CONSOLIDATION ON CIVIL ENGINEERING AND TECHNICAL INFRASTRUCTURE P. Alves, M. Nonis, P. Pepinster, W. van Baaren 6 th ST Workshop – March 2003.

Slides:



Advertisements
Similar presentations
17 May, 2011 BOARD PRESENTATION MAY 17, 2011 SUMMER PROJECTS UPDATE.
Advertisements

Call Before you dig Safe digging is no accident. Alberta Damage Prevention Council.
CERN IT Department CH-1211 Genève 23 Switzerland t Mobile services: Sunrise SWAP Rodrigo Sierra IT/CS.
Long shutdown 2013: Electrical distribution activities 09/03/2012 IEFC 2012 Workshop F. Duval on Behalf of EN/EL group.
CURRENT STATUS OF CV INSTALLATIONS, WORKS DURING LS1 AND PROBLEMS ENCOUNTERED DURING START-UP NORTH AREA Bill Bannister / Jani Lehtinen EATM – 7 th October.
1 FUTURE EXPLOITATION OF THE EAST AREA Infrastructure and Equipment - Civil Engineering issues. Jonathan Carr – GS / SE.
Cristiana Colloca GS/SEM – ATOP – MARCH 2009 Infrastructure Consolidation of Accelerators Injectors (civil engineering) Cristiana Colloca GS/SEM – ATOP.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
First Considerations on CLIC Cooling System Ch. Martel, J. Inigo-Golfin TS/CV.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
LHC Hardware Commissioning Review May 2005 T.Pettersson - EDMS: TS Department Utilities Safety Access SU - a plea for co-ordination of co-activities.
17.March Connection to the CERN Power System of the TT2 mercury target project by Karsten KAHLE (TS-EL)
Public Schools of Petoskey Upcoming Millage Issues Election on May 8, 2012.
1 EL Consolidation IEFC Workshop F. Duval on behalf of EN/EL
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
112/09/2013. Summary  Events on the network  Incidents  Network reconfigurations  Network operation  Update on activities  Tests  Projects and.
Introduction S. Baird 12 th September Accelerator Consolidation Workshop  Why are we here?  Boundary conditions  What is (not) included?  Outcome.
EN-CV during LS1: Upgrade, Consolidation, Maintenance, Operation M Nonis EN/CV Chamonix 2012 – LHC performance Workshop On behalf of EN/CV Group.
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
CERN campus: mapping of the building versus energy consumption and an example of design and construction of a green building. Luigi Scibile CERN, General.
ISOLDE: Status report building th ISCC meeting CERN, 31 March 2014 Erwin Siesling, Magda Kowalska.
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
6th ST workshop, Thoiry, 1-3 April ST-HM Design Section Strategy and working methods 3rd April 2003 C. Bertone ST-HM.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
About Us  We are a group of Mechanical Engineers specialized in Construction & Engineering Services.  Our mission is to provide highest quality of construction.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
Cooling and Ventilation Activities M. Battistin – EN/CV/PJ IEFC Workshop th March 2012 « CONSOLIDATION and UPGRADE PLANS for the INJECTOR COMPLEX.
HSE-LSA HSE procedure foresees a Launch Safety Agreement for all new project –this is since several year made systematically for all new projects. The.
R2E Mitigation Project P5 Relocation Options - Discussion R2E Mitigation Project CMS Relocation Options Towards An R2E Baseline 1 M. Brugger for the R2E.
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
J. Pedersen, ST/EL Consolidation of the CERN technical infrastructure and civil engineering. J. Pedersen ST 6 th ST workshop, Thoiry, 1 – 3 April 2003.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
5 th May 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 - May 5 th 2006 Michele Battistin (TS/CV/DC) TS M&O agreement for Detector Cooling installations.
Static Var Compensator Status (SVCs for Booster and SPS) Situation in 2009 Karsten KAHLE, TE-EPC ATOP days March 2009.
ATC/ABOC Days, 22 January 2007 The safety electrical networks at CERN Anne Funken, TS-EL.
Cooling & Ventilation feed-back M. Nonis – EN/CV.
LS2 Cooling & Ventilation Activities M. Battistin EN/CV Acknowledgements: P. Barriere, R. Bozzi, A. Broche, O. Crespo,
12th February 2010David Mcfarlane EN-MEF-ABA1. History of Booster The accelerator was built in The Proton Synchrotron Booster is the first, in the.
On behalf on EN-EL October 1 st, 2015 YETS Works EN-EL [ CF excluded ]
Consolidation needs for the Electrical Distribution, Control Cables and Optical Fibres Equipment F. Duval.
A second Thyristor Controlled Static Var Compensator for SPS
INFRASTRUCTURE CHANGES AND UPGRADES Presented by: Fernando Baltasar dos Santos Pedrosa in the name of the four LHC experiments.
PH Building Assessment Buildings 25,70, 155, 166 and 187 Safety Analysis.
Restarting Cooling, Ventilation for PS and SPS. PS /SPS days 2006.
How to keep the SPS running for another 25 years V. Chohan ( based on Input from N. Gilbert & many Equip. Groups) IEFC Workshop 12 th Feb 2010.
Essential Consolidation Items for LIU-PSB Collection from LIU-PSB WP holders.
EN-EL Activities for LS2 LIU, Consolidation, Maintenance, Operation Nicolas Bellegarde on behalf of EN-EL.
SMB SMB-SE group L. Scibile 1. SMB Mandate The SMB-SE Group is responsible to provide, to operate, maintain and to renovate the civil engineering infrastructures.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
Climate Change Transport Engineering Challenges: new rules towards new paradigm.
Roberto Saban/TSPS&SPS Days – January 2005 the background Following a request by the DG and after a comprehensive tour of the responsibilities of the Department,
POPS-B Project Update 07 June 2016 POPS-B: Project update and Feedback from POPS Experience LIU-PSB Meeting June 2016 Fulvio Boattini TE/EPC 2.
YETS & LS2 Works EN-EL / Power distribution
Situation of the Static Var Compensators at CERN.
EYETS Works EN-EL [ FC excluded ]
YETS & LS2 Works EN-El on LHC / Power distribution
AD consolidation activities in LS2
Background B513 built in early 1970’s for mainframe era.
Accelerator and Experiment Interface Session: LS2, LS3
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
the CERN Electrical network protection system
YETS & LS2 Works EN-EL / Power distribution
COOLING & VENTILATION INFRASTRUCTURE
Maintenance at ALBA facility: Strategy for the conventional services
LINAC 3 Meeting ICL machines Injectors
ILO Industrial Opportunities Days, 6-7 June 2019
Presentation transcript:

CONSOLIDATION ON CIVIL ENGINEERING AND TECHNICAL INFRASTRUCTURE P. Alves, M. Nonis, P. Pepinster, W. van Baaren 6 th ST Workshop – March 2003

Alves, Nonis, Pepinster, van Baaren - 6 th ST Workshop – Thoiry 2003 General Points Sources Something has already been done Criteria

Alves, Nonis, Pepinster, van Baaren - 6 th ST Workshop – Thoiry 2003 Introduction Age Obsolescence, spare parts availability Change of laws Age distributionCorrective roofs interventions per year

Alves, Nonis, Pepinster, van Baaren - 6 th ST Workshop – Thoiry 2003 HVAC, Electricity EquipmentBudget needed per year [kCHF] DurationTotal [kCHF] HVAC - replacement of obsolete equipment 3005 years1500 HVAC - control systems renovation3005 years1500 HVAC - eradication of asbestos2002 years400 HVAC - piping networks renovation1005 years500 Electricity –L.V. Switchboards renovation 1504 years600 Electricity – Replacement of Lighting equipment 1504 years600

Alves, Nonis, Pepinster, van Baaren - 6 th ST Workshop – Thoiry 2003 Building 860 Prevessin Heating Plant Prevessin Compressed air plant SPS, NEA Estimated cost: 1 MCHF

Alves, Nonis, Pepinster, van Baaren - 6 th ST Workshop – Thoiry 2003 Façades

Alves, Nonis, Pepinster, van Baaren - 6 th ST Workshop – Thoiry 2003 Roofs

Alves, Nonis, Pepinster, van Baaren - 6 th ST Workshop – Thoiry 2003 Roofs SITEBUILDINGS AREA TO RENOVATE [m2] ESTIMATED COST [kCHF] SPS BA2,BA3,BA4,…113951’824 Meyrin 13,112,113, 181,…136132’139 Prevessin 865,867, Total ’811

Alves, Nonis, Pepinster, van Baaren - 6 th ST Workshop – Thoiry 2003 Roofs Consolidation - cost increasing factors: Respect of today's technical standards Upgrade of thermal conductivity (depending on use) Safety measures during works Safety measures for future interventions (access ladders, handrails, lifelines, walkways) Points of discussion: Necessity of gravel protection Use of PVC instead of bitumen

Alves, Nonis, Pepinster, van Baaren - 6 th ST Workshop – Thoiry 2003 Underground structures Water problem LEP Jura – RE38 > finally watertight (?) Maintenance program of drainage system needed Ground pressure on headwalls UX45, UX85: OK - UX65 still to come? (800 kCHF) Tunnel heave in swelling rock During LHC construction (TI2, UD68) In existing tunnels (TT20, …)

Alves, Nonis, Pepinster, van Baaren - 6 th ST Workshop – Thoiry 2003 Cleansing A general analysis on all equipment and network is underway. Environmental constraints Cost

Alves, Nonis, Pepinster, van Baaren - 6 th ST Workshop – Thoiry 2003 Conclusions Several interventions needed for the whole infrastructure. Delaying interventions shall lead to higher problems and bigger repair costs. Intervention needs to be planned at short- medium term.