Presentation is loading. Please wait.

Presentation is loading. Please wait.

Argo Status Argo TC, M. Belbeoch

Similar presentations


Presentation on theme: "Argo Status Argo TC, M. Belbeoch"— Presentation transcript:

1 Argo Status Argo TC, M. Belbeoch

2 Indicators (Core Argo)
Category Indicator Result Method Target Note STATUS Activity 107% Nb Active units vs target 3200 within the initial array (60N/60S, no marginal seas) 446 in the core array All: 3881 Intensity 120% Nb Deployed over 12 months vs target 800 972 units (last 12 months) Density 53% % of 6x6 well sampled Certainly not 100 % Analyze median value over time DATA Delivery 93%, 99% Nb of platforms distributing data vs active GTS , GDACs 100%, 100% 3615/ 3881, 3866 / 3881 DM Processing 72% Ratio DM/DM Eligible 100% Timeliness 91% (GTS) 88% (GDACs) Nb Obs. < 24h vs Total Obs. 100%, 100% June Delays 7h, 18h (GTS) 10h, 22h (GDACs) Median , Average Delay 24h

3 Status

4 Networks

5 Density (core)

6 Density/Age (core)

7 Density/Age (core)

8 Member States

9 Member States Note that last point of the graph is the status of GDACs calculated between 01/06/2015 and 01/07/2015

10 Member States (zoom)

11 Market

12 Market

13 New Floats (2015)

14 All Deployments (<2015)

15 All Deployments (<2016)

16 Density (SIO)

17 Density Map (ESRI tool)

18 Age

19 Density 6° x 6°

20 Density/Age 6°x 6°

21 Density/Age vs Plans

22 Deployment Plans Score

23 Plans

24 Profiles

25 Delays GTS

26 Delays GDACs May: median: 10h, average: 35h
June:median:10h , average: 22

27 GDACs Delays, DACs (May)

28 GDACs Delays, DACs (May)

29 GDACs Delays (June)

30 GDACs Delays (June)

31 GTS Delays (June)

32 GTS Delays (June)

33 Argo Global Design (draft)

34 Links Report Maps News http://argo.jcommops.org/maps
ftp.jcommops.org/Argo/Doc/ AIC.xlsx ftp.jcommops.org/Argo/Doc/ AIC.pdf Maps ftp.jcommops.org/Argo/maps/LATEST/ News


Download ppt "Argo Status Argo TC, M. Belbeoch"

Similar presentations


Ads by Google