Andrew McNab - Manchester HEP - 5 July 2001 WP6/Testbed Status Status by partner –CNRS, Czech R., INFN, NIKHEF, NorduGrid, LIP, Russia, UK Security Integration.

Slides:



Advertisements
Similar presentations
CERN STAR TAP June 2001 Status of the EU DataGrid Project Fabrizio Gagliardi CERN EU-DataGrid Project Leader June 2001
Advertisements

Andrew McNab - Manchester HEP - 17 September 2002 Putting Existing Farms on the Testbed Manchester DZero/Atlas and BaBar farms are available via the Testbed.
Andrew McNab - Manchester HEP - 24 May 2001 WorkGroup H: Software Support Both middleware and application support Installation tools and expertise Communication.
12th September 2002Tim Adye1 RAL Tier A Tim Adye Rutherford Appleton Laboratory BaBar Collaboration Meeting Imperial College, London 12 th September 2002.
Andrew McNab - Manchester HEP - 22 April 2002 EU DataGrid Testbed EU DataGrid Software releases Testbed 1 Job Lifecycle Authorisation at your site More.
LHCb Computing Activities in UK Current activities UK GRID activities RICH s/w activities.
Andrew McNab - Manchester HEP - 2 May 2002 Testbed and Authorisation EU DataGrid Testbed 1 Job Lifecycle Software releases Authorisation at your site Grid/Web.
Andrew McNab - Manchester HEP - 31 January 2002 Testbed Release in the UK Integration Team UK deployment TB1 Job Lifecycle VO: Authorisation VO: GIIS and.
Andrew McNab - Manchester HEP - 22 April 2002 EU DataGrid Testbed EU DataGrid Software releases Testbed 1 Job Lifecycle Authorisation at your site More.
NIKHEF Testbed 1 Plans for the coming three months.
Andrew McNab - EDG Access Control - 14 Jan 2003 EU DataGrid security with GSI and Globus Andrew McNab University of Manchester
February 12, 2002 DØRACE 1 Grid activities in NIKHEF Willem van Leeuwen.
Andrew McNab - Manchester HEP - 6 November Old version of website was maintained from Unix command line => needed (gsi)ssh access.
Swedish participation in DataGrid and NorduGrid Paula Eerola SWEGRID meeting,
A.Joutchkov *, N.Tverdokhlebov *, S.Arnautov **, A.Yanovsky **, Y.Lyssov ***, A.Cherny *** *Telecommunication Center “Science & Society” ** Institute for.
Task 3.5 Tests and Integration ( Wp3 kick-off meeting, Poznan, 29 th -30 th January 2002 Santiago González de la.
Security Mechanisms The European DataGrid Project Team
Andrew McNab - Manchester HEP - 22 April 2002 UK Rollout and Support Plan Aim of this talk is to the answer question “As a site admin, what are the steps.
Integration of DataGrid Software for Testbed 1 Goal: combine the DataGrid middleware and the Globus core services. Phases: Preparation for Integration.
Andrew McNab - Manchester HEP - 26 June 2001 WG-H / Support status Packaging / RPM’s UK + EU DG CA’s central grid-users file grid “ping”
08/06/00 LHCb(UK) Meeting Glenn Patrick LHCb(UK) Computing/Grid: RAL Perspective Glenn Patrick Central UK Computing (what.
5 November 2001F Harris GridPP Edinburgh 1 WP8 status for validating Testbed1 and middleware F Harris(LHCb/Oxford)
CERN TERENA Lisbon The Grid Project Fabrizio Gagliardi CERN Information Technology Division May, 2000
3 Sept 2001F HARRIS CHEP, Beijing 1 Moving the LHCb Monte Carlo production system to the GRID D.Galli,U.Marconi,V.Vagnoni INFN Bologna N Brook Bristol.
13-May-03D.P.Kelsey, WP8 CA and VO organistion1 CA’s and Experiment (VO) Organisation WP8 Meeting EDG Barcelona, 13 May 2003 David Kelsey CCLRC/RAL, UK.
Support for system administrators Feedback from site admins after Testbed1 experience 05/03/2002 4th EDG WS Paris G. Merino, IFAE.
DataGrid Applications Federico Carminati WP6 WorkShop December 11, 2000.
8th November 2002Tim Adye1 BaBar Grid Tim Adye Particle Physics Department Rutherford Appleton Laboratory PP Grid Team Coseners House 8 th November 2002.
11 December 2000 Paolo Capiluppi - DataGrid Testbed Workshop CMS Applications Requirements DataGrid Testbed Workshop Milano, 11 December 2000 Paolo Capiluppi,
Andrew McNabNorthGrid, GridPP8, 23 Sept 2003Slide 1 NorthGrid Status Andrew McNab High Energy Physics University of Manchester.
Laboratório de Instrumentação e Física Experimental de Partículas GRID Activities at LIP Jorge Gomes - (LIP Computer Centre)
7April 2000F Harris LHCb Software Workshop 1 LHCb planning on EU GRID activities (for discussion) F Harris.
SouthGrid SouthGrid SouthGrid is a distributed Tier 2 centre, one of four setup in the UK as part of the GridPP project. SouthGrid.
Responsibilities of ROC and CIC in EGEE infrastructure A.Kryukov, SINP MSU, CIC Manager Yu.Lazin, IHEP, ROC Manager
LHCb planning for DataGRID testbed0 Eric van Herwijnen Thursday, 10 may 2001.
RAL Site Report John Gordon IT Department, CLRC/RAL HEPiX Meeting, JLAB, October 2000.
WP8 Meeting Glenn Patrick1 LHCb Grid Activities in UK Grid WP8 Meeting, 16th November 2000 Glenn Patrick (RAL)
Quick Introduction to NorduGrid Oxana Smirnova 4 th Nordic LHC Workshop November 23, 2001, Stockholm.
First attempt for validating/testing Testbed 1 Globus and middleware services WP6 Meeting, December 2001 Flavia Donno, Marco Serra for IT and WPs.
BNL VO Management and Grid Mapfile Generation Brookhaven National Lab.
Preparation for Integration Organized access to the code WP6 infrastructure (MDS-2, RC, …) Input from WPs on requirements,... Acquire experience with Globus.
Development of Russian Grid Segment in the frames of EU DataGRID, LCG and EGEE projects V.A.Ilyin (SINP MSU), V.V.Korenkov (JINR, Dubna) NEC’2003, Varna.
Dave Newbold, University of Bristol8/3/2001 UK Testbed 0 Sites Sites that have committed to TB0: RAL (R) Birmingham (Q) Bristol (Q) Edinburgh (Q) Imperial.
DATAGRID Testbed Work Package (report) F.Etienne, A.Ghiselli CNRS/IN2P3 – Marseille, INFN-CNAF Bologna DATAGRID Conference, 7-9 March 2001 Amsterdam.
…building the next IT revolution From Web to Grid…
10 May 2001DataGrid WP6 Meeting, CERN1 GRID The GRID Installation Toolkit A brief report F. Donno INFN - Pisa.
Grid User Interface for ATLAS & LHCb A more recent UK mini production used input data stored on RAL’s tape server, the requirements in JDL and the IC Resource.
NIKHEF CT/ Status NIKHEF (NL). NIKHEFDataGrid/Oxford/July DutchGrid Participation of High-energy Physics Earth observation Computer.
CDF computing in the GRID framework in Santander
UK Grid Meeting Glenn Patrick1 LHCb Grid Activities in UK Grid Prototype and Globus Technical Meeting QMW, 22nd November 2000 Glenn Patrick (RAL)
Andrew McNab - Manchester HEP - 17 September 2002 UK Testbed Deployment Aim of this talk is to the answer the questions: –“How much of the Testbed has.
DataTAG Work Package 4 Meeting Bologna Simone Ludwig Brunel University 23rd and 24th of May 2002.
Andrew McNabGrid in 2002, Manchester HEP, 7 Jan 2003Slide 1 Grid Work in 2002 Andrew McNab High Energy Physics University of Manchester.
LCG LCG-1 Deployment and usage experience Lev Shamardin SINP MSU, Moscow
W.A.Wojcik/CCIN2P3, Nov 1, CCIN2P3 Site report Wojciech A. Wojcik IN2P3 Computing Center URL:
LHCb Data Challenge in 2002 A.Tsaregorodtsev, CPPM, Marseille DataGRID France meeting, Lyon, 18 April 2002.
15-Feb-02Steve Traylen, RAL WP6 Test Bed Report1 RAL/UK WP6 Test Bed Report Steve Traylen, WP6 PPGRID/RAL, UK
LHCb Grid MeetingLiverpool, UK GRID Activities Glenn Patrick Not particularly knowledgeable-just based on attending 3 meetings.  UK-HEP.
10-May-01D.P.Kelsey, WP6 Security1 Certificates/Authorisation for DataGrid Testbeds David Kelsey CLRC/RAL, UK
7-May-03D.P.Kelsey, LCG-GDB-Security1 LCG/GDB Security Issues and Planning or Report from the Security Group CERN, 8 May 2003 David Kelsey CCLRC/RAL, UK.
11-May-01D.P.Kelsey, Security Update1 GRID Security Update David Kelsey CLRC/RAL, UK
Dave Newbold, University of Bristol14/8/2001 Testbed 1 What is it? First deployment of DataGrid middleware tools The place where we find out if it all.
June 2000 Globus UK Workshop R. Hughes-Jones Globus Current and Future Organizational / Management uHow do we keep informed of work in UK / HEP? èSimple.
Grid activities in Czech Republic Jiri Kosina Institute of Physics of the Academy of Sciences of the Czech Republic
The EDG Testbed Deployment Details
Russian Regional Center for LHC Data Analysis
UK GridPP Tier-1/A Centre at CLRC
UK Testbed Status Testbed 0 GridPP project Experiments’ tests started
Gridifying the LHCb Monte Carlo production system
Grid activities in NIKHEF
Presentation transcript:

Andrew McNab - Manchester HEP - 5 July 2001 WP6/Testbed Status Status by partner –CNRS, Czech R., INFN, NIKHEF, NorduGrid, LIP, Russia, UK Security Integration –preparation + process

Andrew McNab - Manchester HEP - 5 July 2001 CNRS/IN2P3 Have participated in large scale test for ALICE, writing to HPSS and SQL catalog. Local BQS batch system now has Globus gateway: 200+ Linux nodes, 130+ Solaris / HP- UX / AIX Storage element is 35TB disk + HPSS managing 50TB tape with 1 TB cache Have transferred data into CERN’s Castor using bbFTP

Andrew McNab - Manchester HEP - 5 July 2001 CNRS WP10 Have used TB0 for initial experiments with “gridifying” biology applications Used BLAST which searches for similar genome sequences => GridBLAST Successfully ran distributed comparisons, partitioned between Marseille and Clermont on top of Globus

Andrew McNab - Manchester HEP - 5 July 2001 Czech Republic Collaboration between CESNET and Institute of Physics One testbed site Currently 64 node farm accessible via grid tools Enlargement with more nodes and 10TB planned

Andrew McNab - Manchester HEP - 5 July 2001 INFN Grid software running at 15 sites: ~50 dedicated nodes for Testbed ATLAS, CMS and ALICE have ~100 nodes in farms at 8 sites, which have also participated in tests More dedicated farms (5x2xPIII at 5 sites) are funded

Andrew McNab - Manchester HEP - 5 July 2001 INFN For testbeds have produced/set up: –installation kit –CA + LDAP directory of users for authorisation –National MDS hierarchy –Formal procedure for obtaining testbed “time” –Web accessible database of available nodes and their characteristics, with management tools

Andrew McNab - Manchester HEP - 5 July 2001 NIKHEF DutchGrid a collaboration between HEP, Earth observation and Computer Science 12 locations participating + CA in place D0 farms operational at NIKHEF (50x2 nodes) and Nijmegen (5x2) LHCb and ALICE farms in preparation at NIKHEF, Free University Amsterdam and Utrecht

Andrew McNab - Manchester HEP - 5 July 2001 Nordic Countries NorduGrid –Denmark, Finland, Norway, Sweden Common CA in place Common information namespace Small test clusters operational

Andrew McNab - Manchester HEP - 5 July 2001 LIP (Portugal) Have built and evaluated low cost local fabric using commodity components Currently 19 nodes with several hardware configurations A CA has been established National and local GIIS servers and an MDS hierarchy have been set up

Andrew McNab - Manchester HEP - 5 July 2001 Russia SINP MSU, RCC MSU, ITEP, JINR, KIAM, IHEP all participating in Testbed Sites have 2, 100 or 1000 Mb/s connections within Russia, and ~100 nodes in total Russian CA in place RCC MSU, ITEP, JINR, KIAM, IHEP have all setup Globus and received certificates

Andrew McNab - Manchester HEP - 5 July 2001 United Kingdom GridPP project now has 1st year funding (total ~50M CHF) - includes LHC and CDF/D0/Babar components Testbed 0 has 9 sites participating and listed in national MDS Dedicated Testbed facility at RAL (10’s of nodes); and prototyping of Tier 1 / A centre for LHC and Babar will start soon. CA operational Testbed 0 sites mostly using GridPP RPM distribution, now with other EDG CA’s included

Andrew McNab - Manchester HEP - 5 July 2001 United Kingdom CMS: –Currently in large-scale MC production –No major problems found with ‘everyday’ use of GDMP tool –Continuing with tests of GRAM use LHCb: –Doing large-scale MC production –Testing use of Globus GRAM on RAL CSF (+ other sites) BaBar: –Globus tools being installed on new BaBar distributed facilities in the UK. –Will provide a serious test of Grid systems in production on same timescale as start of TB1 –Have offered their resources for large scale TB0/TB1 tests

Andrew McNab - Manchester HEP - 5 July 2001 Security Authentification –Partners CA’s up and running (8 listed with WP6) –CA policy documents being finalised for TB1 Authorisation –New authorisation group starting –LDAP system from INFN for listing users by group –Patch to Globus from UK to allow dynamic accounts –Both ready, and can be used on TB1 timescale

Andrew McNab - Manchester HEP - 5 July 2001 Preparation for Integration Integration Process document has been drafted, including specific dates / milestones Contacts with WP’s underway or starting, to explain constraints and obtain lists of requirements and dependencies Globus2 alpha being evaluated and preliminary packaging has been made Infrastructure of web site, bug tracking, CVS repository / mirror being set up

Andrew McNab - Manchester HEP - 5 July 2001 Integration Process 2-3 weeks in a room at CERN (or Lyon) during September, with a set of WP1-6 experts physically present Once a beta grid is running between machines in that room, invite applications to begin testing Grid is expanded to remote sites using expertise of integration team - who then support further expansion to neighbouring sites

Andrew McNab - Manchester HEP - 5 July 2001 Summary Testbed 0 is already providing enough CPU / disk resources to do meaningful tests of a grid Many larger farms coming on stream on timescale of TB1 start up Authentification infrastructure well under control Practical authorisation system being put in place Necessary groundwork for integration being done A workable plan for the integration process has been made