0 CapX 2020 - 10/1/2015 CapX 2020 Transmission Plan: Ensuring Reliable Electricity.

Slides:



Advertisements
Similar presentations
Central California Clean Energy Transmission Project PCC Meeting Vancouver, BC October 24, 2007.
Advertisements

CapX 2020 Transmission Expansion Plan Realizing the CAPX2020 Vision South Dakota Energy Infrastructure Authority June 9, 2006 Terry Wolf, Missouri River.
AN INTRODUCTION TO THE MIDWEST ISO By Bill Malcolm Manager-State Regulatory Affairs Pierre, South Dakota June 9, 2006.
South Dakota Energy Infrastructure Authority (SDEIA) Inaugural Meeting of State Infrastructure Authorities Rapid City, SD June 13, 2007.
14 th Annual International Legislators Forum EPA Carbon Regulation June 26, 2014 Eric J. Olsen Vice President and General Counsel Great River Energy.
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
Sacramento Local Agency Formation Commission (LAFCo) ANALYSIS OF PROPOSED SMUD SPHERE OF INFLUENCE AND ANNEXATION Presented by Chris Tooker Friday, October.
Rate Plan. Value Story When asked, our customers identify the following topics as ways MidAmerican Energy provides value – Emergency Response.
Wind Energy and Transmission South Dakota Legislative Briefing Pierre, South Dakota January 18, 2006 Beth Soholt Director Wind on the Wires.
Electricity planning and approval in Alberta Laura Bowman staff lawyer Environmental Law Centre January 7, 2010 Bill 50.
General Information on Permitting Electric Transmission Projects at the California Public Utilities Commission June 2009 Presentation created by the Transmission.
Active Citizenship – How A Coalition of St Louis County Townships is Addressing Broadband Needs Scott Mead, Pequaywan Town Board and CVII Steering Committee.
Expanding and Modernizing the Electrical Grid: Essential Infrastructure for the Midwest’s Clean Energy Future Des Moines Public Library Des Moines, IowaOctober.
EirGrid Customer Conference 2009 October 13, 2009 Dublin, Ireland Session 2: Key Industry Challenges “If you love wind, you have to at least like transmission”
Citizens League Electrical Energy: Affordability and Competitive Pricing Working Team Electric Transmission.
Twin Cities Minnesota Zone Meeting Xcel Energy October 27, 2004 St. Paul, MN.
Buffalo Ridge Incremental Generation Outlet (BRIGO) Transmission Study Presentation to National Wind Coordinating Committee June 22, 2005 W Grivna, PE.
Transmission Transporting Energy by Wire Matthew Stoltz Basin Electric Power Cooperative 1 1.
1 Dale Osborn Midwest ISO February 27, Wisconsin Renewable Energy Summit Transmission Expansion Opportunities with Wind Energy.
Stakeholder Information Update Edmonton-Calgary 500 kV Transmission Development December 14, 2005 Introduction Neil Millar, vice-president, Transmission.
The Status Of The Electric Grid In ERCOT The Electric Reliability Council Of Texas Sam R. Jones, P.E. ERCOT – Retired As a retiree of ERCOT this presentation.
IMPERIAL VALLEY CONFERENCE July 21, SOLICITATION RENEWABLES PORTFOLIO STANDARD.
Despite Order No Planning Gaps for (Certain) Merchants OPSI Annual Meeting 2013.
Montana Ambassadors Helena, Montana February 25, 2011.
Potential Transmission Construction Scheduling In Southern Minnesota--- Fall Spring 2006 Xcel Energy has posted Significant Transmission construction.
1 Transmission Development at Ameren and in the Midwest ISO Mid-America Regulatory Conference Maureen A. Borkowski June 8, 2010.
CapX 2020 Transmission Initiative Progress Through An Alliance Approach American Public Power Association E & O Technical Conference Atlanta, Georgia April.
Charles Hosken, General Manager Imperial Irrigation District
PJM© PJM Confidential PJM Generation Interconnection Overview Virginia Offshore Wind Conference Virginia Beach June 22, 2011 Paul McGlynn General.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
Wyoming Infrastructure Authority Developing Electric Infrastructure for the Future of the West Energy Gateway Update Presented by Darrell T. Gerrard Vice.
Need for Transmission Investment 2010 Mid-American Regulatory Conference AEP.
ATC Major Projects Update Flora Flygt, Director of System Planning Franc Fennessy, Manager of Local Relations Wisconsin Industrial Energy Group August.
The Need for Electric Transmission Improvements in Dane County.
Eagle Crest Energy Company February Page 2 New Hydro: Making it Happen Background on the Eagle Mountain Pumped Storage Project Need for Eagle.
Electric Energy Resources Chris Nelson Commissioner SD Public Utilities Commission October 2012.
Successful Transmission Planning & Development in the West Kelly Barr Manager, Regulatory Affairs & Contracts Salt River Project Phoenix, Arizona June.
ISAC Fall School November 30, 2012 Iowa’s Wind Energy Industry & Economic Impact.
NSP System. NSP Supply Plans: Generation and Transmission Betsy Engelking Betsy Engelking Director, Resource Planning Director, Resource Planning Xcel.
CapX 2020 facilitates coal Carol A. Overland Utility Regulatory Attorney
Public Information and EIS Scoping Meeting Glyndon, MN - February 4, 2009 For the Noble Flat Hill Windpark & 230 kV Transmission Line Project.
Using a Dispersed Strategy in Your Region By Mike Michaud Matrix Energy Solutions Edited and Presented By Brian Antonich Windustry.
CWAG ENERGY CONFERENCE BIG SKY, MT Collaborative Efforts to Find Solutions: A Case Study – The Mountain States Transmission Intertie (MSTI) Presented by.
California Energy Commission Renewable Energy Transmission Initiative (RETI) Part I Jeffrey D. Byron California Energy Commission Energy Action Plan (EAP)
Iowa State University Ames, IA July 5, 2011 Wind on the Wires – Wind and Transmission Issues Beth Soholt Wind on the Wires
Renewables Integration Development Project North West of the Island of Ireland Louis Fisher, EirGrid.
MISO Northwest Exploratory Study Presented to National Wind Coordinating Committee Participants in study – MISO, Various utilities in Minnesota, North.
Cost Allocation Proposals associated with MISO Transmission Expansion WIEG Board Meeting May 6, 2010 WIEG Board Meeting May 6, 2010 Presented by: Kavita.
Chelan County PUD PURPA Hearing Fuel diversity Fossil fuel efficiency Chelan County PUD November 19, 2007.
Southwest Renewable Energy Transmission Conference May 21, 2010 This report contains transmission planning data that may be conceptual in nature and is.
1 Sunrise Powerlink Project Update Orange County Business Council March 10, 2009.
Reliable Power Reliable Markets Reliable People Hanna Region Transmission Development Ramaiah Divi, P.Eng Manager, Central System Planning.
1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO.
Big Stone II – Delivery Study Phase 6 and Supplemental #2 For Northern MAPP SPG Meeting 4/3/07 Elk River Richard Dahl Missouri River Energy Services.
June 2008 Windsor-Essex Electrical Service Needs and Solutions.
Advanced Metering Rule Christine Wright Public Utility Commission of Texas June 6, 2007 Retail Market Workshop COMET WG Meeting.
Bob Cupit Manager, Energy Facility Permitting Minnesota Public Utilities Commission.
© 2000 PACIFICORP kV LINE WALLA WALLA – WALLULA – Mc NARY 500 kV LINE HEMINGWAY – CAPTAIN JACK – REGIONAL PLANNING MEETING REGIONAL PLANNING PROJECT.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
November 16, 2012 Terry Wolf, Manager of Transmission Services.
Kansas City Power & Light and KCP&L Greater Missouri Operations – Suggestions for Chapter 22 Revisions Missouri Public Service Commission Meeting Aug 31,
Excelsior Energy’s Mesaba Energy Project
Excelsior Energy’s Mesaba Energy Project
Fifth Standard Solar Project Complex
Transmission Planning at PJM Interconnection LLC
Department of Environmental Quality
Environmental Assessment PUC Application Process
Department of Environmental Quality
Beth Soholt Director Wind on the Wires
Excelsior Energy’s Mesaba Energy Project
Presentation transcript:

0 CapX /1/2015 CapX 2020 Transmission Plan: Ensuring Reliable Electricity

1 CapX /1/2015 Need for Reliable Electricity Projected Population Growth: 1.3 million by 2050  Projected Job Growth: 500,000 new jobs by 2012  Projected Electric Demand Growth: 4,500-6,300 MW by 2020 CapX 2020 projects will ensure the region has reliable electricity to power homes, businesses and farms for decades to come Transmission will enable more wind and renewable energy to come on-line

2 CapX /1/2015 Project Groups Project Group Proposed In- Service Group I SE Twin Cities-Rochester-LaCrosse / 345kV Bemidji-Grand Rapids/ 230 kV Fargo-St. Cloud/Monticello / 345kV Brookings, SD-SE Twin Cities / 345 kV Group II – Around the Twin Cities New 345 KV transmission loop around the Twin Cities 2014 to 2020 Group III – Remote Generation Outlet As needed and generation projects developed2014 to 2020

3 CapX /1/2015 Group I Projects Four lines work together to ensure reliability for the region Lines meet most urgent need Lines will serve as outlet for whatever generation resources are built (These corridors are preliminary)

4 CapX /1/2015 Group 1 Project CapX Brookings, SD – SE Twin Cities Improves reliability in West Central Minnesota, Minnesota River Valley and Twin Cities; access to new generation, including wind Scope: approx. 250 miles, 345 kilovolt Proposed in-service:

5 CapX /1/2015 Lyon Cty

6 CapX /1/2015 Brookings-Twin Cities 345 kV Studies Based on SW MN → Twin Cities EHV Development Electric Transmission Study Completed November 2005 Additional studies Generation Alternative System Adjustments: MISO Queue additions – Lake Marion Xfmr Overload Combined CapX Group I Loss Analysis Local Load Serving Marshall, Franklin, Lake Marion, New Ethanol Loads Underlying system study

7 CapX /1/2015 Additional CapX Efforts Cost Allocation: MISO RECB Analysis MISO: Baseline Reliability Study – MTEP Communications Team has been presenting the projects at several county & township groups along the potential route. CapX team filed Exemption Filing, Comments regarding the filing have been received from DOC, NAWO, Windustry, Overland Law Office & Prairie Island Indian Reservation. Notice Plan filing before CON Filing. 30 Days before CON Filing. Permitting team will determine when to file Notification Plan when CON is nearing completion.

8 CapX /1/2015 Minnesota PUC CON Timeline Q3 2006Q4 2006Q1 2007Q2 2007Q3 2007Q4 2007Q File Notice Plans File Notice Plans Implement NPs Implement NPs File CON File CON Issued CON Issued Project Communications Notice Plans Approved Notice Plans Approved Hearings Briefs Reply Briefs Briefs Reply Briefs CON Review Data Requests Environmental Review CON Review Data Requests Environmental Review Prepare CON Prepare CON Oct 4, 2006 Route Development for All Four Projects Agency/Gov’t Consultations Public Meetings Separate but coordinated efforts Route Development for All Four Projects Agency/Gov’t Consultations Public Meetings Separate but coordinated efforts Opportunities for Public Involvement

9 CapX /1/2015 Contacts Randy Fordice— ;