Future Water Supply - for the Ashley Valley D. Gerard Yates Central Utah Water Conservancy District.

Slides:



Advertisements
Similar presentations
Amherst , MA, Drinking Water System Atkins Water Treatment Plant
Advertisements

Arsenic/Iron Co-Precipitation and High Rate Filtration in the City of Portage Christopher Barnes, P.E., City of Portage Kendra Gwin, P.E., City of Portage.
QUOTE FOR THE DAY Whoever gossips to you will gossip about you. - Spanish Proverb - You are what you think. You are what you go for. You are what you do!
© 2013 O’Brien & Gere Volute Press Application on Water Treatment Residuals 2013 NYC Watershed / Tifft Science & Technical Symposium September 19, 2013.
Anne Arundel County Department of Public Works
The Town of Discovery Bay Community Services District Wastewater Treatment Plant Master Plan NOVEMBER 9, 2011.
CE 370 Filtration.
Benjamin C. Whitehead, PE Benjamin J. Klayman, PhD, PE Case Study: Commissioning New Rapid Sand Filters at Donald K. Shine Water Treatment Plant.
City of Oshkosh Water System. Public Works Utility Division Water Filtration Plant Water Distribution System Wastewater Collection System Pumping Stations.
Brushy Creek Municipal Utility District Water Facility Project Status Update Presented at April 9, 2009 Board Meeting Joseph Jenkins, P.E., CH2M HILL.
Surface Water Treatment Plant
Presented by Chris Stone Assistant Deputy Director Water Resources Division.
Improvement of the Capacity of Drinking Water Treatment Plant in East Quantara (Case Study) Dr. Eng. Ibrahim Khaled El-Sayed Chairman 1North & South Sinai.
Water and Wastewater Treatment Processes Crystal Penton, E.I. Will Larsen, E.I.
Water Treatment for NYC Croton Schematic. NYC Filtration Plant for Delaware and Catskill Systems  Filtration avoidance criteria  Alternatives to Filtration.
Water Treatment for NYC Croton Schematic. NYC Filtration Plant for Delaware and Catskill Systems ä Filtration avoidance criteria ä Alternatives to Filtration.
NYC Filtration Plant for Delaware and Catskill Systems ä Filtration avoidance criteria ä Alternatives to Filtration? ä Where should the plant(s) be located?
Molalla Water Treatment Plant Field Trip 4/24/07 Molalla Water Treatment Plant Field Trip 4/24/07.
History In 1932 Plymouth constructed its first wastewater treatment plant In 1959 they transferred the sewage utilities over to Plymouth Utilities.
Water Supply and Sewage Year 7 Unit 4.4. Water debate Is it ok to drink recycled sewage? Is it ok to drink recycled sewage? With Australia in the grips.
Requirements to produce high quality water Stephen Stanley, Ph.D., P.Eng. EPCOR Water Services.
City of Atlanta Department of Watershed Management Bureau of Drinking Water.
Simple Tabletop Exercise Objectives:  Evaluate cyber security protocols and procedures  Consider to what degree reliance on SCADA Systems is appropriate.
Surface Reservoir Storage Operations 2011 Public Utilities Department Public Utilities Department ( (Water Operations Branch)
Overview and Project Approach  Clinton is currently experiencing surface water supply shortages in their raw water source, Clinton Lake, and has been.
Moving Bed Biofilm Reactor Retrofit for Ammonia and Nitrate Removal
Sewage Treatment. Reducing Water Pollution through Sewage Treatment Septic tanks and various levels of sewage treatment can reduce point- source water.
United Water & Sanitation District Stonegate Village Metro District Water Supply Opportunities 1.
Equus Beds ASR Program – Wichita’s Future Water Supply September 6, 2012.
Buckhorn Disinfection Byproducts / Backwash Disposal Project Board of Directors Meeting June 14, 2012.
Water Treatment Processes. Why do we need to treat our drinking water?  Industrial runoff  Agricultural runoff  Road runoff  Residential runoff.
Water System Planning Study
Water treatment Lilly Corradi.
The Orange County Water District Riverbed Filtration Pilot Project Jason Keller 1, Michael Milczarek 1, Greg Woodside 2, Adam Hutchinson 2, Adam MP Canfield.
1 Full-Scale Testing of Innovative High Rate Filter Media for Plant Expansion Bob Raczko, P.E. United Water.
Using ASR as a Component of Managing Water Supply & Growth, City of Dallas, OR Using ASR as a Component of Managing Water Supply & Growth, City of Dallas,
IRP Approach to Water Supply Alternatives for Duck River Watershed: Presentation to XII TN Water Resources Symposium William W. Wade Energy and Water.
Committed to providing safe, high quality water and related business services earning customer trust and confidence. Louisville Water Company Capital Program.
Generally speaking, water is a colorless, transparent, odorless, tasteless liquid that forms the seas, lakes, rivers, and rain and is the basis of the.
Practical period in Windhoek
Infrastructure management system Managers and engineers need clear guidelines for life-cycle management of infrastructure systems for water, sewer, and.
Portland Drinking Water. Bull RunBull Run--Source primary drinking water supply for Portland Located 26 miles from downtown Portland in Sandy River basin,
1 NORTH VALLEY REGIONAL WATER AND WASTEWATER PROJECTS MEETING OF THE NEW MEXICO-TEXAS WATER COMMISSION May 19, 2005.
November 17, 2015 Charting the Future of Water Reuse for the City of Raleigh Sheryl D. Smith, P.E. – CDM Smith Eileen M. Navarrete, P.E., PMP – City of.
Alabama Water Resources Conference Perdido Beach, Alabama Mac Underwood, General Manager BWWB BIRMINGHAM WATER WORKS BOARD Sustainability of Water Supply.
NC AWWA-WEA 2015 Annual Conference Monday, November 16, 2015 The Use of Chlorine Dioxide to Reduce TOC at Davidson Water, Inc. Water Treatment Plant.
Considerations and operational challenges in choosing Membrane Filtration for a Water Treatment Plant Upgrade Ed Cross Division Manager, Water Supply and.
Surface Water Plants Hueco Wells Mesilla Wells. Drilling Fresh Water Wells; Both Bolsons.
Water Treatment Plant Austin and Alison.
EXPANSION OF BRUNSWICK COUNTY’S NORTHWEST WATER TREATMENT PLANT Public Utilities.
© 2014 HDR Architecture, Inc., all rights reserved. © 2014 HDR, Inc., all rights reserved.
The Orange County Water District Riverbed Filtration Pilot Project Jason Keller 1, Michael Milczarek 1, Greg Woodside 2, Adam Hutchinson 2, Robert Rice.
Update on RCR Permitting
Aqua por la vida BBS SEMARANG GROUP.
The Los Angeles Aqueduct Filtration Plant An Overview of Facilities and Operations.
Silicon Valley Advanced Water Purification Center And Future of Purified Water Use Tour Guides: Miguel Silva Tour Coordinators: Amy Fry, Michelle Pelayo-Osorio.
1 Highland Water District CAPITAL IMPROVEMENT PLAN.
Safe, Clean and Drinkable
Water Filtration Plant Improvements Project Summary
AquaSel Brine Concentration Pilot Project Update
Richland Creek Water Supply Program Briefing
Amherst , MA, Drinking Water System Atkins Water Treatment Plant
North Texas Municipal Water District “Regional Service Through Unity … Meeting Our Region’s Needs Today and Tomorrow” Water Supplies Vital for the Future.
Flow Equalization Jae K. (Jim) Park Dept. of Civil and Environmental Engineering University of Wisconsin-Madison.
Southwest Section AWWA 2018 – Baton Rouge, LA
Adapting to a New Era: Declining Flow and Deteriorating Water Quality
Case Study: Lebanon Water Works
Lebanon Water Works National Optimization Goals Case Study - Meeting the Goals at the Lebanon Water Works Company Daren Thompson, MBA, MPM.
Trihalomethanes Removal Evaluation
MANILLA WATER SUPPLY UPGRADE
Presentation transcript:

Future Water Supply - for the Ashley Valley D. Gerard Yates Central Utah Water Conservancy District

Ashley Valley Water System Overview

Red Fleet Reservoir 1982 operation 26,000 Acre Feet

Red Fleet Dam

Red Fleet Pump Station 1985 operational 5 pumps / 2 - 8cfs (600 hp) 3 – 16cfs (1250 hp) (5/10 mgd)

Uintah Water Conservancy District

Tyzack Pipeline and Raw Water Bypass Chocolate Rock Pump Station - T2 & T3 1.5 mgd each

Ashley Valley Water Treatment Plant (CUWCD)

2 Source Waters Ashley Springs / Red Fleet

Ashley Valley Water SID Treatment Plant

1 Direct Treatment Source 2 Ways to Exchange

Treatment Plant Overview Two Water Treatment Plants serve the valley Each plant has been in service for more than 25 years – delivering high quality water Each plant has experienced increased demands and challenging raw water quality Each plant has experienced production limitations during poor water quality events Changes in drinking water regulations present challenges at each plant Peak production at each plant is 6-7 MDG (CUWCD rated capacity was15 MDG – AVWSID plant rated capacity 8 MGD)

Ashley Valley Water Treatment Plant Process Improvement Project

General Plant Process Limitations QUALITY (Lack the ability to sufficiently address increasing disinfection by-product formation) QUANTITY (Lack the ability to treat degrading quality raw water ( 20 NTU for 3 hours or >30 NTU) EFFICIENCY (Short “unit filter run volumes” result in higher operating costs and solids handling challenges – long hours for plant staff)

Process Improvement Evaluation Evaluate if the existing direct filtration process is suitable from a regulatory perspective for both sources Evaluate the reliable plant capacity achievable with direct filtration What new processes would be required to reliably produce at the plant rated capacity? What new processes would be required to reliably meet present and future drinking water regulations

Zeta Potential Dissolved Air Flotation U.V. Pilot Plant Testing Jar Testing

Source Water Differences ?

Site Constraints - geology 17 Acres – 20 MGD – ? Expansion to 30 MGD

Direct or Conventional ?

Filters / Under drains ?

Solids Handling ?

Finished Water Storage

Disinfection By-Products ? Duchesne Valley – Ozone Ashley Valley – Conventional & Blending Utah Valley – Ozone & Conventional

Data and Process Evaluation (Decision Making)

Ashley Valley Plant Decisions Reliably treat 20 MGD Construct a new initial hydraulic mix and chemical feed system (lead and copper) Construct a new floc / sedimentation process (direct to conventional) Construct new deep-bed filters with full- rate filter to waste, a new underdrain system, and convert from declining rate filters to constant rate constant level

Ashley Valley Decisions Continued… Construct new a new “backwash” waste water clarifier Install a chlorine scrubber

Flocculation/Sedimentation

2 New Plate Settlers

6 Constant Level – Deep Bed Filters

New Flash Mix

New Backwash Clarifier

Ne w Chemical Feed System

New Chlorine Scrubber

Old Plant / New Plant 15 MGD - unreliable 20 MGD - reliable

Plant Results to Date The Ashley Valley Plant has been in operation for 9 months (with all Process Improvements Operational) and is meeting all goals and objectives. The plant is rated for 20 MGD One shift per day operation

Ashley Valley Total Plant Production Both plants peak daily average is 6.5MGD AVWSID plant = 8 MGD CUWCD plant = 20 MGD 2012 production both plants = 7365 acre feet 10 year average = > 30 percent production increase Present growth rate in 10 years the valley will need an additional 2400 acre feet of treated water.

Uintah County Population Growth = 22.6%

Vernal City Water System 27% / 16%

Ashley Springs is a limited supply Spring highest production = poor quality

Red Fleet Reservoir (Brush Creek Spring) The Future Supply for the Valley 2000 Acre Feet Presently Petitioned 3300 Acre Feet – Presently Available (2400 needed within 10 years) 12,000 Acre Feet – Additional Jensen Unit Water available with addition of the Burns Bench Pump Station.

There is More Than One Way to Get a Drink of Water in the Ashley Valley Questions????