1 Profiling Working Group Update to COPS April 15, 2015 Jim Lee (AEP) – Chair Sheri Wiegand (TXU) – Vice Chair.

Slides:



Advertisements
Similar presentations
1 Distributed Generation Task Force November 5, 2007.
Advertisements

Profiling Working Group March 13, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for COPS Meeting March 13, 2007.
Technical Advisory Committee COPS Update to TAC Debbie McKeever COPs Chair 2010.
ERCOT Staff Comments Regarding the Proposed Suspension of Residential 2005 Annual Validation RMS Presentation August 10, 2005.
Profiling Working Group 1 PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting November 6, 2007.
Profiling Working Group January 11, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting January 11, 2006.
COPS Update to TAC January 6, Voting Items Three voting items: COPMGRR015, Creating Section 8, ERCOT Settlement and Invoice Process 2. 2.
February 26, 2015 and March 26, 2015 TAC Meeting Update to COPS Michelle Trenary, April 15, 2015.
LPGRR044 Distributed Generation (DG) Profile Segment Implementation Plan.
Profiling Working Group January xx, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting January ??, 2006.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
RMSUpdate January 6, 2005 Retail Market Subcommittee Update to TAC.
Profiling Working Group January 11, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting January 11, 2006.
Profiling Working Group August 2, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for COPS Meeting August 22, 2006.
1 Commercial Operations Sub-Committee Update to TAC October 5, 2007.
1 Presented to ERCOT Retail Market Subcommittee January 9, 2002 Profiling Working Group Darryl Nelson, Chair Load Profiling Operating Guides (LPOG)
Profiling Working Group December 11, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting December 11, 2003.
Commercial Operations Subcommittee (COPS) January 2014 Update to TAC 1/29/2015.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
Mandy Bauld ERCOT October 9, 2012 RTM SETTLEMENT TIMELINE.
Profiling Working Group March 14, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for COPS Meeting March 14, 2006.
1 PWG Update Report By Ed Echols Of Oncor ERCOT PWG Chair Jim Lee of Direct Energy ERCOT PWG Vice Chair for COPS Meeting Sept 10, 2014.
Demand Response Status Report Calvin Opheim October 9, 2007.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
Commercial Operations Sub-Committee Update to TAC December 4, 2008.
PWG Profiling Working Group March 20, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting March 20, 2003.
1 Profiling Working Group 2014 Accomplishments & 2015 Goals.
1 UFE Workshop Sponsored by COPS October 19, 2004.
October 9, 2012 Commercial Operations Subcommittee RMS Update Kathy Scott RMS Vice Chair.
Load Profiling Working Group RMS Presentation 8/01/2002 by Ernie Podraza Reliant Energy Retail Group Chair PWG.
Profiling Working Group October 16, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting October 16, 2003.
Commercial Operations Subcommittee Update to TAC September 7, 2012 Harika Basaran, COPS Chair 2012 Jim Lee, COPS Vice Chair 2012.
Direct Load Control Update Betty Day Manager of Load Profiling and Data Aggregation February 25, 2003 Retail Market Subcommittee.
Commercial Operations Subcommittee Update to TAC November 5, 2009.
DRG Slides for PWG Update to COPS. 2 Highlights from the DGTF Recommendation - 3 Small DRG applies to generation less than 50 kW –Profiling is applicable.
COPS NOVEMBER 2014 UPDATE TO TAC 11/20/2014 Harika Basaran, Chair Tony Marsh, Vice Chair.
Distributed Renewable Generation Profile Implementation Plan.
TX SET Update to RMS Wednesday, November 7, 2007.
1 Profiling Working Group Update to COPS October 14, 2015 Jim Lee (AEP) – Chair Sheri Wiegand (TXU) – Vice Chair.
Profiling Working Group August 14, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting August 14, 2003.
Demand Response Task Force. 2 2 Outline  Overview of ERCOT’s role in the CCET Pilot  Overview of Stakeholder Process – What’s been done to date?  Questions.
Direct Load Control Update Betty Day Manager of Load Profiling and Data Aggregation February 25, 2003 Retail Market Subcommittee.
Commercial Operations Subcommittee (COPS) Update to RMS 11/3/2015.
COPS DECEMBER 2013 UPDATE TO RMS 12/18/2013 Harika Basaran, Chair Jim Lee, Vice Chair.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
Commercial Operations Subcommittee (COPS) Update to TAC 2/25/2016.
Profiling Working Group January 14, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting January 14, 2004.
Oil and Gas Profile Implementation Plan. 2 BUSOGFLT Background ERCOT received Oil and Gas Profile Segment request ERCOT completed.
Commercial Operations Subcommittee Update to TAC Debbie McKeever COPs Chair 2011.
COPS SEPTEMBER 2014 UPDATE TO TAC 9/25/2014 Harika Basaran, Chair Tony Marsh, Vice Chair.
Profiling Working Group 1 PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting December 3, 2007.
Commercial Operations Sub-Committee Update to TAC January 8, 2009 Lee Starr, BTU.
1 ERCOT COPS Round 2 Sample Design Review April 10, 2007.
COPS JULY 2013 UPDATE TO TAC 07/02/2013 Harika Basaran, Chair Jim Lee, Vice Chair.
Mass Transition—Timelines & Volume Limitation RMGRR116—Acquisition Transfer Non-standard Metering Future Meetings 1.
PWG Long Term Strategy How do we maximize scarce resources?
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
Profiling Working Group 1 PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting June 11, 2007.
PWG Profiling Working Group December 18, RMS Presentation by Ernie Podraza, PWG Chair Annual Validation 2002 DLC Implementation.
Profiling Working Group September 26, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting September 26, 2003.
Commercial Operations Subcommittee (COPS) 4/15/2015 Update to RMS 5/5/2015.
Technical Advisory Committee Commercial Operations Subcommittee Update to TAC Debbie McKeever COPs Chair 2011.
1 Profiling Working Group Update to COPS May 13, 2015 Jim Lee (AEP) – Chair Sheri Wiegand (TXU) – Vice Chair.
Retail Market Subcommittee Update to COPS Kathy Scott January 14,
Commercial Operations Subcommittee (COPS) Update to RMS 9/1/2015.
LPGRR060, Load Profiling Guide Clean Up Related to LPGRR057
Commercial Operations Sub-Committee Update to RMS
Profiling Working Group
COPS MAY 2014 UPDATE TO TAC 5/29/2014
Commercial Operations Sub-Committee Update to TAC
Presentation transcript:

1 Profiling Working Group Update to COPS April 15, 2015 Jim Lee (AEP) – Chair Sheri Wiegand (TXU) – Vice Chair

LPGRR055, Extend Load Profile Model Calendar Inputs to 2030 LPGRR055 is an administrative change that extends the Load Profile Model calendar-related inputs in Appendix E: Profile Model Spreadsheets, from 2020 to The calendar inputs to be updated include:  calendar variables  daylight savings variables  sunrise/sunset times  holiday variables PWG reviewed LPGRR language and recommended approval of LPGRR055 as submitted. Next Step: PWG to review the Impact Analysis at the April 29th meeting. April 1 st Discussion: LPGRR055 2

Background: At a recent TAC meeting, the value and importance of the Load Profiling Guide was brought into question by a Market Participant. Their basis for asking the question was rooted in the fact that AMS deployment is nearly complete and whether the LPG serves the same purpose and function as it did before AMS metering. Although Michelle Trenary provided TAC with a very good response, the PWG felt it was necessary to re-evaluate the purpose of the LPG to provide more context to this topic. April 1 st Discussion: Value/Importance of Load Profiling Guide 3

Value/Importance of Load Profiling Guide: “Why do we still need it?” 4 Non-AMS ESI IDs – Need to have documentation of the rules which govern them AMS Data Gaps - Communication failures result in TDSPs relying on load profiles to estimate interval consumption Load Forecasting – By ERCOT and REPs Procurement – Allows for hedging strategies; Grouping of “classes” of customers Pricing – REP’s pricing systems may not yet be capable of utilizing AMS interval data during the price quotation process, so they utilize load profiles to accurately quote a customer a commodity price Settlement – During the time an AMS meter is provisioned, prior to the AMS Settlement flag being activated (up to 30 days), an ESI ID is settled in the market based on their load profile Marketing Efforts – Load profiles allow for segmenting / targeting groups of customers Classification of New ESI IDs – as new ESI IDs enter the market, a load profile is assigned utilizing the decision tree

Value/Importance of Load Profiling Guide: “Do Load Shapes Need Updating?” 5 In 2010, ERCOT performed extensive analysis on load shapes and their accuracy by analyzing the Load Research Sampling vs current load profile models Results varied based on the profile type and weather zone as the Mean Absolute Percent Errors (MAPE) ranged from 8.5% to 14.1% in the analysis Three options were presented to the market to address the issue: 1.Change Model structure 2.Refresh Current Model Coefficients 3.Leave Current Models (as is) Result: Market Participants were in favor of Option 3 based on the following reasons:  Overall improvement of new coefficients appeared to be marginal  Advanced metering was to replace NIDR Load Profile settlement  Technical & Business Resource constraints – competing resources needed for NODAL go-live & no desire to allocate additional resources for transition plan COPS/PWG discussion: “Does the need exist to review load shapes today?”

6 Next PWG meeting date: April 29 th – 1:30pm start time (WebEx only) Agenda items: LPGRR055 – IA review Draft LPGRR – Initial Profile Code Assignment for Temporary Services 2015 Annual Validation Kick-Off Protocol Section 18 Review

7