Global Wireless Emergency Recovery Disaster Preparedness

Slides:



Advertisements
Similar presentations
1 Industry Brief Apr Outline How is Alberta preparing? How is Alberta preparing? Albertas Health Response Albertas Health Response Albertas Operational.
Advertisements

IT Service Continuity Management
National Response Plan on Natural and Man Made Emergency Situations Emergency Management Department Ministry of Internal Affairs (MIA) of Georgia.
Museum Presentation Intermuseum Conservation Association.
Floridas Disaster Management. The 2004 Hurricane Season Tropical Storm Bonnie and Hurricanes Charley, Frances, Ivan and Jeanne occurred in a six-week.
Lesson 3 Responding to Emergency Events. For additional information or questions please contact Toledo-Lucas County Health Department APC:
Practical Preparations Planning for Safety and Emergencies.
IAEA Training in Emergency Preparedness and Response Module L-051 General Concepts of Exercises to Test Preparedness Lecture.
Hurricane Sandy. Sandy was the second-largest Atlantic storm on record Storm surge reached over 13 feet in coastal areas of New York and New Jersey The.
EMS Checklist (ISO model)
Martin County Emergency Management Agency. Is your business prepared to survive the economic impact of a major disaster? Are your company's valuable assets.
Piedmont Regional Voice over IP Pilot Project Law Enforcement Information Management Conference Greensboro, N. C. May 21-24, 2007 Major Dean Hairston,
Detail actions necessary to implement the interim housing mission in the post-disaster environment Identify command and control structures at all levels.
Pat A. Dennen Southern Region Administrator.  Fires are burning with greater intensity - sooner, they are lasting longer, with extreme fire behavior.
Hospital Emergency Management
COWs TRIDENT STRUCTURES PVT LTDWEBSITE :
SUNGARD PLANNING SOLUTIONS LESSONS LEARNED: SEPTEMBER 11 A Business Continuity Approach Barbara Allen SunGard Planning Solutions December 11, 2002.
DENR Disaster Response Center Purpose Purpose Activation Activation Operation and Responsibilities Operation and Responsibilities Phases of Response Phases.
US&R Planning. US&R Planning Issues Establish authority and responsibility Assess vulnerability and hazards Identify resources Coordination of response.
FCC Broadband Field Hearing Georgetown University Medical Center Deputy Chief Eddie Reyes Alexandria Police Department Thursday, November 12, 2009.
3/2004NAMB Church Preparedness1 Church Disaster Preparation.
Disaster Scenario Exercise for Organizational Planning Major Hurricane w/ Coastal and Inland Flooding & Tornadoes FEMA 2010 EXERCISE EXERCISE EXERCISE.
Disaster Scenario Exercise for Organizational Planning Chemical Accident FEMA 2010 EXERCISE EXERCISE EXERCISE.
Achieving Greater Success in Emergency Management by Preparing & Planning with Public Works.
Roles and Responsibilities Local Agencies and Responders.
Preparing Your Faith Community to Respond Is a disaster an opportunity to practice your faith?
Preparing Your Business for Emergencies: A Step-by-Step Guide.
Review of Power Blackout on Telecom P. J
EASTERN MICHIGAN UNIVERSITY Continuity of Operations Planning (COOP)
Healthy people/Healthy communities Disaster Planning and People with Disabilities.
ENP Study Group Disaster Planning Session #6 BROUGHT TO YOU BY: THE FLORIDA NENA EDUCATION COMMITTEE.
MODULE EIGHT: Emergency Preparedness Info from
Community Preparedness & Disaster Planning. Why Disasters occur ?
Module 3 Develop the Plan Planning for Emergencies – For Small Business –
HOMELAND SECURITY ADVISORY SYSTEM. Established after the terrorist attacks on America September 11, 2001.
RCPG Project Update 2013 Whole Community Conference November 22, 2013.
HAZUS-MH is a multi-hazard risk assessment and loss estimation software program developed by the Federal Emergency Management Agency (FEMA). (animate on.
Important points and activities.  The objective is to secure life, property, information in the event of a disaster and to facilitate business continuity.
1 Crisis Management / Emergency Management Overview.
National Communications System Briefing Template Hurricane Isabel: Government-Industry Partnership in Planning, Response and recovery CAPT J. Katharine.
Bernards Township Office of Emergency Management February 28, 2012.
REQUIREMENTS ON TELECOMMUNICATIONS FOR DISASTER RELIEF FROM THE INTERNATIONAL FEDERATION OF RED CROSS AND RED CRESCENT SOCIETIES Workshop on Telecommunications.
“Smells Like Trouble!” The LEA Disaster Response.
1 DHS Emergency Management Presenter: Frank Billard Director, Office of Facilities & Support Services Date: October 21, 2015 Georgia Department of Human.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Confidential 1 Supply Chain Risk Management – Chengdu EQ Lessons Learned John O’Connor Erica Agiewich.
Emergency Communication Plan and Equipment Requirements for Your Organization DRAFT 22 October 2007 Clip art images are a place holder for a photo of your.
Chief Harlin R. McEwen Chief of Police (Ret) City of Ithaca, NY FBI Deputy Assistant Director (Ret) Washington, DC Public Safety Spectrum Trust Chairman.
1 Verizon Florida, LLC Hurricane Season Preparation PSC Workshop – May 6, 2009.
1 © AT&T Knowledge Ventures. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Knowledge Ventures. Florida Public Service Commission’s.
2015 Hurricane Season Preparedness Briefing Jorge Puentes Engineering Manager – Northeast and Northwest Divisions March 18, 2015.
Verizon Florida, LLC Hurricane Season Preparation PSC Workshop – May 1, 2008.
Gloria Van Treese, Bureau Chief Florida Department of Agriculture and Consumer Services Food Distribution Bureau.
EXPECT THE UNEXPECTED Prepare Your Business for Disaster.
Qwest Communications Disaster Preparedness Overview 2003.
DSHS Deployable Teams. Deployable Teams 2011 Medical Incident Support Team - M-IST Ambulance Staging Manager - ASM Ambulance Strike Team Leader - ASTL.
AMP Technical Conference Mutual Aid April 28-29,2009 Host Community Responsibilities.
Communications Coordination Group (CCG). MISSION To facilitate interagency coordination and collaboration to provide efficient and effective pre-planning.
11 S I A M E M B E R C O M P A N I E S Satellite Industry Response to 2005 Hurricanes Satellites = Redundancy, Ubiquity, Interoperability.
Emergency Management An ongoing Work in Progress
Satellites = Redundancy, Ubiquity, Interoperability
District’s Plan for Disaster Preparedness.
Oman Experience on Telecommunications Emergency Plan
What happens when disaster strikes Florida?
According to “WHO”: “Disaster is any occurrence that causes damage, destruction, ecological disruption, loss of human life, human suffering, deterioration.
Disaster Preparedness
The Survival Plan.
Tahsis Emergency Programming
Presentation transcript:

Global Wireless Emergency Recovery Disaster Preparedness Tony Anastasio Tony.Anastasio@nortelgov.com 954-336-7445

Typical Types of Disasters Hurricanes, Typhoons Tsunamis Tornadoes Flash Floods or Flooding Fire – Brush, Forest, Building Earthquakes Terrorist Attacks Flood Tornado Flood Fire Earthquake

Disaster Preparedness Things to Consider (1/2) Network installed base information Off site storage of detailed engineering information, equipment lists Off site storage of current nodal backups/images Off site storage of critical database information (subscriber info) Current network interconnect diagrams Prepare for network overload Prioritize service for the 1st responders, 911 Ensure backup power systems are ready to go Generators, battery plants, UPS systems Generator refueling? Portable generators ready and tested? Adequate spare equipment on hand? Circuit packs Antennas and lines BTS’s COW’s Contingency Plans MSC loss (backhaul to another switch) BTS loss (replacement) Backhaul Loss (24x7 contact info and access to backhaul provider(s)) Infrastructure failure (PSTN interconnect, power)

Disaster Preparedness Things to Consider (2/2) Establish liaison with local/regional/state EOC’s Establish liaison with local/regional/state Law Enforcement Required for ingress / egress to disaster zone Establish liaison at the Federal level (as required) with FEMA, National Guard Determine who is the Lead Federal Agency and establish liaison Arrange for on demand security support Site security Personnel security Personnel Safety Lodging, Food, Water Safety gear e.g. Hard Hats, Chainsaws, Steel toe boots, heavy gloves, flashlights, etc Clothing appropriate for the location and disaster Immunizations (Tetanus) Communications First Aid training & kits Nearest functioning hospital emergency room Minimum of 2 personnel per recovery team Know location of Shelters (Fallout Shelters, Red Cross, Salvation Army, etc) Plan for Public Relations point of contact for Media inquiries

Disaster Preparedness Things to Expect Plan for Limited or No Access into disaster zone May be restricted or impossible for days/weeks Inability to refuel generators Plan for Loss of Security Lack of law enforcement in disaster area may lead to looting, riots, robberies, muggings or worse Expect to secure your own security teams for sites and technical personnel Plan for Loss of Commercial power Recent experiences highlight long delays in power restoration, in some cases 6-8 weeks Even if access is possible to the disaster zone, fuel may not be available to refuel generators due to lack of power at gas stations, fuel depots Plan to augment/replace local resources with others from outside disaster zone Plan for lack of lodging for recovery personnel in disaster zone Plan for lack of food, water for recovery personnel in disaster zone Plan for appropriate transportation, e.g. 4wd vehicles, boats, RV’s, etc. Plan for secure staging area

Disaster Preparedness Nortel Support Securing replacement hardware Typically not an issue Securing resources for installation and/or recovery Switch on Wheels (SOW) Can be created and made available in 3-7 days Provides limited capacity Requires infrastructure availability PSTN Interconnect BTS Interconnect ER will open a Disaster Response bridge for progress updates

Disaster Recovery Steps If you are involved in a disaster Account for and verify safety of all your personnel in disaster zone Contact Nortel Emergency Recovery to report the disaster, if we have not already contacted you first Work with Nortel ER to assess damage and your requirements for recovery ER will activate the Nortel Disaster Response Team (DRT) involving: Engineering Logistics Installation Supply Chain Customer Operations Account Team Technical Support Network Integration The DRT will secure replacement equipment on a priority basis The DRT will secure resources to install, commission and integrate the equipment The DRT will engage other DRT members as required for each customer and/or event The DRT operates 24x7 until stand down from the disaster is declared Where multiple customers are impacted simultaneously, Nortel will prioritize disaster response actions in accordance with the severity, the highest severity items will be managed first. You should provide a single point of contact (SPOC) for the DRT, acting as your Damage Assessment Prime

Execute “prep” steps in parallel. Disaster Management & Recovery Tornado Flood Advanced Warning Earthquake Hurricane YES Fire NO Early Prep (ER) Send email notification to all teams of potential disaster (Kick-off preparedness planning) Consolidate Potentially affected sites & existing equipment (feed to supply chain) Validate logistics (War Rooms, Communications, etc.) Communicate Prep status to executive team Gather resource help (GNPS, GNTS/TAS) Validate Disaster Preparedness documentation Disaster Hit Terrorism Execute “prep” steps in parallel. NO Stand Down YES Early Prep (COL) Collect Potentially affected sites & existing equipment Assess potential damage sites Send Disaster Preparedness documentation to potentially affected customers. ER War Room Hot Line Disaster Preparedness documentation Disaster Recovery (ER) Initiate Disaster Recovery Action Plan (War Room, Recovery, Communications, etc.) Coordinate all incoming calls for assistance (Customer & COL) Send executive status reports Early Prep (Supply Chain) Review Factory inventory and manufacturing capabilities against potentially impacted sites. Disaster Recovery (COL) Assign Disaster Assessment Prime Collect Site impact & Communicate to ER Prime Provide Periodic Status (as defined by communication plan) to ER coordination prime. Early Prep (Government relations) Engage government agencies & communicate plans to ER teams. Disaster Recovery (Supply Chain) Pre-stage equipment Communicate status to ER coordination Prime Disaster Hit Disaster Recovery (I&C) Resource Management Communicate status to ER coordination prime Stand Down NO YES

Buras Water Tower Collapsed on top of District 8 Council Building - Buras

Dynamics of Disaster Recovery Equipment Delivery & Installation Challenges (large scale disasters) Access (Road Closures) Security (Social unrest) Logistics (Lodging, Food, Gas) Health Concerns (Contamination/Disease) Evacuee Telecommunications Requirements Cellular Roaming Evacuee Centers “Non-Traditional” Customers FEMA (1-800 Help Line) Government Agency Interaction 1st Responders Support Access Security Logistics Health Re-Home – Containerize – Replace

Alternative Solutions Choosing the Best Path Containerized Systems Network Facilities must be in place at the point of replacement Containerized Solutions are NOT a like-for-like replacement (usually smaller) Environmental conditions must support bringing in containers and Human Resources to set-up and run the temporary facility. Office Re-Homing While Geographic Survivability is not typically part of standard network designs, Tandem office re-homing can usually be accomplished with minimal effort. Only partial Network Facilities required Environmental conditions at point of loss not an issue End Office re-homing (lines) is more difficult, but depending on the nature of the disaster, line “users” are also displaced and land-line facilities are also destroyed. This allows time for more conventional office replacement. Office Replacement If time, physical facilities, and environmental conditions permit, replacing the equipment in the current facility is always the best alternative

CDMA MTX SOW

CDMA BSC SOW

CDMA HUB site PSTN 48 CMI BTS sites CDMA MTX CDMA BSC CBRS 416 PSTN T1s or DS3 or OC3 Optera SPM PSTN CDMA HUB site 320 SBS T1s Muxed to OC-3 MW Radio Gear 114 BTS T1s microwave CDMA BSC Optera 11p FP ESEL SBS frames Optera CBRS 48 CMI BTS sites

Commercially Available COW’s (Cell Site on Wheels) Pictures courtesy of Ft. Worth Tower, Inc. and Aluma Tower Co. Inc.