Avian Influenza Technical Series Animal and Human Health Laboratories Session #4 Laboratory Accreditation & Certification, Agencies and Resources Presented.

Slides:



Advertisements
Similar presentations
MGD Services, Inc. The IT Quality Assurance Specialists
Advertisements

Museum Presentation Intermuseum Conservation Association.
A Joint Code of Practice Objectives and Summary Presentation
Botulinum in the Research Laboratory - EHS Controls Presented by: Lisa Wisser, CIH AIHCE - June 6, 2001.
Health and Safety in the Laboratory
THINGS TO CONSIDER Patrick Rafter Minuteman High School.
TRAINING FOR THE WEIGHTS AND MEASURES OFFICIAL COURSE CURRICULUM MODULE 1Introduction MODULE 2Laws & Regulations MODULE 3Enforcement Procedures MODULE.
Intro to Enersol What is Retro-commissioning? Define Benefits of Retro-commissioning Define Retro-commissioning Process Discuss Retro-commissioning Findings.
KEITH CANTANDO, CBCP CORPORATE SECURITY - PROGRAMS PROGRESS ENERGY PS-Prep (DHS – Voluntary Private Sector Preparedness Accreditation.
Limited English Proficiency A Guide to Compliance with OCR Regulations for Health Care Providers receiving Federal Financial Assistance from HHS.
Page  ASME 2014 Standards and Certification Training Module A – Administrative A2.Standards and Certification Products ASME S&C Training Module A2. Standards.
Airflow and BSC Biosafety and Biosecurity Awareness Training
PERFORMING EFFECTIVE BUILDING SYSTEM RECOMMISSIONING STUDIES Joseph J. Watson, P.E. Booth # 312.
MODULE B - PROCESS B1. ASME Organizational Structure B2. Standards Development: Staff and Volunteer Roles and Responsibilities B3. Conformity Assessment:
1 Assessment: Norms and Accreditation. Assessment: Norms and Accreditation-Module 11 2 Learning Objectives At the end of this module, participants will.
Building Commissioning. What is building commissioning? Building commissioning is a systematic and documented process of ensuring that the owner’s operational.
Sustainability and Commissioning for Military Facilities WHAT IT IS AND WHAT IT IS NOT! Dan Jackson, PE, Vice President Tim Whitley, PE, CxA, CCP, LEED.
Biosafety Program Development Presented by: Lisa Wisser, CIH AIHCE - June 6, 2001.
1 MANUFACTURING AND PRODUCTION OF BIOLOGICAL PRODUCTS (ERT 455) HAZARD ANALYSIS AND CRITICAL CONTROL POINT (HACCP) SYSTEM Munira Mohamed Nazari School.
Public and Private Interests in Animal Research LAT Chapter 1.
Building Commissioning
Post Approval Monitoring Program Presented by Carolyn Malinowski Manager, Quality Assurance and Training.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
1 CEN Standard on Medical Physics Services: Structure of Standards Derek Pearson, ECMP 2014, 11 – 14 September 2014, Athens, Greece Derek Pearson IPEM.
O PERATING A BSL-3 F ACILITY IN K OREA T HE IVI E XPERIENCE INTERNATIONAL WORKSHOP ON ANTICIPATING BIOSECURITY CHALLENGES OF THE GLOBAL EXPANSION OF HIGH.
Seafood HACCP Alliance for Training and Education Chapter 10 Principle 6: Establish Verification Procedures.
Occupational Health Programs
RYERSON UNIVERSITY 1 1. ADMINISTRATION. RYERSON UNIVERSITY 2 Biological Safety Training – Certificate Holder and User Training BIOLOGICAL SAFETY at RYERSON.
Laboratory Biorisk Management Standard CWA 15793:2008
Biosafety and Biosecurity Challenges in the Caribbean Region Valerie Wilson Caribbean Med Labs Foundation Anticipating Global Biosecurity Challenges Istanbul,
Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 COMMISSIONING ??? COMMISSIONING 101.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
National Sustainable Building Advisor Program Unit 8B Building commissioning Christopher Kerr, CxA Glumac June 4, 2010.
Kristin Heinemeier, Ph.D., P.E. Technical Director Brooks Energy & Sustainability Lab Texas Engineering Experiment Station Texas A&M University System.
Responsible Conduct of Research (RCR) Farida Lada October 16, 2013
November 27, 2007Pebble Project Agency Meetings Pebble Project Data Management Data Management Responsibilities Ensure complete and accurate field and.
From Research Prototype to Production
Risk Assessment. Risk As defined by Kaplan and Garrick, risk analysis consists of answering three specific questions: what can happen? what is the chance.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
Safety organization and training. The biosafety officer and biosafety committee A safety policy, A safety manual, and Supporting programmes for their.
Managing Your Grant Award August 23, 2012 Janet Stoeckert Director, Research Administration Sr. Administrator, Basic Sciences Keck School of Medicine 1.
Product Documentation Chapter 5. Required Medical Device Documentation  Business proposal  Product specification  Design specification  Software.
April, 2002Energy Audits1 April, 2002 Ryan Stroupe, Pacific Energy Center DeAnza College: ES 76 Energy Reliability and Your Organization Energy Auditing.
Planning for Successful Simulation Simulation Planning Guide - A Guided Discussion.
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
Safety Auditors Conference 2005 A Practical Approach…….
IFBA’s Biocontainment Engineering Network Istanbul. July, 2011 K. Ugwu Co-chair IFBA Biocontainment Engineering Working Group.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
How to Create a Craig Hawkins acg 2008 Annual Meeting-Best Practices for Total Building Commissioning 1.
Process of Planning, Designing and Financing a Hospital
PUBLIC–PRIVATE PARTNERSHIP (PPP) FRAMEWORK AND GUIDELINES Syed M. Ali Zaidi, P.Eng. PM(Stanford), Ph.D. Director, Strategic Partnerships Alberta Infrastructure.
Specifying Commissioning Derek De Jesús, CxA Commissioning Manager Chinook Systems, Inc. Understanding the Commissioning Process October 14, 2008 ©2008.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
Commissioning HVAC Systems: Lessons learned throughout
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
Glendale Community College Why LEED? Why Commissioning? Blair Seibert, AIA, LEED AP, CSBA VERDE CONCEPTS Los Angeles.
Developing an Audit Program By Rodney Kocot President Systems Control and Security Incorporated Copyright © 2005 Rodney Kocot.
How to succeed in International Tenders Ing. Miloš TKÁČ MTC – Engineering / Consulting / Sales Južná trieda 93 – P.c. Strojár, Košice tel.: 055 / 6808.
Steve Griffith February 28th, 2017
Systems Analysis and Design in a Changing World, 4th Edition
MEP CoordinationMEP Coordination and Clash Detection is Extremely Significant for BIM-Know Why.
CLINICAL INFORMATION SYSTEM
The Hazard Analysis Critical Control Point
The Hazard Analysis Critical Control Point
CxA at Georgia Tech TRAINING OUTLINE Overview of CxA
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
PSS verification and validation
Computer System Validation
Presentation transcript:

Avian Influenza Technical Series Animal and Human Health Laboratories Session #4 Laboratory Accreditation & Certification, Agencies and Resources Presented by: Craig M. Free, P.E. Diversified Laboratory Sciences, Inc. In cooperation with: The United States Department of State, Biosecurity Engagement Program Sandia National Laboratories, International Biological Threat Reduction Program

Laboratory Accreditation & Certification Session #4 Outline DefinitionsDefinitions Timeline for Laboratory Operational AssuranceTimeline for Laboratory Operational Assurance Commissioning vs. CertificationCommissioning vs. Certification Commissioning ProcessCommissioning Process Commissioning Procedures (Construction Phase)Commissioning Procedures (Construction Phase) Commissioning for High Containment LaboratoriesCommissioning for High Containment Laboratories Commissioning TeamCommissioning Team Estimated Cost of CommissioningEstimated Cost of Commissioning Current and Proposed Laboratory Standards Related to FacilitiesCurrent and Proposed Laboratory Standards Related to Facilities Financial and Technical ResourcesFinancial and Technical Resources On-line ResourcesOn-line Resources Commissioning ResourcesCommissioning Resources SummarySummary

Laboratory Accreditation & Certification Definitions: Commissioning: A quality-oriented process for achieving, verifying, and documenting that the performance of facilities, systems, and assemblies meets defined objectives and criteria. ASHRAE Guideline 0Commissioning: A quality-oriented process for achieving, verifying, and documenting that the performance of facilities, systems, and assemblies meets defined objectives and criteria. ASHRAE Guideline 0 Certification: To attest as being true or as represented or as meeting a standard. Websters On-line dictionaryCertification: To attest as being true or as represented or as meeting a standard. Websters On-line dictionary Laboratory Planning/Programming: Up to 20% overall completionLaboratory Planning/Programming: Up to 20% overall completion Laboratory Design Development (DD): 20 – 50% overall completionLaboratory Design Development (DD): 20 – 50% overall completion Laboratory Construction Documents (CDs): 50 – 100% overall completionLaboratory Construction Documents (CDs): 50 – 100% overall completion

Laboratory Accreditation & Certification Timeline of Laboratory Operational Assurance When does laboratory operational assurance begin?When does laboratory operational assurance begin? A the beginning of the design process.A the beginning of the design process. When should the services of the commissioning team be engaged?When should the services of the commissioning team be engaged? Preferably at the beginning of the DD phase, but no later than the beginning of the CD phase.Preferably at the beginning of the DD phase, but no later than the beginning of the CD phase. When does the laboratory operational assurance phase end?When does the laboratory operational assurance phase end? NeverNever

Laboratory Accreditation & Certification Commissioning vs. Certification Commissioning Commissioning validates the operational performance of a facility in accordance with the CDs. Typically conducted by 3 rd party and hired directly by the building owner.Commissioning validates the operational performance of a facility in accordance with the CDs. Typically conducted by 3 rd party and hired directly by the building owner. Commissioning provides a means by which the facility personnel and research staff can receive facility related training.Commissioning provides a means by which the facility personnel and research staff can receive facility related training. Commissioning provides a means by which research institutions can measure operational efficacy of the laboratory.Commissioning provides a means by which research institutions can measure operational efficacy of the laboratory. Commissioning provides documentation for baseline operation of systems.Commissioning provides documentation for baseline operation of systems.

Laboratory Accreditation & Certification Commissioning vs. Certification (continued) Certification Certification ensures that a facility, process, or piece of equipment is functioning in accordance with published standards published and administered by a regulatory entity.Certification ensures that a facility, process, or piece of equipment is functioning in accordance with published standards published and administered by a regulatory entity. Related example: Biological Safety Cabinet certification - ANSI/NSF 49.Related example: Biological Safety Cabinet certification - ANSI/NSF 49. There are currently no laboratory certification standards and, thus, no accrediting or certification entity.There are currently no laboratory certification standards and, thus, no accrediting or certification entity. High containment design and operation is driven by the biosafety Risk Assessment (RA). Since the RA is developed specifically for each lab, developing criteria for certification becomes problematic.High containment design and operation is driven by the biosafety Risk Assessment (RA). Since the RA is developed specifically for each lab, developing criteria for certification becomes problematic. Certifying a lab without published certification standards can introduce significant liability issues.Certifying a lab without published certification standards can introduce significant liability issues.

Laboratory Accreditation & Certification Commissioning Process Laboratory PlanningLaboratory Planning Establish Commissioning TeamEstablish Commissioning Team Review Owner RequirementsReview Owner Requirements Identify Commissioning Scope and BudgetIdentify Commissioning Scope and Budget Develop Commissioning PlanDevelop Commissioning Plan Laboratory Design (DD and CD Phases)Laboratory Design (DD and CD Phases) Conduct Design Peer ReviewConduct Design Peer Review Develop Commissioning SpecificationsDevelop Commissioning Specifications Laboratory ConstructionLaboratory Construction Schedule Commissioning Activities and MeetingsSchedule Commissioning Activities and Meetings Review Construction SubmittalsReview Construction Submittals Finalize Test Procedures Based Upon Actual Equipment PurchasedFinalize Test Procedures Based Upon Actual Equipment Purchased Execute Commissioning Test ProceduresExecute Commissioning Test Procedures Conduct Owner TrainingConduct Owner Training Document baseline operational conditions and nuances of each systemDocument baseline operational conditions and nuances of each system

Laboratory Accreditation & Certification Commissioning Procedures (Construction Phase) Pre-functional testingPre-functional testing Visually verifying that the building support equipment has been installed in accordance with the CDs and with the manufacturer's recommendations.Visually verifying that the building support equipment has been installed in accordance with the CDs and with the manufacturer's recommendations. Identified potential maintenance issuesIdentified potential maintenance issues Flow (TAB) verificationFlow (TAB) verification Verify that the contractors testing, adjusting, and balancing (TAB) report is accurate.Verify that the contractors testing, adjusting, and balancing (TAB) report is accurate. Functional testingFunctional testing Conducts physical performance tests of each major piece of equipment to ensure they are operating as designed.Conducts physical performance tests of each major piece of equipment to ensure they are operating as designed. Integrated systems testingIntegrated systems testing Conducts physical performance tests to verify that the major systems interact as designed.Conducts physical performance tests to verify that the major systems interact as designed. Planted failure testingPlanted failure testing Create failures with equipment or systems to see how the users react to the problem.Create failures with equipment or systems to see how the users react to the problem.

Laboratory Accreditation & Certification Commissioning for High Containment Laboratories (Critical systems that are often designed or tested incorrectly) Failure sequences (BSL-3 & BSL-4)Failure sequences (BSL-3 & BSL-4) Loss of power, switchover to from grid to emergency powerLoss of power, switchover to from grid to emergency power Restoration of power, switchover from emergency to grid powerRestoration of power, switchover from emergency to grid power Temporary loss of power (< 2 seconds)Temporary loss of power (< 2 seconds) Loss of equipment due to failureLoss of equipment due to failure Loss of equipment due to planned maintenanceLoss of equipment due to planned maintenance Laboratory envelope integrity (BSL-3 & BSL-4)Laboratory envelope integrity (BSL-3 & BSL-4) Conducting smoke tests to locate major breaches in containment envelopeConducting smoke tests to locate major breaches in containment envelope Breathing air systems (BSL-4)Breathing air systems (BSL-4) Compressed air systems for door seals (BSL-4)Compressed air systems for door seals (BSL-4) Efficacy testing of liquid effluent decontamination systems (BSL-3+ & BSL-4)Efficacy testing of liquid effluent decontamination systems (BSL-3+ & BSL-4)

Laboratory Accreditation & Certification Commissioning Team The following represents the typical composition of a commissioning team: Mechanical EngineerMechanical Engineer HVAC Controls specialistHVAC Controls specialist Electrical EngineerElectrical Engineer ArchitectArchitect Life Safety SpecialistLife Safety Specialist Operations & Maintenance SpecialistOperations & Maintenance Specialist

Laboratory Accreditation & Certification Estimated Cost of Commissioning The cost of commissioning varies greatly from project to project. The following are some of the reasons for this cost variance:The cost of commissioning varies greatly from project to project. The following are some of the reasons for this cost variance: Level (scope) of commissioningLevel (scope) of commissioning Starting point of commissioningStarting point of commissioning Complexity of projectComplexity of project Size of projectSize of project General cost associated for a typical commissioning project:General cost associated for a typical commissioning project: $1 - $3 per square foot$1 - $3 per square foot ½% to 3% of total construction cost½% to 3% of total construction cost General cost associated for a high containment (BSL- 3 & 4) laboratory:General cost associated for a high containment (BSL- 3 & 4) laboratory: $10 - $30 per square foot of high containment space$10 - $30 per square foot of high containment space 2% to 5% of total construction2% to 5% of total construction

Laboratory Accreditation & Certification Current and Proposed Laboratory Standards Related to Facilities ANSI/NSF 49 – Standard for BSC operationANSI/NSF 49 – Standard for BSC operation Certification availableCertification available Biotechnology – performance criteria for microbiological safety cabinets. BS EN 12469:2000. European Committee for StandardizationBiotechnology – performance criteria for microbiological safety cabinets. BS EN 12469:2000. European Committee for Standardization Certification availableCertification available Association for Assessment and Accreditation of Laboratory Animal Care, International (AAALAC)Association for Assessment and Accreditation of Laboratory Animal Care, International (AAALAC) Accreditation availableAccreditation available Laboratory Biorisk Management Standard (CEN Working Agreement 15793:2008)Laboratory Biorisk Management Standard (CEN Working Agreement 15793:2008) Certification not yet availableCertification not yet available

Laboratory Accreditation & Certification Financial and Technical Resources U.S. Department of State,U.S. Department of State, Biosecurity Engagement Program (BEP)

Laboratory Accreditation & Certification On-line Resources WHO Laboratory Biosafety ManualWHO Laboratory Biosafety Manual _11/en/ 2004_11/en/ Association for Assessment and Accreditation of Laboratory Animal Care, International (AAALAC)Association for Assessment and Accreditation of Laboratory Animal Care, International (AAALAC) Health Canada Laboratory Biosafety GuidelinesHealth Canada Laboratory Biosafety Guidelines CDC/NIH Biosafety in Microbiological and Biomedical LaboratoriesCDC/NIH Biosafety in Microbiological and Biomedical Laboratories International Veterinary Biosafety WorkgroupInternational Veterinary Biosafety Workgroup International Biosafety Working GroupInternational Biosafety Working Group

Laboratory Accreditation & Certification SUMMARY Biosafety begins with the laboratory users, not the secondary barrier,.i.e. the facilityBiosafety begins with the laboratory users, not the secondary barrier,.i.e. the facility Operational assurance of the facility begins with design and never endsOperational assurance of the facility begins with design and never ends Training for all personnel is keyTraining for all personnel is key Regularly scheduled maintenance is crucialRegularly scheduled maintenance is crucial Annual commissioning is recommendedAnnual commissioning is recommended

Laboratory Accreditation & Certification Questions/Comments?