ECMA-383 Kevin Fisher, Convenor Ecma TC38-TG2 Representing BSI UK Employee Intel Corp Rue du Rhône 114- CH-1204 Geneva - T: +41 22 849 6000 - F: +41 22.

Slides:



Advertisements
Similar presentations
Electric Induction Wireless Commumication Invitation to JTC 1/SC 06 for open review For Ecmas prospective comments and dispositions to the DIS in ISO/IEC.
Advertisements

Polycom Unified Collaboration for IBM Lotus Sametime and IBM Lotus Notes January 2010.
Protocol arrangement Slides Ecma/TC47/2009/070 TC47.
Rue du Rhône CH-1204 Geneva - T: F: NFC protocol arrangement ISO/IEC ECMA-352.
September 2013 ASTM Officers Training Workshop September 2013 ASTM Officers Training Workshop Membership & Roster Maintenance September 2013 ASTM Officers.
ASYCUDA Overview … a summary of the objectives of ASYCUDA implementation projects and features of the software for the Customs computer system.
Rue du Rhône 114- CH-1204 Geneva - T: F: Standards for VoIP in the Enterprise By: John Elwell.
Rue du Rhône 114- CH-1204 Geneva - T: F: Ecma International February 2013
Rue du Rhône 114- CH-1204 Geneva - T: F: Ecma TC43: Universal 3D.
High Rate - Ultra Wide Band (UWB) Background Ecma/GA/2005/038.
Rue du Rhône CH-1204 Geneva - T: F: Safety of Electronic Equipment Safeguards to reduce.
Rue du Rhône 114- CH-1204 Geneva - T: F: Ecma TC38 – TG2 May 2007 Kevin Fisher – Intel Corp.
Personal Networks and Their Federations Bernard Hammer TC32 chair Ecma/GA/2008/243.
Rue du Rhône CH-1204 Geneva - T: F: Ecma TC32-PNF From Personal Area Networks to.
Rue du Rhône CH-1204 Geneva - T: F: NFC protocol arrangement ISO/IEC ECMA-352.
Rue du Rhône 114- CH-1204 Geneva - T: F: Declaration of Environmental Product Attributes.
Security Standards for NFCIP-1 Ecma/TC47/2009/024-Rev1 TC47.
High Rate 60 GHz PHY, MAC and HDMI PAL Standard Invitation to ETSI BRAN, WiMedia and JTC 1/SC 06 open review For Ecmas comments and dispositions to DISs.
Rue du Rhône 114- CH-1204 Geneva - T: F: Ecma International TC38 Scope, Aims, Status and.
Product Safety Engineering TC12, May 2009 Ecma/TC12/2009/011 From: Incident-based Product-specific Construction-based Reactive To: Hazard-based Technology-independent.
Rue du Rhône 114- CH-1204 Geneva - T: F: Ecma International TC38 Scope, Aims, Status and.
Rue du Rhône 114- CH-1204 Geneva - T: F: Near field communication (NFC) Ecma/TC32-TG19/2005/013.
Rue du Rhône CH-1204 Geneva - T: F: NFC protocol arrangement ISO/IEC ECMA-352.
ECMA-373 Invitation to ETSI/SCP and JTC 1/SC 06 for open review For Ecmas comments and dispositions to DIS in ISO/IEC JTC 1s fast track procedure Ecma/GA/2006/136.
Close Capacitive Coupling Communication Principles and applications Ecma/TC47/2010/083 (Rev. 1 – 8 December 2010 Rev.1.1.
Rue du Rhône CH-1204 Geneva - T: F: NFC protocol arrangement ISO/IEC ECMA-352.
Protocol arrangement Slides Ecma/TC47/2010/016 (supersedes 2009/070-Rev1) (Rev. 1 – 13 Dec. 2010) TC47.
Rue du Rhône 114- CH-1204 Geneva - T: F: Ecma International TC38 Scope, Aims, Status and.
Rue du Rhône CH-1204 Geneva - T: F: NFC protocol arrangement ISO/IEC ECMA-352.
Introduction to network proxying to reduce energy consumption In Ecma International TC32-TG21TC32-TG21 Ecma/TC32-TG21/2009/047.
Introduction to TV White Spaces In Ecma International TC48-TG1TC48-TG1 Ecma/TC48-TG1/2009/017.
MAC & PHY Standard for Operation in TV White Space Invitation to JTC 1/SC 06 and CogNeA for open review For Ecmas prospective comments and dispositions.
History of Ecma Rules and Patent Policy 29 June 2011 Michael Breidthardt.
Optical Discs Ecma Golden Jubilee June 29 th, 2011 by Paul Weijenbergh.
Ecma, 50 years and beyond Josée Auber. In work programme now Scripting (ECMAScript), XML schemas (XPS, OOXML), languages (Eiffel, C#) Optical Media(CD,
Open-NFC Invitation to ETSI/SCP, JTC 1/SC 06 and NFC-Forum for open review Ecma/GA/2007/103.
ECMA-383ECMA nd edition Measuring the energy consumption of personal computing products Overview November 2009 Ecma/TC38-TG2/2009/113.
Rue du Rhône 114- CH-1204 Geneva - T: F: Document Formats: Ecma Office OpenXML How Ecma.
Close Proximity Electric Induction Data Transfer Ecma/TC50/2011/005.
114 rue du Rhône - CH-1204 Geneva - T: F: Self-Declaration of Environmental Product Attributes.
Close Proximity Electric Induction Data Transfer Overview September 2010 Ecma/TC50/2010/037.
December 2005 EuP Directive : A Framework for setting eco-design requirements for energy-using products European Commission.
The European Qualifications Framework (EQF)
NPA WG : Single and multiple releases
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011.
Pre-commercial Procurement of Innovation Building together innovative solutions Ulf Dahlsten, Director European Commission, DG INFSO.
0 - 0.
1 Portals – an institutional imperative Paisleys portal production process Tony Shaw, Anne Strachan Network and Information Systems Management University.
Responsible Care and its relation to Global Product Strategy.
© 2009 IBM Corporation iEA16 Defining and Aligning Requirements using System Architect and DOORs Paul W. Johnson CEO / President Pragmatica Innovations.
Effectively applying ISO9001:2000 clauses 6 and 7.
Contract Models Terms and Conditions Joyce Matthews September 2003 LMU Tier 1 Supplier Forum.
© Digital Media Device Association December 4, 2002 Tom White (1) Digital Media Device Association Call for Proposals for Technology to Enable Interoperability.
Discovering Computers Fundamentals, 2012 Edition
21 st Annual Conference. Delivering sustainable solutions in a more competitive world Mercury Lamps - Life Cycle Assessment for Product Stewardship Peter.
The European Lighting Industry Position on How to Maximise the Potential Benefits of European Policy on Energy Efficiency in Lighting January 2008.
PRETON PRESENTATION PRINT COST SAVING (PCS) TECHNOLOGY PRETON - PRINT AND SAVE February 2006.
1 Standards and their role in the carbon debate Anne Hayes Head of Market Development – Sustainability BSI British Standards
HIGH COUNCIL FOR ECONOMY, INDUSTRY, ENERGY AND TECHNOLOGIES 1 Metrology policies to foster the competitiveness of industry J.F. Magaña.
European e-Competence Framework 1.0 A common European framework for ICT Professionals in all industry sectors
Addition 1’s to 20.
Chapter 14 Data Mining Throughout the Customer Life Cycle.
 Acceptance testing is a user-run test that demonstrates the application’s ability to meet the original business objectives and system requirements and.
Technical Review Group (TRG)Agenda 27/04/06 TRG Remit Membership Operation ICT Strategy ICT Roadmap.
BUYING GREENER PCs The Sustainable Desktop? Sheffield 2 September 2008 Lisa Hopkinson HEEPI University of Bradford.
REACH FOR POLYMERS A €480, month project aiming to increase the knowledge base of the European polymer industry, particularly SMEs, when complying.
Ecma International June 2017 Speed
Scope, Aims, Status and Plans Status: 18 May 2010
Ecma International June 2017 Speed
Ecma International January 2019 Speed
Presentation transcript:

ECMA-383 Kevin Fisher, Convenor Ecma TC38-TG2 Representing BSI UK Employee Intel Corp Rue du Rhône 114- CH-1204 Geneva - T: F:

Rue du Rhône CH-1204 Geneva - T: F: Agenda Background / History ECMA st edition (Plan A) Issues with Plan A Plan B proposal Challenges with Plan B

Rue du Rhône CH-1204 Geneva - T: F: Background and History Ecma International: an industry association founded in 1961, dedicated to standardization of ICT & CE products Organisation membership from Asia, Europe and America Companies, Research institutes, Single person companies 2003: Ecma issued the worlds first environmentally conscious design standard (ECMA-341) Aimed at the designer, provides pragmatic advice on how to reduce the environmental footprint of an ICT/CE product at the design stage. ECMA-341 now available as IEC Neither of these standards provide energy measurement criteria

Rue du Rhône CH-1204 Geneva - T: F: Ecma TC38-TG2 In Q4/05, Ecma set up Task Group 2 within Technical Committee 38 to create energy [efficiency] standards Initial scope was desktop and notebook computers Kevin Fisher of Intel is the convenor In order to ensure maximum transparency and a wide adoption of the work, Ecma agreed to the participation of non-Ecma member companies Participants include: IBM, HP, Dell, Toshiba, Gateway, Sony Apple, Microsoft, Novell Lexmark, Ricoh, Océ Intel, AMD, nVidia, VIA technologies Ecos, ICF, ITI, LBNL, Terra Novum Observers include: EPA (US), EC (EU), CSC (China)

Rue du Rhône CH-1204 Geneva - T: F: Energy environment for Computers Voluntary and regulatory Energy Star, TopRunner, EuP Lot 6 etc. IEC exists today for measuring off mode. The goal for Ecma TC38-TG2 was from the outset to determine a more holistic approach to measuring energy [efficiency] of computers.

Rue du Rhône CH-1204 Geneva - T: F: Plan A Ecma TC38-TG2 embarked on Plan A Three vectors required: Energy consumption (annualised) Capabilities Performance Require a benchmark to: measure performance enumerate capabilities run workloads for measuring Active energy consumption Require a set of criteria for compliant benchmarks

Rue du Rhône CH-1204 Geneva - T: F: Rational for the 3 vectors in Plan A

Rue du Rhône CH-1204 Geneva - T: F: Measuring Energy, Performance and Capabilities Classifications: Computer type: Notebook or Desktop Workloads: Office productivity or Media Rich (others such as 3D or HD to be defined) Duty cycle: How long is the machine doing work vs. idle or sleep? Two key vectors: Power and Time Historical emphasis has been on Power. The new concept was to place more emphasis on Time.

Rue du Rhône CH-1204 Geneva - T: F:

Rue du Rhône CH-1204 Geneva - T: F: Summary of the 1 st edition ECMA-383 Initial focus on Desktop and Portable Computers Provides a consistent test methodology and reporting structure In support of the standard a benchmark is required Three components: UUT workload classification: Rich media or office productivity Performance and capability measurement Energy consumption per workload and defined duty cycle

Rue du Rhône CH-1204 Geneva - T: F: Benchmark Criteria The 1st edition of the Ecma Standard does not specify THE benchmark. It provides criteria that a self declared benchmark must comply with Criteria for a benchmark that can be self declared by its developer to be used in support of the Ecma Standard: ECMA-383 1st Edition A benchmark developer would self declare compliance, inform Ecma who would add a link to their benchmark on the Ecma web site. ECMA-383 provides the relevant Ecma urls

Rue du Rhône CH-1204 Geneva - T: F: Problems with Plan A The link with a benchmark has been problematic Criteria for BM compliance complicated Approval process open to criticism Overheads to run the standard and benchmark high Costs associated with BM purchase and renewal Test time in excess of 1 hour Performance vector complicated How do you define Performance? Difficulty in reaching agreement on performance measurement vector (e.g. the benchmark score) Performance benchmarks already exist today Simple enumeration of Capabilities does not allow for product to product comparisons Three vectors as output: How do they all relate?

Rue du Rhône CH-1204 Geneva - T: F: Plan B required Goals of plan B Find replacement criteria for Performance to enable energy consumption comparisons of like machines Reduce / remove the link to a benchmark Provide a standard that can be used to measure power consumption in all energy states and report energy consumption over a given period of time (e.g. annualised) Timescales for Plan B Be ready for Ecma GA in December 2009 Work in parallel with IEC TC108 WG Environment

Rue du Rhône CH-1204 Geneva - T: F: Plan B: The proposal Replace the Capability and Performance vectors used in Plan A with a Categorisation vector Enable the comparison of energy consumption of like for like machines Categorisation details need to be defined. Examples would be: Processor: # cores, # physical processors, cache etc Audio: s/n ratio, # channels etc. Graphics: size of memory, GPU capabilities etc Memory: How big, how fast Storage: Number and size of devices Enable the standard to measure power in any or all power states: e.g. Off, Sleep, idle, active

Rue du Rhône CH-1204 Geneva - T: F: Plan B: The Benefits Removed the link with a BM (however see next slide for Active power discussions) The standard becomes simpler, faster and cheaper for user More holistic standard for energy measurement User can choose to measure power / energy in any power state, or: Report overall energy consumption over a given period of time, and: Compare like machines

Rue du Rhône CH-1204 Geneva - T: F: Plan B: The challenges Categorisation: Not a new concept but will require much debate and comparison of ideas Energy consumption in Active mode, two arguments: On an annualised basis, the energy consumed in active is negligible therefore it could be considered as idle In the coming years, idle time will reduce and so active energy will become more important If active energy mode included: What workload to run to demonstrate real world active mode energy consumption?

Rue du Rhône CH-1204 Geneva - T: F: Plan B: Next steps Define a roadmap for December completion Categorisation and Active energy are risk factors Solicit ideas from all members on Categorisation techniques Agree how to handle Active power Start basics of the standard (definitions, test flow etc) Agree a working process between IEC and Ecma

Comparison Plan A to B Rue du Rhône CH-1204 Geneva - T: F: Plan B Plan A ECMA-383 Standard 1 st Edition Benchmark Criteria Performance score Energy consumption Capabilities Problems Benchmark Test time Performance definition Three outputs Plan B ECMA-383 Standard 2 nd Edition Workload for Active* System Categorised Energy consumption in any or all power states *If we include Active energy consumption in the 2 nd edition

Address Ecma is driven purely by the will of its members It is run by industry for industry, and is aware of your time and cost constraints Proven system for getting things done right and on time The know-how of the secretariat, GA and CC guides technical experts through international standardization jungle The Ecma process filters out non-commercial interests, resolves competitive clashes which are not productive The fast track by Ecma saves you time and money. If you get three members together for a project, it can not be stopped by other members Ecma works readily on several competing solutions to the same problem The development of an Ecma Standard takes (typically) no more than half the time required to develop a similar standard in any competing forum. Ecma Standards are recognized worldwide as amongst the highest quality Rue du Rhône CH-1204 Geneva - T: F: ????? Rue du Rhône 114 CH-1204 Geneva T: F: Thank you!