07-Apr-2014-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.

Slides:



Advertisements
Similar presentations
CESG, Fall 2011, 5 th November 2011 Stuart Fowell, SciSys Device Virtualisation and Electronic Data Sheets.
Advertisements

November SLS RFM and RNG REPORT 18 November 2004.
7-Apr-2014-cesg-1 Joint CMC-CESG Meeting NH Conference Centre, Nordwijkerhout, Netherlands Hosted by ESA/ESTEC 7 April 2014 CCSDS Engineering Steering.
30-March-2015-cesg-1 Martin Suess (AD) Rick Barton (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
Spacecraft Onboard Interface Services Application Support Services Working Group (SOIS-APP WG) CCSDS Spring 2013 Meeting.
Sep 2003 CCSDS Navigation WG Progress Report MOIMS Meeting Oct 2003 CSC, Maryland, USA Felipe Flores-Amaya CCSDS Navigation WG.
Apr12-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
07-Apr-2014-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
Cesg-1 June 2010 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
Future Plans for Wireless Standards Development Richard J. Barton NASA Johnson Space Center.
10-Dec-2012-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
SSIART – Smart Sensor Inter-Agency Reference Test bench Activity Presentation October 2010 Jean-François Dufour ESA/ESTEC/TEC-EDD.
Symmetric Key Management Books Development Plan Daniel Fischer (ESA) Ignacio Aguilar Sanchez (ESA) CCSDS Spring Meeting 2010 | Portsmouth, VA.
31 st October – 4 th November 2011 Fall 2011 Meeting Agenda Boulder, Colorado, USA SOIS Application Support Services WG Conclusions & Actions.
ESA UNCLASSIFIED – For Official Use Workshop #23 Pasadena, USA 23-27Mar15 Mario Merri, ESA/ESOC SM&C WG Plenary.
Chris Taylor TEC-EDS 1 SOIS Prototyping Activities CCSDS SOIS Berlin 2008 C. Taylor ESA- ESTEC.
May11-cesg-1 status:OKCAUTIONPROBLEM comment: Very Good SOIS Area Report Wireless WG Goals for the spring meeting Complete the discussions and agree on.
16 th – 19 th April 2012 Spring 2012 Meeting Agenda Darmstadt, Germany SOIS Application Support Services WG.
PS 1 12 June 2006 SEA Opening Plenary Rome, Italy, 12 June 2006.
30-Oct-2009CCSDS SOIS Wireless WG Meeting Summary 1 CCSDS SOIS Wireless WG Fall 2009 Meeting Summary ESTEC.
SOIS Plenary Session Spring 2015 Meeting Chris Taylor ESA.
ESA UNCLASSIFIED – For Official Use SOIS Evaluation by the Primes F. Torelli (ESA) Software Reference Architecture - Focus on the Execution Platform ADCSS.
Ajh January 2007 CCSDS “Books” Adrian J. Hooke CMC Meeting, Colorado Springs 26 January 2007.
1 SOIS Plenary Washington March 2008 Chris Taylor.
ESA UNCLASSIFIED – For Official Use Recap of SOIS Evaluation by the Primes F. Torelli (ESA) CCSDS Spring Meeting, 23/03/2015.
November MOIMS AREA PLENARY NAVIGATION WG REPORT November 2004 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
Nov11-cesg-1 SOIS Area Report Wireless WG Primary Objectives for the fall meeting Establish lessons learned from the Asset Management (AM) Magenta Book.
10-Dec-2012-cesg-1 Keith Scott (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA REPORT.
Wyn Cudlip BNSC/QinetiQ Presentation to WGISS25 China, February 2008 CCSDS Liaison Consultative Committee on Space Data Systems.
CCSDS SOIS Wireless Working Group (WWG) 01-Sep-2015 Monthly Webcon/Telecon 1 CCSDS SOIS Wireless WG Monthly Webcon: 01-Sep Sep-2015.
Information Architecture WG: Report of the Spring 2004 Meeting May 13, 2004 Dan Crichton, NASA/JPL.
Cesg-1 22 October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
1 CCSDS 2007 Fall Meeting SOIS Plenary Chris Taylor Estec (27/09/2007.
Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC,
Apr12-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
CCSDS SOIS Wireless Working Group (WWG) 16-Sep-2015 Monthly Webcon/Telecon 1 CCSDS SOIS Wireless WG Monthly Webcon: 16-Sep Sep-2015.
Information Architecture WG: Report of the Spring 2006 Meeting June 16, 2006 Dan Crichton, Chair NASA/JPL.
ESA UNCLASSIFIED – For Official Use CCSDS SOIS Overview - Fall 2015 Martin Suess 07/10/2015.
Apr12-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
CCSDS SOIS Wireless Working Group (WWG) 04-Aug-2015 Monthly Webcon/Telecon 1 CCSDS SOIS Wireless WG Monthly Webcon: 04-Aug New ESA Wireless WG member.
SEA-1 20 Nov 2014 CCSDS System Engineering Area (SEA): System Architecture WG (SAWG) Restart Peter Shames, SEA AD 20 Nov 2014.
1 SOIS P&P input. 2 Introdcution As part of the work to standardise onboard communication services, the CCSDS SOIS WG has recently delivered new draft.
Cesg-1 28 April October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
Djc -1 Daniel J. Crichton NASA/JPL 9 May 2006 CCSDS Information Architecture Working Group.
1 09 October SOIS Report to CESG/CMC 9 October 2007 Patrick Plancke, C. Taylor.
Information Architecture BOF: Report of the Fall 2003 Meeting October 28, 2003 Dan Crichton, NASA/JPL.
Brainstorming for Future WWG Activities 1.High data rate wireless Blue Book (Start 2012) –PHY and MAC, star topology; we offer a set of recommendations.
07-Apr-2014-cesg-1 Jonathan Wilmot (WG Chair) Ramon Krosley (DWG Chair) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA APP WG.
Delta-DOR SIG Minutes of the meeting Heppenheim, Germany October 2nd, 2007 Roberto Maddè ESA/ESOC
May SPACE LINK AREA MID-TERM REPORT SUMMARY TECHNICAL STATUS 1.DATA COMPRESSION WG Goal : specify an image compression algorithm fulfilling identified.
Security WG: Report of the Fall 2004 Meeting November 19, 2004 Howard Weiss.
Systems Architecture WG: Report of the Spring 2005 Meeting April 14, 2005 Takahiro Yamada, JAXA/ISAS.
Spacecraft Onboard Interface Services Application Support Services Working Group (SOIS-APP WG) CCSDS Spring 2013 Meeting.
Information Architecture WG: Report of the Fall 2004 Meeting November 16th, 2004 Dan Crichton, NASA/JPL.
ESA UNCLASSIFIED – For Official Use Cleveland, OH, USA 04-08Apr16 Mario Merri, ESA/ESOC Brigitte Behal, CNES MOIMS Opening Plenary.
Wireless WG Monthly Teleconference
Fall 2009 Meeting Summary ESTEC
CCSDS SOIS Wireless WG Monthly Webcon: 04-Aug-2015
SOIS Area Report Wireless WG Primary Objectives for the fall meeting
[Area Name] Area Report [Name] (Area Chair) [Name] (Area Deputy Chair)
Future Plans for Wireless Standards Development
SPACECRAFT ONBOARD INTERFACES SERVICES
SPACE INTERNETWORKING SERVICES (SIS) AREA
SOIS-APP Working Group Report Jonathan Wilmot (WG Chair)
Wireless WG Monthly Teleconference
Wireless WG Monthly Teleconference
TECH SESSION #1 ELECTRONIC DATA SHEETS
SPACECRAFT ONBOARD INTERFACES SERVICES
Wireless WG Monthly Teleconference
SPACECRAFT ONBOARD INTERFACES SERVICES
Presentation transcript:

07-Apr-2014-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA

07-Apr-2014-cesg-2 1. Application Support Services WG 2. Wireless WG 3. Subnetwork Services WG SOIS Area Report - Current Working Groups The SOIS area covers onboard communication services with the intention of standardising H/W and S/W interfaces between avionics elements & devices. Wireless activities cover intra-spacecraft, proximity, AIV and RFID Our work is aligned with the European SAVOIR initiative and the WG includes representatives from the US SUMO initiative

07-Apr-2014-cesg-3 SOIS Area Report B. Meeting Demographics WirelessApp Suppt Svcs ASI CNES1 CNSA1 CSA1 DLR ESA22 INPE JAXA NASA45 RFSA21 UKSA 2 Other TOTAL1110 *2 via telecon; CSA & 1 NASA Meeting Duration55 Agency Diversity64

07-Apr-2014-cesg-4 Application Support Services Working Group Goal: Develop SOIS Application Support layer services and if appropriate protocols; develop supporting electronic data sheet schema and dictionary of terms Working Group Status Device Enumeration Service Magenta Book published Electronic Data Sheets Red Book & associated XML Schema - Draft Red book final WG editing Progressing Common Dictionary of Terms Red Book & associated ontology – Draft red book available Draft green Book initiated Status:OKCAUTIONPROBLEM Comment: Resources affecting schedules SOIS Area Report

07-Apr-2014-cesg-5 Application Support Services WG (cont.) Progress Red book on Schema being finalised after merge and working group review Still need to add conformance proforma but have way forward Dictionary of terms Red book reviewed complete and ready to submit SANA entries – would like to establish mechanism for input of OWL files Green book started but behind schedule Several presentations providing implementation feedback JSC AES on Schema Bright ascension on SOIS based Cubesat ESA on implementation by European primes Scisys on new ESA study Sumo – EDS to continue within NASA RapidIO SOIS mapping proposal Acknowledged that we have an iterative process where feedback from implementations is necessary to progress – chicken and egg and lengthening of BB development Several issues discussed on extensions and constraints of present schema Baselined approach for “interoperability testing” SOIS Area Report

07-Apr-2014-cesg-6 Application Support Services WG (cont.) Planning Process Agency reviews of Red books Develop the new green book on EDS Develop infrastructure and device specs for interoperability testing (JSC) Develop a series of example EDS in association with suppliers Update Schema to incorporate MTS Improve liaison with SM&C and SEA areas for Continue interaction with Savoir and US groups Incorporate feedback from implementers into 2nd version of Red book (this is a lot of work) As part of subnet services 5 year review, perform SOIS Subnet mapping to other datalink protocols (Ethernet, Rapidio, raw 1553, TTtech) Explore US proposal to release a Orange book on Cfs mapping to SOIS along with a publicly available implementation and accompanying tool-set SOIS Area Report

07-Apr-2014-cesg-7 SOIS Area Report Goal : Develop wireless recommendations for space applications Working Group Status : RFID encoding Redbook Green book issue 2 under publication Wireless Local Area Network Blue Book delayed The SSIART (joint test-bench) MOU Signed. Status:OKCAUTIONPROBLEM Comment: New interest and support Wireless Working Group

07-Apr-2014-cesg-8 Wireless WG Goal : Develop wireless recommendations for onboard space applications Working Group Progress : The Green Book update to integrate high-speed wireless communication technologies and use-cases has faced image copyright issues; these were resolved during the meeting and an updated GB version (with copyright information) will be provided again to the CCSDS editor after the technical meeting. The work on the “RFID Tag Encoding Blue Book”, with a lead from NASA & FSA and with ESA & CSA as participants, has been started in Spring and the first draft version has been completed and internally reviewed at this meeting. This reviewed draft will be reviewed by Agency stakeholders (e.g. Mission Integration and Operations Office, FSA, ESA), where the feedback will be incorporated into a second draft which will then be reviewed by the WG before being released to AD. Planning for the development of the “Wireless Local Area Network Blue Book”, with a lead from NASA & FSA and with ESA & CSA as participants, has started. The schedule for the production of this book has been updated to reflect the recent official acceptance by both NASA and FSA, and actual start date (Spring 2015) Proposal to form a BoF to investigate the need for standardization in the area of Time triggered networks including the interfacing and bridging to Wireless The SSIART (Smart-Sensor Inter-Agency Reference Testbench ) MOU has finally been signed by all parties SOIS Area Report

07-Apr-2014-cesg-9 Planning Green Book Spring 2014: Issue 2 Published WWG RFID Encoding Blue Book: Fall 2014:Final draft#1 RFID Encoding Blue Book Spring 2015:Final draft#2 RFID Encoding Blue Book Spring 2016:Final Agency review completion Fall 2016:CMC approval WWG Wireless Local Area Network Blue Book: Fall 2016:Final draft#1 WLAN Blue Book Spring 2018:Final draft#2 WLAN Blue Book Spring 2019:Final Agency review completion Winter 2020:CMC approval Deterministic Networks BOF: Fall 2016Initial Feedback SOIS Area Report

07-Apr-2014-cesg-10 APP WG Electronic data sheets and Dictionary of terms Red books soon ready for submission to CESG for subsequent Agency review EDS Green book slow start Implementation feedback arriving and will require some updates More Resource would be appreciated otherwise schedules will extend Wireless WG Redbook on RFIF encoding solid progress Green book V2 issues with copyright resolved High speed wireless Lan Red book initiated after delay New resources from CNSA and FSA SSIART test-bed agreements finally cleared New BOF proposed to work on Time triggered Lans and wireless interconnect Subnet WG Need to start a 5 year review and introduce feedback Will be difficult unless more resources become available Groups continue to work between meetings with regular telecons SOIS Area Report: Summary

07-Apr-2014-cesg-11 SOIS Area Backup Slides

07-Apr-2014-cesg-12 Application Support Services WG Near Term Planning SOIS Area Report ActivityMilestonePlanned end date XML Specification for Electronic Data Sheets for Onboard Devices Blue book Agency review RB 1 Complete Spring 2015 Electronic Data Sheets XML SchemaInput to SANAFall 2014 Common Dictionary of Terms for Onboard Devices Blue book Agency review RB 1 Complete Spring 2015 Common Dictionary of Terms ontologyInput to SANA End 2014 EDS Green bookDraft v1Spring 2015

07-Apr-2014-cesg-13 Wireless SSIART Smart-Sensor Inter-Agency Reference Testbench SSIART project, proposed in 2011 by NASA and ESA, was finally approved by NASA HQ & ESA HQ in October 2014 History: In 2010, the CCSDS SOIS Wireless Working Group was searching for a way to produce fair comparisons between several wireless technologies for sensors (e.g. PHY/MAC technologies, routing algorithms, power consumption, frequencies, responsiveness…). The available solutions, e.g. internal developments and simulations, do not offer the required comparative framework because they are either highly implementation-dependent or data is simply missing for a proper simulation. At the same time, ESA and NASA were looking for collaborative activities in the field of wireless communications. This led the group (made of ESA, NASA and industrials) to propose a collaborative activity that would result in solving this precise issue. The Smart Sensor Inter-Agency Reference Testbench (SSIART) shall provide the space Agencies and the Industry with a reference platform to test wireless sensor technologies in real representative applications, while promoting them at the same time. In other words, it is to assist in the joint evaluation of potential technology and commercial devices, agreed to pursue the definition of a Smart Sensor Inter- Agency Reference Testbench.

07-Apr-2014-cesg-14 Application Support Services WG (cont.) Feedback from implementers and longer term planning Its clear that SOIS outputs have generated quite some interest in the community The SOIS layered architecture allows highly diverse implementations to target a more common and standardised approach – this can only benefit everyone There is some hesitancy from larger players who, while wanting the benefits of multi- sourced standardised components, also want to keep their implementations proprietary The EDS initiative may well be the correct way forward as it allows standard devices to be mapped to different implementations An EDS can be used for many different purposes and could also be extended to cover other aspect of a device (not proposed in CCSDS) From the feedback received so far we will need to make some changes and additions, at the same time we must keep the (13) recommendations consistent SOIS Area Report

07-Apr-2014-cesg-15 Proposal for new BOF Current human rated vehicles e.g. the ISS use a relatively ad-hoc mix of Time triggered (Milbus), wired asynchronous (Ethernet) and Wireless (802.11) communications technologies to support a variety of applications: Command and control, Science date, Audio and Video, Crew health monitoring, Robotic control Such a mix of services serves to indicate the types of applications that now need to be supported and will required in future exploration missions. There is a clear trend to support these services by use of a single bus able to handle multiple traffic types at high rate. This reduces the number of interfaces necessary for each end-item. Several emerging technologies look promising and able to fulfill a mix of synchronous and asynchronous traffic including Time-Triggered Ethernet (TTE), Time-Triggered Protocol (TTP) and SpaceFibre (SpF). Wireless technology providing all capabilities is in its infancy but seamless communication between wired and wireless networks is highly desirable. The wireless group has proposed a BOF to evaluate these new technologies with a view to standardising their use in space

07-Apr-2014-cesg-16 High Data-Rate Proximity Communication and Sensing Use Cases EVA Telemetry, audio, and video data from suit Must support mesh with point-to-point link between astronauts or astronauts and robotic assistants Need to have mesh relay capability to reduce or eliminate outages or extend range of EVA Tele-Robotics Telemetry, video Video may need to be raw data to minimize latency for critical control Automated rendezvous and docking Telemetry, audio, and video Video may need to be raw data to minimize latency Sensor networks High-bandwidth telemetry data from internal or external sensors High data-rate backhaul for low data-rate sensor network gateways External payloads More and more payloads wanting wireless access Many payloads have high data-rate requirements Teleconferencing between vehicles 16

07-Apr-2014-cesg-17 RFID Tag Encoding Standard Operational use of RFID by NASA and FSA CCSDS tag encoding standard will maintain compatibility with existing on-orbit tags and provide extension of namespace for growth Experimental evaluation: REALM-1 (RFID-Enabled Autonomous Logistics Management) proposed as ISS Utilization experiment CCSDS tag encoding standard will permit Exploration evaluation of encoding options and associated functionality On-going discussions regarding international experiments 17

07-Apr-2014-cesg-18 High Data-Rate Communication and Sensing Examples 18

07-Apr-2014-cesg-19 High Data-Rate Communication and Sensing Examples 19

SOIS response to CMC Appl. Support WGs has no activities identified as part of FP beyond Is it anticipated that all goals will then be achieved and the group has no further activity ? – SOIS has been careful to obtain resources before pushing forwards with new work items and this may give a false impression to the CMC on what is planned – If required we can list a series of extensions and future work to take us way beyond the present near term vision – As a heads up we can state that the SOIS services must evolve in response to implementation feedback and development of electronic data sheets will take many years to mature and for the full potential to be realised

The SOIS Area has only one WG (Wireless) and no activities identified as part of FP beyond Is it anticipated that all goals will then be achieved and the group has no further activity ? – The wireless group has 2 Blue books and one green book under development and the schedules have been updated following a new influx of resources from NASA, RSA, and CSA – The RFID encoding Blue book should l be finalised in 2016 but the WLAN will not be completed before 2020 – A new SIG has been proposed to evaluate the use of deterministic networks required for future exploration missions, this is likely to lead to significant new work Should the group be disbanded earlier and the WG activities be re-allocated to another area (Wireless  SLS?)? – The rational behind this question is not understood as it could also be applied to other groups – is there a technical reason to do this? – the SLS area is anyway overloaded, and it may be more appropriate to move any relevant SLS groups to SOIS and thus even the load on the SLS area director SOIS response to CMC

More globally, only short term ( ) workplan defined. Is this area required beyond 2015? Should CCSDS maintain a role in onboard interface standards? – The updated work plan take us well beyond 2020, so yes we need this area after 2015 – The CCSDS has undertaken this area of activity and we now have many users and implementations. it is therefore incumbent on CCSDS to maintain these standards and evolve them according to Industry and Agency feedback – It is acknowledged that the SOIS work is innovative but this is in direct response to our ‘users’ where the need to improve the standardisation within the onboard avionics has been clearly expressed SOIS response to CMC

Future developments for onboard “Standard Avionics Architectures” were mentioned in the 2014 CMC spring meeting (SUMO). Is this a viable direction; should CCSDS get involved in standardising onboard architectures? – A “STANDARD Avionics architecture” is not foreseen by SOIS but a ‘REFERENCE communications architecture’ was developed to locate the SOIS services and then apply the electronic data sheets – Within the CCSDS we need a “Reference architecture” which is able to locate ALL CCSDS books and this will need to cover ground, the space-link and the onboard system SOIS response to CMC

Appl. Support WGs has no activities identified as part of FP beyond Is it anticipated that all goals will then be achieved and the group has no further activity ? – The SOIS area has always been careful to obtain resources before pushing forwards with new work items and this may give a false impression to the CMC on what is planned – The work being performed is very ambitious and has generated interest from many quarters (Savoir, SUMO, Rapid I/O, Tttech, SPA) and many different disciplines (Avionics, GNC, flight software, reprogrammable devices, spacecraft databases, operations and AIT) as well as other CCSDS areas SM&C, SEA – It will take time for the full scope of the work to be appreciated but it is clear that we will be requested to update and extend the present work (We are already receiving feedback from European primes and US groups ) – There are many new activities that could and should be initiated but this depends on feedback and he level of resources. – In particular, the development of electronic data sheets will take many years to mature and for the full potential to be realised