City of Los Angeles Personnel Department Mobile Application Team 02:Shreya kamani Anushree Sridhar Pattra Thongprasert Abhishek Trigunayat Travis Jones.

Slides:



Advertisements
Similar presentations
Software Quality Assurance Plan
Advertisements

System Construction and Implementation Objectives:
Tutorial 9 Lanjun Zhou SEEM Outline Introduction to Assignment Phase 4 Transition to the new System (Chapter 13) – Making the transition to the.
USC Football Recruiting Database System. Team 6 Client: Jared Blank with USC Football. Revati Kadu Natasha Karnik Akshay ArasMike Nicosia (IV & V) Abhishek.
Chapter 3 Project Initiation
Reference and Instruction Automated Statistics Gathering and Reporting System Members: Patrick Chen (pyc7) Soo-Yung Cho (sc444) Gregg Herlacher (gah24)
Software Project Transition Planning
APPLICATION DEVELOPMENT BY SYED ADNAN ALI.
SE Document Document Control Software. SE Document SE Document is a Document Management Software System to help you meet all document control requirements.
Chapter 3 Project Initiation. The stages of a project  Project concept  Project proposal request  Project proposal  Project green light  Project.
The Agile vs. Waterfall Methodologies Systems Development:  the activity of creating new or modifying / enhancing existing business systems.  Objectives.
ONLINE TECHNICAL REPORT SYSTEM Team Crash Course Ryan Ashe, Eileen Balci, James Kirk, Taylor Paschal.
City of LA Personnel Department Mobile Application Team 02 1.
Network security policy: best practices
IT 499 Bachelor Capstone Week 9.
Medical Application Giant Squid Michal Cohen Robet Esho Chris Hogan Kate Kuleva Nisha Makwana Alex Rodrigues Rafal Urbanczyk.
TRR ARB Presentation Women at Work Website Redesign.
Senior Design 2010 Group 10.  Students  Nathan Dane  Jamin Hitchcock  Eric Tweedt  Advisor  Tien Nguyen  Client  Mary Greeley Medical Center 
Healthy Kids Zone Team Introduction Chad Honkofsky 2.
Server Virtualization: Navy Network Operations Centers
Introduction to RUP Spring Sharif Univ. of Tech.2 Outlines What is RUP? RUP Phases –Inception –Elaboration –Construction –Transition.
September 10, Agenda Welcome Updates Reminders New CT.gov Site Questions & Comments.
DBS to DBSi 5.0 Environment Strategy Quinn March 22, 2011.
Web Trnsport – Beta Testing and Implementation TUG Roundtable Discussion Elizabeth Rodgers Info Tech, Inc. October 9, 2007.
GUEST REGISTRATION ADVANCEMENT BY SUNNY SOLUTIONS (G.R.A.S.S) Acceptance Test 05/01/ GUEST REGISTRATION ADVANCEMENT SUNNY SOLUTIONS ACCEPTANCE TEST.
Elockbox Team08 Fall2014 Jian Lei Role(s): Project Manager / Builder Da Lu Role(s): Prototyper / System/Software Architect Cheng Role(s):Feasibility Analyst.
Software Engineering Project: Research Expert Prabhavathi Kumarasamy Joshua Thompson Paul Varcholik University of Central Florida.
LOSE4GOOD.ORG (BY TEAM 08) PROMOTE HEALTHY LIVING.
Group Project Tools Ahmad Alnafoosi, Kathy Drew, Doug Schultz.
Executive Summary Target Deployment – January 4, 2005 Actual Deployment – December 22, 2004.
1 SMART Training Update – May 2011 Michaela Butterworth.
REAL TIME GPS TRACKING SYSTEM MSE PROJECT PHASE I PRESENTATION Bakor Kamal CIS 895.
RUP Deployment RUP Deployment Workflow
Bina Nusantara 19 C H A P T E R SYSTEM CONSTRUCTION AND IMPLEMENTATION.
Program Assessment User Session Experts (PAUSE) Information Sessions: RSS & Subscription Services October , 2006.
State of Georgia Release Management Training
Timesheet training Version: Introduction Duration: 1.5 hours Purpose: Guide on how to use Timesheet.
Business Continuity Planning for OPEN OPEN Development Conference September 18, 2008 Ravi Rajaram IT Development Manager.
Illuminating Britelite’s Internal Services for Success Strategy for Process Improvement.
Equations for Ecademy Client: ISU Computation Center Faculty Advisor: Dr. Robert Anderson Technical Advisor: Dr. Pete Boysen Team Members:  Tim Arganbright,
Thrdplace Social Networking Team #7 1. TRR Outline Operational Concept Overview System benefits to Customer 1.Introduction Demo of System Operational.
1 Sean Aluoto Anthony Keeley Eric Werner. 2 Project Plan Overview Project Lifecycle model Time line Deliverables Organization plan Risk management Design.
Chapter 7: Delivery, Installation, and Documentation Ronald J. Leach Copyright Ronald J. Leach, 1997, 2009, 2014,
January 21, 2010 Project Status Report.  Introduction  Meeting Minutes Approval  Project Status Report  Other Business  Public Comments  Review.
Milestone Two – Reach Across Houston (RAH) Tuesday, June 14, Team:Matthew Edwards Thomasina Coates Michelle Graham James Henrydoss James McNicholas.
Component D: Activity D.3: Surveys Department EU Twinning Project.
Base Camp Software Team Project Tools. BaseCamp Software Basecamp is an online project management and collaboration tool Free plan is available but does.
LA Personnel Department Mobile Application Team 02: SHREYA KAMANI - Project Manager ANUSHREE SHRIDHAR - Software Architect DIVYA REDDY - Requirements Engineer.
Architecture Review 10/11/2004
Cash Doctor 3.0 Mobile Application
Managing the Project Lifecycle
Transitional Readiness Review Team 08
ShareTheTraining TRR ARB Presentation Team 11
DCR ARB Presentation Team 5: Tour Conductor.
City of LA Personnel Department Mobile Application
Diabetes Health Platform
COSMIC - SYSTEM TRR PRESENTATION
Team - 03 Transition Readiness Review
Diabetes Health Platform
Mission Science By Team 07.
Course: Module: Lesson # & Name Instructional Material 1 of 32 Lesson Delivery Mode: Lesson Duration: Document Name: 1. Professional Diploma in ERP Systems.
ARB Schedule Locations
Systems Construction and Implementation
CS577a Software Engineering ARB #2 Workshop
Team 7- SCRIPTONOMICS Advanced movie script analytics made simple
Systems Construction and Implementation
Transition Readiness Review
Transition Readiness Review
Team 7- SCRIPTONOMICS Advanced movie script analytics made simple
Presentation transcript:

City of Los Angeles Personnel Department Mobile Application Team 02:Shreya kamani Anushree Sridhar Pattra Thongprasert Abhishek Trigunayat Travis Jones William Everton 1

TRR Outline 1. Introduction 2. Demo of Initial Operational Capability - Abhishek and Anushree 3. Test Cases, Procedure and Results - Travis 4. Quality Focal Point - William 5. Support Plan - Anushree 6. Summary of Transition Plan - Pattra 2

System Purpose Mobile application that provides Critical information to applicants interested in employment opportunities with City of LA Allow users to subscribe to a specific job The system will send notification via and/or text message for reminding that the position is open 3

Capability goals - Completed! 4

Demo of IOC - Creating User Profile 5

Demo of IOC - Search by Name / Job ID 6

Demo of IOC - Subscribe to a Job 7

Demo of IOC - View All Open Jobs 8

Demo of IOC - Viewing LA Police Department Jobs 9

Test Plan and Cases 10

Test Procedures Testing done by team tester Acceptance testing done by client at CCD 11

Test Cases USE CASETEST CASE UC01: Create/update user profileTC-05-01: Create/update user profile details UC02: View Open JobsTC-02-01: View current open jobs UC03: Search all jobsTC-01-01/02: Search existing jobs by keyword of job ID UC04: VIew job descriptionsTC-03-01/02: View job descriptions for existing jobs and open jobs UC05: Subscribe for notificationsTC-04-01: Subscribe for notifications UC06: Notification for job openingsTC-06-01: Receive notification for open jobs UC07: Process Neogov RSS feedTC-07-01: Process Neogov RSS Feed UC08: View police department jobsTC-08-01: View LAPD jobs 12

Test Results Bugs found: o #1264: unable to return from LAPD site o #1265: user profile refresh o #1266: case-sensitive search o #1292: “Back” button for iOS Concerns: o List results in alphabetical order 13

Quality focal point 14

Traceability Matrix 15

Metrics 16

Metrics, cont. 17

Metrics, cont. 18

Burndown 19

Burndown, cont. 20

Lessons Learned Benefits of Feedback Sessions The team did not utilize group feedback sessions to share lessons learned. In many agile software development teams, these feedback loops provide a way for the team to learn as a whole and as individuals. Scheduling is Difficult Students have different classes, assignments, and personal lives. Working around each others’ schedules is paramount for cohesive teamwork. Scheduling in advance provides all parties with time to prepare and plan for the next milestone. Communication Every team can stand improvement for better communication. Since the entire team is not collocated in Los Angeles, it is even more important that we have clear discussions regarding tasks and intent. Software Effort is Difficult to Estimate As engineers, we often times underestimate the effort required in a task. Our team has done a good job at evolving their task estimations, which has helped in planning and scheduling. 21

Support and Transition Plan 22

Support Plan The system has been tested locally by the development team and it is working. Unfortunately we will be unable to test the system on a live environment has it will take time to receive permission to deploy. Deployment and further bug fixes will be the responsibility of the client. We will provide a system admin manual to assist in this process. 23

Transition Concerns Development team was notified that the transition on real site at Personnel IT department couldn’t be done as scheduled. The system must be reviewed by City of LA Board before deployment. The review process - unknown period and details Development team will deliver all the final deliverables to clients along with the manual for deployment so that client’s staff would be able to do it after the decision has been decided. 24

Transition Strategy Delivery method depends on clients preference (Discuss in TRR ARB session). 1.All deliverables will be made into physical products and deliver to client on the decided date. 1.All deliverables will be uploaded on Team website. Client will be provided with the link to download. Available until 2 nd May

Hardware Preparation The decision on installing the existing server or purchase of a new server would depend on the executive board’s decision and policies. Staff would require around 6 to 8 hours to prepare the hardware. If the hardware were existing and being reused the preparation time would be minimal. The IT department will get the necessary approvals for hardware installation from the concerned authorities. 26

Software Preparation The packaging of software would be in form of EAR/JAR/WAR (Enterprise Archive, Java Archive, Web Archive) and script files Open source except for the database (DB2) Android IDE and Xcode The IT department will get the necessary approvals for software installation from the concerned authorities. 27

Site Preparation DB2 must already be installed on the server If the system will be installed on the existing server, the server needs to be backed up before doing the transition Must have at least one computer that has access to internet and installation server. IT department would be responsible for the security on the site. The server should be protected by a password at all times and only an administrator should have access to it. 28

Transition Schedule 29

Additional Documents & Activities System Administrator Manual Source Code Baselines including comments in the source files Training o 04/01/14: Overview of server application and mobile app o Upon request - Discuss in TRR ARB session 30

Thank You 31