LIGO-G070316-00-W News From Joint Run Planning Committee Roberto Passaquieti & Fred Raab 23May2007.

Slides:



Advertisements
Similar presentations
GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
Advertisements

Hiro Yamamoto at LCGT f2f ICRR on September 28 th, 2010 LIGO-G v1 LCGT-G v1 LIGO and LCGT collaboration Hiro Yamamoto / LIGO Lab Based.
LIGO-G W LIGO Laboratory1 Educational Outreach Across LIGO Funding source: »LIGO operations »IPSE proposal submitted in 2003 (pending) »Advanced.
LIGO-G W Lessons Learned From E7 at LIGO Hanford Observatory Fred Raab Daniel Sigg.
LIGO-G W LIGO Hanford Observatory Manpower Frederick J. Raab, LIGO Hanford Observatory.
G D Interferometer Status LSC Meeting, Ann Arbor, June 4, 2005 Daniel Sigg.
LIGO-G W Report on LIGO Science Run S4 Fred Raab On behalf of LIGO Scientific Collaboration.
9/23/08G Z Status of the S5 calibration Michael Landry For the Calibration Committee LSC September 2008 Michael Landry For the Calibration Committee.
LIGO-G D partial ADVANCED LIGO1 Development Plan R&D including Design through Final Design Review »for all long lead or high risk subsystems »LIGO.
Science Operations Status Maria Santos-Lleo EPIC cal & ops meeting, Madrid March, 2010.
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda Item: 15 Chu ISHIDA(JAXA) on behalf of Rick Lawford, GEO Water CoP leader GEO Water.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
Report From Joint Run Planning Committee R. Passaquieti & F. Raab - LSC / VIRGO Collaboration Meeting rd July 2007 – LIGO-G Z.
LIGO-G Z Detector Characterization Summary K. Riles - University of Michigan 1 Summary of Detector Characterization Activities Keith.
Report to the collaboration Yifang Wang IHEP Progress of the construction –SSM: Valve box successful, magnet cool down in mid June –Mechanical structure.
EMTA European issues: PSO and Green Paper Progress report – April 2007 EMTA General meeting.
LIGO-G M Management of the LIGO Project Gary Sanders California Institute of Technology Presented to the Committee on Programs and Plans of the.
Status of LIGO Data Analysis Gabriela González Department of Physics and Astronomy Louisiana State University for the LIGO Scientific Collaboration Dec.
Design VASG Kicks-Off VHDL 200x Stephen Bailey Chair.
ESY NUTS AND BOLTS. 2 Extended School Year weeks - June 12 - July 13 5 weeks - June 12 - July 13 Closed July 4 (July 3?) Closed July.
LIGO-G R LSC Presentations Policy: a proposal for procedures David Shoemaker and Peter Saulson LSC, Livingston 14 March 2001.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
Lessons Learned Process – A Strawman.  Lessons Learned  “To pass on any lessons that can be usefully applied to other projects”  “The data in the report.
Status of Virgo A. Viceré INFN-Firenze – Università di Urbino.
LSC at LHO LIGO Scientific Collaboration - University of Wisconsin - Milwaukee 1 Data Analysis Summary Alan Wiseman G040xxxx-zz.
1 Feedback from the executive committee meeting Benno Willke GEO meeting, Glasgow October 2006.
1 GEO outlook Benno Willke (presented by Bernard Schutz) LSC meeting, MIT Nov 2006.
Overview of CEOS Actions in Support of GEO Work Plan Ivan Petiteville CEO ESA 1 23 rd CEOS Plenary I Phuket, Thailand I 3-5 November2009.
PSCIOC-PSSDC Workplan Coordination Strategy– Draft Coordination Committee Telecon
LIGO-G D What can we Expect for the “Upper Limit” Run Stan Whitcomb LSC Meeting 13 August 2001 LIGO Hanford Observatory A Personal Reading of.
LIGO-G M Organization and Budget Gary Sanders NSF Operations Review Caltech, February 26, 2001.
LIGO-G Z LIGO at the start of continuous observation Prospects and Challenges Albert Lazzarini LIGO Scientific Collaboration Presentation at NSF.
LIGO-G What comes next for LIGO? Planning for the post-detection era in gravitational-wave detectors and astrophysics Gabriela González, Louisiana.
AGS RSVP Weekly Meeting P. Pile 2 December 2004 AGS RSVP Weekly Meeting 2 Dec 2004 Useful Links: RSVP Project : C-AD AGS Project: Office.
Searches for Compact Binary Coalescences in LIGO and Virgo data Gabriela González For the LIGO Scientific Collaboration and the Virgo Collaboration APS.
LIGO-G Z Detector Characterization Summary K. Riles - University of Michigan 1 Summary of the Detector Characterization Sessions Keith.
LIGO-G M Collaboration With Virgo Gary Sanders LSC Meeting Baton Rouge March, 2001.
Lead from the front Texas Nodal 1 Texas Nodal Market Implementation ERCOT Board Of Directors – August 15, 2006 TPTF Meeting August.
WG3 Report Michele Punturo Harald Lück. WG3 composition Co-Chairmen M.Punturo INFN Perugia, Italy H.Lück MPI für Gravitationsphysik, AEI, Hannover, Germany.
LIGO- G D E7: An Instrument-builder’s Perspective Stan Whitcomb LIGO Caltech LSC Meeting Upper Limits Plenary Session 22 May 2002 LIGO Livingston.
International Gravitational Wave Network 11/9/2008 Building an Stefan Ballmer, for the LIGO / VIRGO Scientific Collaboration LIGO G
LIGO-G M LIGO Status Gary Sanders GWIC Meeting Perth July 2001.
LIGO-G M Overview of LIGO R&D and Planning for Advanced LIGO Detectors Gary Sanders NSF R&D Review Caltech, January 29, 2001.
LIGO-G Z Detector Characterization Issues K. Riles - University of Michigan 1 Detector Characterization Issues -- S2 Analysis & S3 Planning.
LIGO-G Z Detector Characterization Issues K. Riles - University of Michigan 1 Introduction to Detector Characterization Sessions Keith.
GEOSS Common Infrastructure Initial Operating Capability Directions and Discussion Presented to GEO ADC Geneva May
LIGO-G ZRai Weiss LSC Session on Scientific Monitoring March 21, 2006 Committee formed by Peter Saulson to: Consider the value and effectiveness.
ESMF Change Review Board Robert Ferraro ESMF Board Meeting Dec 17, 2008 Climate Data Assimilation Weather.
Agenda item 2.2 Progress on Target 1 Developments since CGBN of March 2012 CGBN Co-ordination Group for Biodiversity and Nature 13 th meeting – 06/09/12.
Summary of HEP SW workshop Ian Bird MB 15 th April 2014.
LIGO-G W “Astrowatch” at LIGO Hanford Observatory Fred Raab LIGO Hanford Observatory.
LIGO-G M Overview of the LIGO Continuing Operations (FY FY2006) Proposal Gary Sanders LIGO PAC9 Meeting December 2000.
PX444 – The Distant Universe Lecture 13 The History of Star Formation.
LIGO-G Z Detector Characterization Summary K. Riles - University of Michigan 1 Summary of the Detector Characterization Sessions Keith.
User Acceptance Testing The Hard Way Graham Thomas BCS SIGIST 10 th May 1996.
Market Evolution Program. 2 Topics Overview of the Market Evolution Program Consultation Plan for Phase 1 Overview of the Market Evolution Program Consultation.
Gravitational Wave Data Analysis  GW detectors  Signal processing: preparation  Noise spectral density  Matched filtering  Probability and statistics.
All The future of DC work. GEO DC workshop June Restructuring of DC and Detector Work for many reasons the DC work was not very efficient in the.
LIGO R&D1 Proposed Changes in LSC Publication Policy Committee »Jim Hough, Nergis Mavalvala, Dave Reitze, Kip Thorne »Input from Alan Wiseman Charge »to.
July 4 th, 20061/5 Highlights from the LIGO-Virgo F2F Highlights from the LIGO-Virgo F2F and consequences for the DA groups A.Viceré.
October 2006, LIGO Hanford Observatory
NA61 news and plans News from other labs/experiments
Presented to the Project Certification Committee on June
Stan Whitcomb LSC meeting Livingston 21 March 2005
Stan Whitcomb LSC meeting Hanford 15 August 2005
Update on Status of LIGO
Optimisation of Entry Capacity Modification Proposal
05/08/09.
Revised Tender Timescale for DN Interruption Arrangements
Presentation transcript:

LIGO-G W News From Joint Run Planning Committee Roberto Passaquieti & Fred Raab 23May2007

LIGO-G W Passaquieti/Raab: News From JRPC2 Joint Run Planning Committee (JRPC) Committee members and co-chairs appointed by 13Mar07 Luncheon meeting of members attending March LSC meeting in Baton Rouge »Identified run coordination and scenarios as main issues Received charge 2Apr07, with short-term items: »Coordination for S5 joint running »Scenarios for post-S5 to S6 era Bi-weekly JRPC telecons were held on 13Apr07, 27Apr07 and 11May07 »Most run coordination issues settled »Progress has been made on scenarios

LIGO-G W Passaquieti/Raab: News From JRPC3 Consensus achieved on coordination for S5: Run coordinators LIGO has an S5 run coordinator, Vern Sandberg Hanford, Livingston and GEO have local run coordinators, which rotate on a schedule determined by each local site R. Passaquieti will act as Virgo run coordinator, empowered to make decisions affecting Virgo’s operation during S5 LIGO has an S5 Run Coordination Telecon, at 19:15 UTC, attended by representatives of all LSC working groups and LIGO-Lab and GEO people with major run responsibilities Virgo is invited to attend the run planning telecon; because of the large attendance and the relatively short time left in the S5 run, LIGO would prefer not to change this meeting time

LIGO-G W Passaquieti/Raab: News From JRPC4 Consensus achieved on coordinationfor S5: Run Interruptions Virgo will adopt similar schedule to LIGO for interrupts to science mode (recording search data): »4-hr weekly maintenance window for contractors and other large- disturbance activities »H1, H2 and L1 synchronize maintenance at 08:00 to 12:00 PT in US; European detectors will synchronize to a different time window appropriate to their time zone; easy and supplies good coverage »Up to 25 hours/month at each site may be dedicated to “commissioning” (or “troubleshooting”) activities, which require near-science-mode conditions; coordinated between sites »This “commissioning” time will be coordinated by run coordinators to optimize amount of time with 2-3 of the large detectors operating in coincidence, while providing a good degree of coverage

LIGO-G W Passaquieti/Raab: News From JRPC5 Consensus achieved on coordination forS5: Calibrations & Injections Time-consuming calibration checks are done as part of “commissioning” time allotment »LIGO & Virgo do not expect to need such calibration time during the 4 months beginning May 18 Hardware injections will be done during science mode, with appropriate flags recorded; not expecting to consume much integrated time Simultaneous hardware injections are highly desired by analysis groups but will not be required »Requires mods to real-time software with risk to de-stabilize Virgo »A best effort will be made to implement before end of run

LIGO-G W Passaquieti/Raab: News From JRPC6 Scenarios for operating in post-S5 to S6 era A subcommittee – Adhikari(chair), Punturo, Riles, Vicere and Willke – was formed to investigate and bring a strawman recommendation to full committee DAC asked to consider GEO-only coverage »discussion was held but no consensus emerged on whether a triggered GEO-only paper would be publishable Subcommittee found general consensus: »Highest priority: enhance capabilities of the largest interferometers as rapidly as possible. »Secondary priority: provide best coverage possible. »Some science/engineering running desired by large detectors in 08. »Stawman schedule developed on this consensus view. »Request for DAC to discuss significance of any benefits of delaying enhancement and running one of the larger detectors. »Subcommittee will investigate/document what flexibility exists, given “political” commitments by LIGO and Virgo.

LIGO-G W Passaquieti/Raab: News From JRPC7 Strawman schedule discussed at JRPC telecon of 27Apr07 with political constraints GEOVirgoH1/L1H2TAMA Summer 07 ? S5 Join S5 (?) Dec 07runningoffline Astrowatch late 08some short engineering or science runs June 09 Start GEO HF work at S6 start start S6 With LIGO start S6 Feb 2011GEO HFAdv VirgoAdv LIGO LCGT R&D Need 1 yr coincident data Want 1 yr coincident data

LIGO-G W Passaquieti/Raab: News From JRPC8 Procedure to end S5 Will need significant time following end of science running, before releasing machines »Required calibration checks »Documentation work »Post-run commissioning for lessons learned Vern Sandberg will propose a schedule for this work to LSC Operations Committee (LSC-OC) by mid May for committee review/recommendation On same time scale, Fred Raab will ask LSC-OC to recommend date for end of science running »based on projections by D. Sigg, 1-yr triple LIGO triple-coincidence will be achieved by end of September 2007 »That date allows 4 months of LIGO/Virgo science running during S5

LIGO-G W Passaquieti/Raab: News From JRPC9 Latest Predictions for End of 1 Year of Triple Coincidence

LIGO-G W Passaquieti/Raab: News From JRPC10 Latest Predictions for End of 1 Year of Hanford/Livingston Coincidence