer Module 2: Systems Engineering September 2013 Intelligent Transportation Systems Joint Program Office Research and Innovative Technology Administration,
Software Requirements Specification Document (SRS)
IFS310: Module 2 1/18/2007 Systems Planning and SDLC.
Leadership Guide for Strategic Information Management Leadership Guide for Strategic Information Management for State DOTs NCHRP Project Information.
BIMILACI 2007 Partners for Quality Infrastructure: The FIDIC Vision Washington, May 10, 2007 Dr. Jorge Díaz Padilla FIDIC President.
Driving Value from IT Services using ITIL and COBIT 5 July 24, 2013 Gary Hardy ITWinners.
Info-Tech Research Group1 Info-Tech Research Group, Inc. Is a global leader in providing IT research and advice. Info-Tech’s products and services combine.
Environment, Safety, and Occupational Health Opportunities in DoD Business Transformation May 4, 2006.
1 Working with Project Stakeholders in a Statewide Project PMI-SVC PMO Forum Monthly Meeting Dan Conway, PMP October 22, 2008.
Managing Enterprise Architecture
The Nature of Information Technology Projects
Project Overview – Phase 1
Identify the Risk of Not Doing BA
DT249/4 Information Systems Engineering Lecture 0
IEEE Std 1074: Standard for Software Lifecycle
Regional Architecture Development for Intelligent Transportation
Using the EFQM Excellence Model to support the role of a trustee
Project Management Chapter 11.
Presentation transcript:

Reducing ITS Project Risk By using and developing consensus based regional ITS architecture and a systems engineering process Robert S. Jaffe, Ph.D., CSEP President Manny S. Insignares Vice President, Technology Consensus Systems Technologies (ConSysTec) Corporation, April 2010 ConSysTec

Introduction: We will show that Developing, Maintaining, and Using a regional ITS architecture to plan ITS projects and Using a Systems Engineering process to design, build, and test ITS projects:  Reduces the risk of ITS project cost/schedule overrun and  Reduces the risk of not meeting all the needs originally intended ConSysTec

Key Concepts 1. Regional ITS architecture and policy 2. Use of ITS Architecture/ Systems Engineering 3. Project deployment and success factors 4. (Establishing a policy for planning and designing for sustainability.*) * Discussed in the paper, not in the presentation. ConSysTec

1. Regional ITS Architecture & Systems Engineering Policy A regional ITS architecture and associated SE asks: 1) Are we (the transportation agencies in the region) doing the right projects with no conflicts or overlaps? 2) Are regional multi-modal transportation organizations (transit, traffic, public safety, etc.) able to share needed information between ITS systems? 3) What needs (or user services) can be satisfied through ITS investments? 4) How do we measure success?  This last one is not included in the current DOT Rule/Policy. ConSysTec

Policy acts a catalyst to facilitate: Development of the Regional ITS Architecture Use of the Regional ITS Architecture  in ITS Project Programming (“Integration Strategy”*)  In Deployment of each ITS project (“Rule 940”) * Proposed, but not current policy ConSysTec

2. Use of ITS Architecture & Systems Engineering The key purpose of Systems Engineering is to direct and focus an organization’s intention at every stage of development ConSysTec

Project Success Factors Systems Engineering Impacts Improves chances of delivering results  within timeframe and budget, and  meeting the intended needs (scope) By detecting defects early (when they are easy to fix) through a process that emphasizes  Stakeholder Validation  Technical Verification  Other methods (risk management, configuration control, etc.) ConSysTec

Relation of Budget Spent on Systems Engineering to Project Cost Overrun Percent Budget Spend on SE Analysis Average Project Cost Overrun Less than 5%125% 5 to 10%83% More than 10%30% ConSysTec

Table 2: Relation of Time Spent on Systems Engineering to Project Delay Later Project Phases: Design, Implementation, Test Effort (Man- Hours) Devoted to Requirements Activities Schedule Devoted to Requirements Activities Completed Faster 14%17% Completed Slower 7%9% ConSysTec

3. Project Deployment and Success Factors Deployment: A Systems Engineering Process Model Project Success Factors Assessing the Contribution to Project Success of  All Project Success Factors  Regional ITS Architecture ConSysTec

The Systems Engineering Process (SEP) ConSysTec

Why apply Requirements-Based Validation and Verification at each stage of the Systems Engineering Process? Find and then eliminate defects early Find requirements gaps and inconsistencies (i.e., conflicting requirements) Find requirements redundancies Uncover poorly-structured relationships among system elements ConSysTec

Table 3: Standish Group CHAOS Report Project Success Rates Description of Project Outcome% in 2006% in 1994 Successful, meaning projects were completed on time, on budget and met user needs 35%16% Outright failure or project cancelled 19%31% Challenged, meaning they had cost or time overruns or didn’t fully meet the user’s needs 46%53% ConSysTec

Table 4: Standish Group Project Risk Factors and Assessment Project Success FactorsSuccess Points Success Potential of Your Project Yes = Add Points Value; No = 0 1. User Involvement19 2. Executive Management Support Clear Statement of Requirements Proper Planning11 5. Realistic Expectations10 6. Smaller Project Milestones9 7. Competent Staff8 8. Ownership6 9. Clear Vision & Objectives3 10. Hard-Working, Focused Staff3 Total100% ConSysTec Regional ITS Architecture Project specific 61%

Assessment of Project Success using Standish Group Method According to the Standish Group’s method, we can increase the chances of project success by up to 60% if we:  Develop a Regional ITS Architecture  Use this architecture in project planning and deployment  Apply the Systems Engineering process ConSysTec

4. Establishing a Policy for Planning and Designing for Sustainability Planning and designing sustainable ITS systems may require a policy directive The regional ITS architecture and systems engineering process can facilitate sustainable ITS solutions by taking into account a total life- cycle view of the ITS system Sustainability implies an even longer life-cycle, whereby fiscal, environmental and social benefits and costs can be taken into consideration to yield positive returns ConSysTec

Acknowledgments The authors would like to thank our many clients who have trusted us to develop their consensus based ITS Architectures, and who have been the inspiration for this work. ConSysTec

References 1.Intelligent Transportation Systems Strategic Plan – Kentucky Transportation Cabinet, Commonwealth of Kentucky, June State of Florida Department of Transportation, “The 2005 Update of Florida’s Intelligent Transportation System Strategic Plan,” December Minnesota Department of Transportation Office of Traffic, “Security and Operations Statewide ITS Strategic Plan 2006: An Action Plan for ITS Development and Deployment,” June 30, Paul Gonzalez, “Building Quality Intelligent Transportation Systems Through Systems Engineering;” Mitretek Systems, April Karl Wiegers, More About Software Requirements, Microsoft Press, Joseph Blackburn, Gary Scudder, and Luk N. Van Wassenhove, “Improving Speed and Productivity of Software Development: A Global Survey of Software Developers,” IEEE Transactions on Software Engineering, December The “The Standish Group Report: CHAOS,” The Standish Group, David Rubinstein, “The Standish Group Report: There’s Less Development Chaos Today,” Software Development Times, March 1, 2007 ConSysTec