JCOMM Observation Programmes Support Centre – Argo Information Centre January 2015 Argo Status Argo TC, M. Belbeoch.

Slides:



Advertisements
Similar presentations
New partnership levels by LUKA VIDMAR Treasurer of BEST BEST PARTNERS ROUND TABLE 26 January 2007 Turin, Italy.
Advertisements

JCOMMOPS SOT IV. SOOPIP Developments Web Site reliability POGO research cruise database to be developed as part of the SeaDataNet project Release.
The Way Forward From JCOMM-IV Some Personal Perspectives D.E.Harrison NOAA/PMEL & Univ. Wa. JCOMM-IV Technical Symposium Yeosu, South Korea May 2012.
AIC Report Argo TC AST #8 Paris, IOC of UNESCO. 2 Argo Status 2804 Active Floats 2643 on GTS 2743 at GDACs 115 (258) on “grey list”
JCOMMOPS JCOMM Observing Program Support Centre M. Belbeoch JCOMM OCG IV/ Hobart, April 2011.
Argo Project Status Report B. Owens, D. Roemmich, S. Riser, G. Johnson, S. Garzol Ocean Climate Observation Annual System Review Silver Spring October.
Kick-Off Seadatanet – Heraklion – 7-11 June Atlantic and global products C. Coatanoan, F. Gaillard, E. Autret, T. Loubrieu.
Argo QC with an emphasis on the North Atlantic Justin Buck British Oceanographic Data Centre Joseph Proudman Building 6 Brownlow Street Liverpool L3 5DA,
Data Buoy Cooperation Panel Hester Viola
JCOMM in situ Observing Platform Support Centre JCOMMOPS
JCOMMOPS Operations & Development Technical Coordinators (H. Viola, M. Belbeoch) JCOMM OCG Geneva/WMO, April 2007.
Argo Information Centre Report M. Belbeoch, Argo TC AST #11, San Diego, USA March 2009
Argo Information Centre Report M. Belbeoch, Argo TC ADMT #10, Toulouse, France September 2009.
Argo September 2004 The status of the Argo project What is Argo trying to do How is it doing it? What have we achieved so far? What has happened since.
Argo Status & issues for ADMT Argo TC ADMT#13 November 2012, Hyderabad.
Argo & AIC Development Argo TC DBCP #22 La Jolla, California.
JCOMM in-situ Observing Platform Support Centre & Argo M. Belbeoch Sept Hangzhou, CHINA.
ARGO, Profiling Floats, and Iridium Stephen C. Riser Dana Swift School of Oceanography, University of Washington [acknowledgements to NOAA, ONR, NSF, NASA]
JCOMM in-situ Observing Programme Support Centre SeaDataNet Technical Meeting II Paphos, Cyprus March 2012 Mathieu Belbeoch & Kelly Stroker.
Argo Status Argo TC AST#13 March 2012, Paris nations maintain the global array and 20 more fill regional gaps 18 countries active in 2011 (16 inactive)
DBCP-21, Buenos Aires,17-21 October 2005, JCOMMOPS (1) JCOMM in situ Observing Platform Support Centre Most developments now achieved –Infrastructure in.
JCOMMOPS & Argo, DBCP, SOT, OceanSITES 2 nd GODAE Observing System Evaluation Workshop Toulouse, June 2009 Mathieu Belbeoch & Hester Viola.
JCOMMOPS JCOMM Observing Program Support Centre Etienne Charpentier, WMO Secretariat M. Belbeoch, JCOMMOPS May 2011, MARCDAT-III.
JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 Argo Status Argo TC, M. Belbeoch.
JCOMM Observing Programme Support Centre International Coordination and Gliders EGO #4, Cyprus Yves Desaubies Mathieu Belbeoch Hester Viola.
JCOMM in situ Observing Platform Support Centre JCOMMOPS
The Data Buoy Cooperation Panel (DBCP) Joint Meeting of the International Program for Antarctic Buoys (IPAB) and the International Arctic Buoy Program.
Joint WMO-IOC Technical Commission for Oceanography and Marine Meteorology Contributions to WIGOS David Meldrum, vice chair, JCOMM OPA.
Data Buoy Cooperation Panel Hester Viola
IV-3.1 JCOMMOPS SOT Technical Coordinator. 2 JCOMMOPS structure Programmes currently supported –Ship Observations Team (30% Mathieu Belbeoch) –Argo Profiling.
JCOMMOPS JCOMM Observing Program Support Centre M. Belbeoch DBCP #27 September 2011 Geneva, Switzerland.
Argo Status 3000 floats in November 2007 ! Commitments for 2008&2009 seem ok Global array issues QC and delayed mode processing Pressure errors New products.
1 Standard Float Cycle  Drifting Depth: 1000 m  Profiling Depth: 2000 m  10 Days Cycles.
Monitoring and management of ship logistics opportunities M. Belbeoch PMO IV December 2010 Orlando, USA.
Topics describe the Data Buoy Cooperation Panel (DBCP) –aims, –achievements and –Challenges network status developments of data buoy technology JCOMM.
International Argo structure Argo TC M. Belbeoch Accra, Ghana.
1 Argo Update Ming Ji, NOAA/NCEP/OPC Steve Piotrowicz, Ocean.US David Behringer NOAA/NCEP/EMC IGST, St John’s, NL Canada August 7, 2007.
I-2.5 Report by the former SOT Technical Coordinator Hester Viola 1 May 2007 – 31 January 2009.
Argo workshop in Ghana, December Argo data status & data access.
ISABP meeting, Rio, August 2004 (1) DBCP DBCP 19 th session –Held in Angra dos Reis, October 2003 –Louis Vermaak presented report on ISABP.
Argo & New Telecom. Systems Technical Workshop Introduction and Summary. ADMT#11 October 2010, Hamburg/Germany.
Data Buoy Cooperation Panel Hester Viola
Silver Spring HRMM Workshop April Global Ocean Surface Underway Data project (GOSUD) Theirry Carval – Coriolis Ifremer Bob Keely – MEDS Thierry.
JCOMM Observations Programme Area Report to the DBCP Angra dos Reis, 20 October 2003 Observations Programme Area Coordination Group (OCG) Mike Johnson,
JCOMM Observation Programmes Support Centre – Argo Information Centre September 2015 Argo Status Argo TC, M. Belbeoch.
JCOMMOPS International Technical Coordination for the implementation of Global Ocean Observing Systems.
Joint WMO-IOC Technical Commission for Oceanography and Marine Meteorology Contributions to WIGOS Johan Stander, co-president, JCOMM David Meldrum, co-chair,
1 Cervical Screening Programme, England, : Graphs.
JCOMM Observation Programmes Support Centre – Argo Information Centre September 2015 Argo Status Argo TC, M. Belbeoch.
XBT FALL RATE EQUATION WORKSHOP National Oceanic and Atmospheric Administration Atlantic Oceanographic and Meteorological Laboratory, Miami, FL March 10-12,
Geneva, April 2007 GTSPP by Bob Keeley (Canada) and Charles Sun (U.S.A)
Ship Observations Team National Reports Germany SOOP Programme Birgit Klein BSH Hamburg, Germany.
1 The Argo project 21st Century in-situ Ocean Observing System M. Belbeoch, Argo Technical Coordinator with inputs from D. Roemmich, Argo Steering Team.
Argo Programme – activities in Japan – Keisuke Mizuno (JAMSTEC) Argo is a global array of 3,000 free-drifting profiling floats that measure temperature.
JCOMM Observation Programmes Support Centre – Argo Information Centre November 2014 Argo Status Argo TC, M. Belbeoch.
DBCP Monthly Report January 2016 Prepared By DBCP Technical Coordinator
Status of the Global Ocean Observing System – April 2015 David Legler, Director Climate Obs Division NOAA Climate Program Office OOPC – April 2015 Sendai,
JCOMM in situ Observations Programme Support Centre 04 March 2016 Argo Status Argo TC, Mathieu Belbéoch.
IBPIO Programme report
Argo & Google Ocean.
M. Belbéoch, 8 June 2018 Global Argo Status M. Belbéoch,
JCOMM in-situ Observations Programme Support Centre www. jcommops
How to handle multiple vertical references
What is JCOMMOPS JCOMMOPS occupies a unique place as the focal point for the practical coordination of the in-situ ocean observing systems defined by JCOMM.
Candyce Clark JCOMM Observations Programme Area Coordinator
Argo Status Argo TC, M. Belbeoch
JCOMM in-situ Observations Programme Support Centre www. jcommops
Argo Status Argo TC, M. Belbeoch
JCOMM in-situ Observations Programme Support Centre www. jcommops
Argo Information Centre & Argo Users
Presentation transcript:

JCOMM Observation Programmes Support Centre – Argo Information Centre January 2015 Argo Status Argo TC, M. Belbeoch

JCOMM Observation Programmes Support Centre – Argo Information Centre January 2015 Indicators IndicatorResultMethodTargetNote STATUS Activity100%Nb Active units vs target 3200 within the initial array (60N/60S, no marginal seas) Initial: 3349 Polar: 244 Marginal: 249 All: 3843 Intensity100%Nb Deployed over 12 months vs target units Density52% of 6x6 well sampled 100 % Initial design ? DATA Delivery94%, 94%Nb of platforms distributing data vs active GTS, GDACs 100%, 100% 3600 / 3843, 3628 / 3843 Quality74%Ratio DM/DM Eligible 100% Timeliness92%, 84%Nb Obs. < 24h vs Total Obs. 100%, 100%GTS, GDACs Previous month

JCOMM Observation Programmes Support Centre – Argo Information Centre January 2015 Status

JCOMM Observation Programmes Support Centre – Argo Information Centre January 2015 Density > 7

JCOMM Observation Programmes Support Centre – Argo Information Centre January 2015 Density

JCOMM Observation Programmes Support Centre – Argo Information Centre January 2015 Density > 4

JCOMM Observation Programmes Support Centre – Argo Information Centre January 2015

JCOMM Observation Programmes Support Centre – Argo Information Centre January 2015 Member States

JCOMM Observation Programmes Support Centre – Argo Information Centre January 2015 Member States

JCOMM Observation Programmes Support Centre – Argo Information Centre January 2015 Networks

JCOMM Observation Programmes Support Centre – Argo Information Centre January 2015 Market

JCOMM Observation Programmes Support Centre – Argo Information Centre January 2015 Market

JCOMM Observation Programmes Support Centre – Argo Information Centre January 2015 New Floats (256)

JCOMM Observation Programmes Support Centre – Argo Information Centre January 2015 All Deployments

JCOMM Observation Programmes Support Centre – Argo Information Centre January 2015 Heat Map

JCOMM Observation Programmes Support Centre – Argo Information Centre January 2015 Density (SIO)

JCOMM Observation Programmes Support Centre – Argo Information Centre January 2015 Age

JCOMM Observation Programmes Support Centre – Argo Information Centre January 2015 Density 6° x 6°

JCOMM Observation Programmes Support Centre – Argo Information Centre January 2015 Density/Age 6°x 6°

JCOMM Observation Programmes Support Centre – Argo Information Centre January 2015 Density/Age vs Plans

JCOMM Observation Programmes Support Centre – Argo Information Centre January 2015 Deployment Plans Score

JCOMM Observation Programmes Support Centre – Argo Information Centre January 2015 Plans

JCOMM Observation Programmes Support Centre – Argo Information Centre January 2015 Profiles

JCOMM Observation Programmes Support Centre – Argo Information Centre January 2015 Delays GTS

JCOMM Observation Programmes Support Centre – Argo Information Centre January 2015 Delays GDACs

JCOMM Observation Programmes Support Centre – Argo Information Centre January 2015 Delays, DACs

JCOMM Observation Programmes Support Centre – Argo Information Centre January 2015 Delays, DACs

JCOMM Observation Programmes Support Centre – Argo Information Centre January 2015 Links Report ftp.jcommops.org/Argo/Doc/ AIC.xlsx ftp.jcommops.org/Argo/Doc/ AIC.pdf Maps ftp.jcommops.org/Argo/maps/LATEST/ News