Project Plan for VMC. VMC Project [1.0.0] [labor-hour = 1956 hr] Project Management [1.1.0] [labor-hour = 196 hr] System Engineering [1.2.0] [labor-hour.

Slides:



Advertisements
Similar presentations
1 Yell / The Law and Special Education, Second Edition Copyright © 2006 by Pearson Education, Inc. All rights reserved.
Advertisements

Artrelle Fragher & Robert walker. 1 you look for the median 1 you look for the median 2 then you look for the min and max 2 then you look for the min.
$1 Million $500,000 $250,000 $125,000 $64,000 $32,000 $16,000 $8,000 $4,000 $2,000 $1,000 $500 $300 $200 $100 Welcome.
ThemeGallery PowerTemplate
Fill in missing numbers or operations
Name: Date: Read temperatures on a thermometer Independent / Some adult support / A lot of adult support
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
Prof. Dr. Hans-Jürgen Scheruhn | Online Process Management Hochschule Harz Wernigerode University for Applied Sciences Prof. Dr. Hans-Jürgen.
Ozone Level ppb (parts per billion)
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 116.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 107.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 40.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 28.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 44.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 58.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 75.
Zm Chr1 (50-200cM) SBI-01 Zm Chr5 (0-75cM) Zm Chr9 (40-100cM) ESM Figure S3. Sorghum/maize DTF QTL synteny between sorghum and maize chromosomes. Sorghum.
Win Big AddingSubtractEven/Odd Rounding Patterns Q $100 Q $200 Q $300 Q $400 Q $500 Q $100 Q $200 Q $300 Q $400 Q $500 Last Chance.
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
| Slide 1 SEEAW Emission Accounts Calculation Examples and Supplementary Information Chile, 1-4 June, 2009 Technical Workshop on the Preparation.
Mallard Island Large Rivers Loading: Monitoring WY 2010 Nicole David Sources, Pathway, and Loading Work Group May 27, 2009 Item #4.
Fractions Sums with whole numbers and singular fractions.
Office for Harmonization in the Internal Market (Trade Marks and Designs) 9th Designs Liaison Meeting – 7 October 2010 – Item No. 4.
2007 ITBS/ ITED Results Cedar Rapids Community Schools.
1 1  1 =.
1  1 =.
Year 6 mental test 15 second questions Numbers and number system Numbers and the number system, Measures and Shape.
Who Wants To Be A Millionaire?
I can interpret intervals on partially numbered scales and record readings accurately ? 15 ? 45 ? 25 ? 37 ? 53 ? 64 Each little mark.
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
Welcome to Who Wants to be a Millionaire
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
Year 6/7 mental test 5 second questions
$100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400.
Real World Applications: Phone Charges Health Club Fees Vacation Expenses (renting an airplane) Business (Teddy Bear sales) Business (Tote bag sales)
1 Lecture 2: Metrics to Evaluate Performance Topics: Benchmark suites, Performance equation, Summarizing performance with AM, GM, HM Video 1: Using AM.
Break Time Remaining 10:00.
This module: Telling the time
DOROTHY Design Of customeR dRiven shOes and multi-siTe factorY Product and Production Configuration Method (PPCM) ICE 2009 IMS Workshops Dorothy Parallel.
AirWatch United Kingdom Pricing Mobile Device Management Including Mobile Application Management and Mobile Management Effective April 1, 2012.
Portable Instruments & Area Monitors
Mike Rux JR. Sprint Car Racing. Racing Expenses Methanol-$3.89 a gallon 55 gallons per race= $ Entry Fees- $30.00 per person for crew=$ Pill.
15. Oktober Oktober Oktober 2012.
Sprayer Economics Gary Schnitkey University of Illinois.
Constant, Linear and Non-Linear Constant, Linear and Non-Linear
Making Landmark or Friendly Numbers (Multiplication)
Created by Susan Neal $100 Fractions Addition Fractions Subtraction Fractions Multiplication Fractions Division General $200 $300 $400 $500 $100 $200.
We are learning how to read the 24 hour clock
Comparison of X-ray diffraction patterns of La 2 CuO 4+   from different crystals at room temperature Pia Jensen.
Want to be a xxxxx? Welcome to College Name Click here to start.
MOTION. 01. When an object’s distance from another object is changing, it is in ___.
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
3 SUPPLY AND DEMAND II: MARKETS AND WELFARE. Copyright © 2006 Thomson Learning 7 Consumers, Producers, and the Efficiency of Markets.
3 SUPPLY AND DEMAND II: MARKETS AND WELFARE. Copyright © 2010 Cengage Learning 7 Consumers, Producers, and the Efficiency of Markets.
Equal or Not. Equal or Not
Types of clocks. Types of clocks Sand clock or Hourglass clock.
Number bonds to 10,
Beat the Computer Drill Divide 10s Becky Afghani, LBUSD Math Curriculum Office, 2004 Vertical Format.
Bell Schedules Club Time is available from 8:05-8:20  1 st 8:20 – 9:15  2 nd 9:20 – 10:10  3 rd 10:15 – 11:05  4 th 11:10 – 12:50 A(11:10)
Fractions Simplify: 36/48 = 36/48 = ¾ 125/225 = 125/225 = 25/45 = 5/9
Clock will move after 1 minute
Partial Products. Category 1 1 x 3-digit problems.
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
01. Consider the following code segment. int x = int n = 0; if (x < 500) { if (x > 750) n = 100; else n = 200; } else { if (x < 300) n = 300; else n =
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
Presentation transcript:

Project Plan for VMC

VMC Project [1.0.0] [labor-hour = 1956 hr] Project Management [1.1.0] [labor-hour = 196 hr] System Engineering [1.2.0] [labor-hour = 320 hr] Subsystem Development [1.3.0] [labor-hour = 1250 hr] System Integration and Testing [1.4.0] [labor-hour = 100 hr] Purchase [1.5.0] [labor-hour = 20 hr] Project Support [1.6.0] [labor-hour = 70 hr] Project Execution Plan (PEP) [1.1.1] [labor-hour = 80 hr] Project Monitor & Control [1.1.2] [labor-hour = 80 hr] PEP Review [1.1.3] [labor-hour = 16hr] System Requirement Analysis (SRA) [1.2.1] [labor-hour = 110 hr] SRA Review [1.2.2] [labor-hour = 4 hr] System Design Specification (SDS) [1.2.3] [labor-hour = 100 hr] SDS Review [1.2.4] [labor-hour = 3 hr] System Test Document (STD) [1.2.5] [labor-hour = 100 hr] STD Review [1.2.6] [labor-hour = 3 hr] VMC-REM Design & Testing [1.3.1] [labor-hour = 250 hr] VMC-PSS Design & Testing [1.3.2] [labor-hour = 250 hr] VMC-AM Design & Testing [1.3.3] [labor-hour = 250 hr] VMC-SYN Design & Testing [1.3.4] [labor-hour = 300 hr] VMC-TMS Design & Testing [1.3.5] [labor-hour = 200 hr] Software & Hardware Integration Testing [1.4.1] [labor-hour = 100 hr] Purchase Multi-Core Platform [1.5.1] [labor-hour = 20 hr] Configuration Management (CM) [1.6.1] [labor-hour = 30 hr] Technical Specification Writing [1.6.2] [labor-hour = 40 hr]

Project Life Cycle Architecture Design Requirement Development Project Planning System Subsystem System Development System Integration and Testing Design System Implementation

Project Life Cycle Definition According to the technique and specification, this project is developed by Waterfall Model The project could be divided into four phases: P1: Requirement and Specification Development Phase (2008/07/25~2008/10/31) P2: System Development Phase (2008/11/01 ~ 2009/04/30) P3: System Integration Phase (2009/05/01 ~ 2009/05/31) P4: The Phase of Concluding the Project (2009/06/01 ~ 2009/06/30)