Hydrosystem Operations and Fish Recovery in the Columbia River Basin U

Slides:



Advertisements
Similar presentations
Survival Estimates for the Passage of Juvenile Salmonids Through Dams and Reservoirs of the Lower Snake and Columbia Rivers (Project ) CBFWA March.
Advertisements

Implement Wy-Kan-Ush-Mi Wa-Kish- Wit Watershed Assessment and Restoration Plan Now A Regional Support Program Sponsored by the Columbia River Inter-Tribal.
Evaluate Spawning of Fall Chinook and Chum Salmon Just Below the Four Lowermost Columbia River Mainstem Dams Project PNNL.
CSMEP Goal: Improve the quality and consistency of fish monitoring data, and the methods used to evaluate these data, to answer key questions relevant.
Rebecca A. Buchanan Columbia Basin Research School of Aquatic and Fishery Sciences University of Washington Seattle, WA INVESTIGATING MIGRATORY PROCESSES.
Passage Behavior and Survival for Radio-tagged Subyearling Chinook Salmon at Ice Harbor Dam, 2006 Fish Ecology Division Northwest Fisheries Science Center.
Overview of Current Production Programs Across the Columbia River Basin.
NWHA- Panel Discussion “Spawning Better Ideas for Fish Passage”
So Goes the Nation? Salmon Recovery in the Pacific Northwest Glenn Vanselow Pacific Northwest Waterways Association National Waterways Conference Portland,
Columbia River Inter-Tribal Fish Commission 1 Columbia River Treaty 2014/2024 Review Paul Lumley, Yakama, CRITFC Executive Director Northwest Hydroelectric.
TRIBAL DATA NETWORK COLUMBIA RIVER INTER-TRIBAL FISH COMMISSION.
C. A. Peery, M. L. Keefer, and S. R. Lee Idaho Cooperative Fish and Wildlife Research Unit U.S. Geological Survey and Northwest Fisheries Science Center.
April Runoff Forecasts for the Columbia Basin and Power Supply Implications Jim Ruff and John Fazio Council Meeting April 14, 2010 Boise, ID.
1 Columbia River Salmon Opportunities for Success Presentation to the Pacific Northwest Waterways Association by the Columbia River Inter-Tribal Fish Commission.
Modeling Flood Control Flexibility using the GENESYS Hydro Model Kyle Martin Mainstem Hydrologist Columbia River Inter- Tribal Fish Commission Portland,
31 DECEMBER VARIABLE FLOOD CONTROL DRAFT FOR LIBBY RESERVOIR U.S. Army Corps of Engineers Northwestern Division, North Pacific Region.
Federal Columbia River Power System Operations Planning.
COLUMBIA RIVER SALMON AND STEELHEAD RETURNS FPAC and TMT – March 2013 Presented by: Washington Department of Fish and Wildlife.
Variation in Straying Patterns and Rates of Snake River Hatchery Steelhead Stocks in the Deschutes River Basin, Oregon Richard W. Carmichael and Tim Hoffnagle.
Columbia River salmon : Who (or what) will save them? John Williams Klarälven meeting in Karlstad 9 May 2011.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N McNary Dworshak Anderson Ranch Palisades Ice Harbor Grand Coulee Revelstroke Lower Monumental.
Recent Events in Water Law and Policy in the United States Portion of the Columbia Basin The Federal Columbia River Power System: Pacific Salmon and the.
Overview of the Impact of Research and Monitoring in the Columbia River Basin Rob Clapp Gary Rule Blane Bellerud Ritchie Graves.
Survival of Migrating Salmonid Smolts in the Snake and Lower Columbia Rivers, 2009 Technical Management TeamDecember 11, 2009 Lessons Learned 2009 Bill.
1 Mainstem Passage Strategies In The Columbia River System: Transportation, Spill and Flow Augmentation Presented By: Albert Giorgi, Ph.D.
Salmon and Energy: Do We Have Enough Power to Remove the Dams? by Katherine Hausrath
2014 Program Goal Statements for Salmon and Steelhead Overview Nancy Leonard, Laura Robinson and Patty O’Toole (NPCC)
ISAB Snake River Spill-Transport Review ISAB – Presentation to Council September 17, 2008.
BUILDING STRONG SM 1 Columbia River Salmon and Federal Columbia River Power System Rock Peters Senior Program Manager.
2010 Yakima Basin Science & Management Conference Yakima River Basin Study June 16, 2010 Joel Hubble, Technical Projects Biologist Columbia-Cascades Area.
John M. Volkman June 13, 2003 Either/Or? Is it Hydropower or Salmon in the Northwest?
BUILDING STRONG ® PORTLAND DISTRICT 1. BUILDING STRONG ® PORTLAND DISTRICT 2 BiOp Performance Standards for Dam Passage Survival RPA RM&E Actions - Strategy.
Columbia River Basin Dams FCRPS--29 federal dams (USACE and BOR) Hydropower (50-65% of the region’s needs) Flood control Irrigation Recreation Navigation.
COMPARATIVE SURVIVAL STUDY Chapter 3: Annual SAR by study category and ratios of SARs Comparisons of SARs Transport to In-River By hatchery group Hatchery.
The Columbia River Basin Where we’ve been. Where we’re going. October 18, 2005.
Fiscal Year 2004 April 10, FY 2002FY 2003FY 2004 EnactedBudgetBudget COLUMBIA RIVER BASIN: Army Corps of Engineers Bureau of Land.
FCRPS Adaptive Management Implementation Plan (AMIP) 1 September 15, 2009.
Washington’s Lower Snake River Compensation Plan Steelhead Program – A retrospective and program adaptive management overview Mark Schuck and Joe Bumgarner.
Howard Schaller PSMFC Annual Meeting September 24, 2013 Comparative Survival Study Outcomes – Experimental Spill Management 1.
CSS Oversight Committee ISAB November 15, 2013 Comparative Survival Study Outcomes – Experimental Spill Management 1.
Downstream Survival of Juvenile Stream Type Chinook Salmon and Steelhead Through the Snake/Columbia River Hydropower System and Adult Return Rates AFEP.
2005 Preliminary Summer Spill Data Fall Chinook Radiotelemetry Studies Performed by USGS – BRD, NOAA – NWFSC For the USACE Anadromous Fish Evaluation Program.
Findings of Congress The Endangered Species Act is the last resort for species at risk of extinction. Under the ESA, the National Marine Fisheries Service.
Energy Beyond Hydropower Atlas Chapter 13 Figure 13.1 – Energy Consumption No PNW sources of natural gas or crude oil Refining crude oil – 4 north Puget.
Cost and Energy Impacts of Fish and Wildlife Operations NW Power Planning Council April 3, 2002 Boise, Idaho.
2005 Subyearling Migration Fish Passage Center. Overview – summer migration Court ordered summer spill occurred from June 20 to August 31, 2005 Question.
Survival and Behavior of Juvenile Chinook Salmon in the Lower Columbia River, Estuary, and Plume G. A. McMichael 1, R. L. McComas 2, J. A. Carter 1, G.
Estuary Actions for Salmon and Steelhead Columbia River Estuary Science Policy Exchange September 10-11, 2009 NOAA 2008 FCRPS Biological Opinion Estuary.
Implementation of the Lower Columbia River Recovery Plan Northwest Region August 19, 2013.
Columbia River Basin Fish Restoration Activities ACCOMPLISHMENTS TO DATE AND UPCOMING ISSUES Bonneville Legal Briefing – October 2015.
Northwest Power Planning Council Fish and Energy Impacts Resulting from Reductions in Summer Bypass Spill July 16, 2003.
1 The Collaborative, Systemwide Monitoring and Evaluation Project (CSMEP) CBFWA – Ken MacDonald ESSA Technologies Ltd. - Marc Porter State Agencies IDFG.
Performance of a New Steelhead Line Derived from Hatchery Parents Collected in Autumn in the Grande Ronde River Lance Clarke, Michael Flesher, Shelby Warren,
Implementing Hatchery Reform The Dawn of a New Beginning or more of the same old thing? Mike Delarm NOAA Fisheries.
Upstream passage success rates and straying of returning adults Presenter: Jack Tuomikoski CSS Annual Meeting Apr 2 nd 2010.
Historical Review Fish Migration Data. Two Management Approaches Spill for Fish Passage Planning dates Percent passage dates.
US Army Corps of Engineers Draft 2009 Kelt Management Plan.
COLUMBIA BASIN KELTS: ABUNDANCE, DOWNSTREAM PASSAGE, AND REPEAT SPAWNING.
Flow Meeting 2004 Biop Litigation September 29, 2005 Jim Litchfield Montana.
Northwest Fisheries Science Center Technical Management Team
Comparative Survival Study Annual Meeting
Age at ocean entry of Snake River Basin fall Chinook and its significance to adult returns prior to summer spill at LGR, LGS, and LMN dams.
Northwest Fisheries Science Center Technical Management Team
2017 TMT Year-end Review December 12, 2017 Brandon R. Chockley
Fall Chinook Management Measures
Direct Survival of Migrating Salmonid Smolts in the Snake and Lower Columbia Rivers: Update with 2007 Results Northwest Power and Conservation Council.
Science Policy Exchange
NOAA Mainstem PIT Tag Research
Behavior and Survival for Juvenile Salmonids Passing Ice Harbor Dam during reduced and BiOp spill treatments, Gordon Axel, Eric Hockersmith, and.
Modifications to TDG Monitoring and Tracking
Presentation transcript:

Hydrosystem Operations and Fish Recovery in the Columbia River Basin U Hydrosystem Operations and Fish Recovery in the Columbia River Basin U.S. Army Corps of Engineers Northwestern Division June 19, 2008

Today’s Discussion Federal Columbia River Power System (FCRPS) Remand Process The Columbia Basin Fish Accords Key Biological Opinion Actions

2008 FCRPS Remand Process Product of two years of collaboration among four federal agencies, four Northwest states and seven Northwest tribes. Comprehensive biological analysis for each listed stock and “population” Historical trends Current condition Benefits of proposed actions in all Hs Goal is trend to recovery

2008 FCRPS Remand Process (continued) Juvenile in-river survival is nearly three times higher than it was in the mid-to-late 1970s. Adult migration rate and travel time are similar to levels before the Snake River dams were completed.

Estimated Dam Survival 91.7% Bonneville Dam 1995–1999 Route of Passage Survival Estimates for Yearling Chinook Bonneville 2 B2 survival = 90% Corner Collector Survival = N/A Spillway survival = 98% Spillway Bonneville 1 B1 survival = 90% Estimated Dam Survival 91.7% Route Specific Survival Estimates from PATH Report and 2000 BiOp Spring Spill Operations: 75 kcfs day/ 120 kcfs (Gas Cap) night

Estimated Dam Survival 95.9% Bonneville Dam 2004 & 2005 Route of Passage Survival Estimates for Yearling Chinook Bonneville 2 B2 Bypass survival = 98.9% B2 Turbine survival = 95.8% Spillway survival = 92.0% Spillway Corner Collector Survival = 100.0% Combined Turbine & Sluiceway survival = 93.1% Bonneville 1 Estimated Dam Survival 95.9% Spring Spill Operations: 100 kcfs 24 hrs/day Counihan et al. Final report by USGS

2008 FCRPS Remand Process (continued) All H approach (Hydro, Habitat, Hatcheries, Harvest) with significant actions on predation management Reasonable and Prudent Alternative that includes 73 Actions Includes Adaptive Management provisions including extensive RM&E program Annual progress reports and check-ins at 2013 and 2016 will contain diagnostic analyses Continued collaboration with states and tribes

Columbia Basin Fish Accords Signed May 2, 2008

Columbia Basin Fish Accords Signed Accords with Confederated Tribes of the Umatilla Indian Reservation The Confederated Tribes of Warm Springs Yakama Indian Nation Confederated Tribes of the Colville Reservation Columbia River Inter-Tribal Fish Commission Montana Idaho Costs over 10 years $900 million incurred by the Bonneville Power Administration $50 million from the Corps of Engineers for Pacific lamprey Significant Benefit Hundreds of “on the ground” habitat projects based on recovery plans with demonstrated biological benefits New hatchery actions to promote recovery and regional fisheries, without impeding recovery of listed fish.

2008 FCRPS Biological Opinion Flows Spill and transport operations timed to the needs of individual species Expanded habitat program Expanded predation-management program Timetable and commitments for site-specific hatchery reforms Specific mainstem hydro improvements

Flows Flow augmentation similar to 2000 BiOp, except for: Implementation of summer operations at Libby and Hungry Horse dams recommended by the State of Montana Work on dry water year strategy for Grand Coulee Dam John Day – Operate John Day pool at the lowest elevation that continues to allow irrigation from April 10 through September 30. Lower Snake – Operate at minimum operating pool (MOP) elevation from April 3 until small numbers of juvenile migrants are present unless adjusted to meet authorized project purposes.

Spill Operations Spring Summer 24-hour spill at all projects Lower Snake collector projects–spill ceases for two weeks in May for transport of steelhead Continue testing of spill as new surface collectors come online Earlier transition from spring to summer spill Summer Similar spill levels as in 2006–2008 Snake River projects–Cessation of spill in August when few fish are present (300–500)

Juvenile Fish Transportation Program Spring Chinook typically benefit from transportation after approximately April 20 Steelhead typically benefit from transport throughout the season Fall Chinook research is in progress Sockeye has too little data to tell

Future Hydro Improvements $500 million over 10 years Commitment to higher dam passage performance standards: 96% average or better survival for spring migrants 93% average for summer migrants Scheduled commitments to additional surface collectors (RSWs/TSWs) Improvements to juvenile bypass systems

Spillway Improvements 2004, New spill wall 2010 Idaho Lower Columbia and Snake River Dams Washington River Juvenile Surface Passage Improvements Columbia Lower Monumental 2008 Little Goose 2009 Ice Harbor 2005 The Dalles Spillway Improvements 2004, New spill wall 2010 Pacific Ocean Columbia River Lower Granite 2001 McNary 2009-2012 Snake Bonneville 2004 John Day 2008-2012 Oregon = Transport Facilities River (all dates subject to change)

Surface Collection Advantages Fish pass at normal vertical distribution Reduce forebay delay Improved efficiency for passage Potential improvement in total dissolved gas Kelt passage

Surface Bypass Spillway Weirs

Spillway Weirs McNary Dam McNary dam currently in second year of testing TSW’s (shown in picture) John Day Dam testing TSW’s this year Spillway Weirs McNary Dam

Litigation: NWF v. NMFS, Corps, & Reclamation Remand completed with issuance of 2008 BiOp on May 5 Court-ordered hydro operations remain in effect until Aug 31, 2008 NWF et al. filed complaint against NMFS with U.S. District Court of Oregon, challenging new BiOp Plans to sue Corps and Reclamation challenging compliance with ESA and CWA Briefing on the merits will begin mid-summer; schedule is being set to allow time for preliminary injunction hearing before the end of calendar year Anticipate PI to be broader in scope than mainstem spill operation

Questions ?

Initial Spill Operations under the new BiOp Project Spring Operations Summer Operations Planning Dates Volume (Day/Night) Volume (Day/Night) Lower Granite 4/3-5/6 5/21-5/30 20 kcfs 6/1-8/31 18 kcfs Little Goose 4/5-5/6 30% L. Monumental 4/7-5/6 27 kcfs 17 kcfs Ice Harbor 30% vs (45kcfs/gas cap) 6/16-8/31 30% vs (45kcfs/gas cap) McNary 4/10-6/15 40% 40% vs 60% John Day 30% vs 40% The Dalles Bonneville 100 kcfs (85kcfs/gas cap)

Resulting Transport Operations Spring Operations Spill and Bypass April 3 – April 20 Spill and Transport April 21 – May 6 Maximized Transport May 7 – 20 Resume Spill and Transport May 21 ~ June 1 or until Fall Chinook predominate Summer Operations Spill and Transport (~June 1 ~ Aug 31) In August, spill will be curtailed after Aug 1 when fewer than 300 juvenile fall Chinook per day are collected