MICE Magnetic Field Mitigation Review Potential impact on ISIS of MICE Stray Magnetic Fields 24 th September 2013 Martin Hughes.

Slides:



Advertisements
Similar presentations
1 UK Project Alan Grant, STFC. Finance How savings are made Update on stepIV position Milestones Critical Path - stepIV Concerns 2.
Advertisements

New Radiation Safety Interlock System for the SPring-8 Accelerator Complex C. Saji, M. Toko, T. Matsushita, R. Furuta, H. Hanaki, S. Hashimoto 1), Y. Hashimoto,
K. Long, 18 April, 2015 Beam-line status — red sky at night?
Andrea Paoli AdV 1 st Project Review Cascina, November 3 rd, 2008 IME – infrastructure modifications for environmental noise reduction.
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
1 06/05/2015 CDM Induction for MICE Construction Phase Health & Safety Plan:
K. Potter RADWG & RADMON Workshop 1 Dec WELCOME TO THE 4th RADWG & RADMON WORKSHOP 1 December 2004.
1 Personnel Protection System (PPS) – Definition Interlock system, to protect personnel from Ionising Radiation (and other hazards) –(Note: does not include.
Industrial Radiography
1 BROOKHAVEN SCIENCE ASSOCIATES Presentation to ASAC R. Casey Radiation Shielding: Assumption and Design April 24, 2007.
National Committee for the Certification of Radiation Protection Officer SAFETY AND WORK PROCEDURE IN SALES OF RADIOACTIVE MATERIAL AND IRRADIATING APPARATUS.
Guide to ALICE Lasers Personal Safety System (primarily for key commissioners) Within the PI laser room and diagnostics room there are several lasers which.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 27, 2009.
1 Roger Erickson 1 Coordination with Accelerator Systems NEH Accelerator Readiness Review Coordination with Accelerator Systems.
1 Project Manager Report Andy Nichols, STFC – RAL MICE Collaboration Meeting, Harbin, 13-17th January 2009.
Pierrick Hanlet MICO June 6, 2011 MICE Operations Manager Report.
1 Infrastructure at RAL Iouri Ivaniouchenkov, RAL MICE Collaboration CERN, 29 March 2003.
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
Commissioning needs: K.Long. Routine: LN2 bottle: –Needs to be sited in MICE Hall or outside vault so that routine checks of contents can be made.
Spectrometer Solenoid Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICO.
Interfaces with the SNS Project for the ARCS Instrument Doug Abernathy ARCS Hardware Project Manager ARCS Construction Project Review DOE Germantown Aug.
Chapter 11 – Inductors Introductory Circuit Analysis Robert L. Boylestad.
1 BROOKHAVEN SCIENCE ASSOCIATES Review of May 29 Excursion Bob Casey.
Posting of Accelerator Enclosures Vashek Vylet and Keith Welch DOE Accelerator Workshop SLAC, August 17 – 19,
MUZAIDI BIN MARZUKI Chapter 4: Electromagnetic.
STFC SHE Group Corporate Services This code should be read by: All STFC staff, tenants who are responsible for equipment or facilities generating strong.
ALPHA Project Safety Assessment Document Vladimir Anferov.
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
MICE - UK Project Progress Roy Preece 30 th April 2013.
Iouri Ivaniouchenkov RAL Safety considerations at RAL July 9, RAL MICE Collaboration Meeting 1.
MICE Decay Solenoid Quench Detector Trevor Hartnett Daresbury Laboratory.
MICE CM30 Magnetic Shielding Update Mike Courthold 6 th July
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
Chapter 9 Magnetism.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
MICE Hydrogen Control System MICE Collaboration Meeting CM33 27 th July 2012 PJ Warburton – STFC Daresbury Lab.
Magnetic Shielding Issues Roy Preece STFC - RAL. Overview Issues Items in harms way – Step IV Step IV mitigation plan –Racks –Compressors Current / Future.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
MICE CM32 8 th February 2012 Magnet Group Report Vicky Bayliss Victoria Blackmore John Cobb Mike Courthold Roy Preece Mike Zisman 1.
Magnetic Shielding Roy Preece. Issues Cooling channel initially designed without return yolks. Current North and South shielding walls designed to encapsulate.
Undulator Orientation & Electron Beam Spacing Should the undulator frames be toward the central aisle or the tunnel walls? What is the optimum spacing.
NUMI NuMI Internal Review July 12, 2001 Infrastructure: Radiation Safety Page 1 Technical Components NuMI Beamline Radiation Safety Issues Radiation Safety.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
Andrew Moss ASTeC CM32 9t h February 2012 RAL MICE RF System.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
1 MICE Hall construction status Richard Apsimon MICE VC meeting 29th Nov 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Redundancy Requirements for Critical Devices R. Casey August 8, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
Isolation Lock-Out Room Johns River Quarry Site Contact: Blake Ardrey, Quarry Manager, BCM, Johns River Quarry Phone:
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
Running plan Step I.1 Basic radiation levels. I.1.1 ISIS running with beam elements on, target off, beam stop shut. Establish permanent MICE monitoring.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
Grounding.
1 BROOKHAVEN SCIENCE ASSOCIATES Summary of Shielding Calculations for NSLS2 Accelerators P.K. Job Radiation Physicist Peer Review 2007 March
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
1 UK Project Roy Preece – STFC Alan Grant, STFC. Finance Staffing Update on stepIV position Milestones Critical Path – stepIV Magnetic field mitigation.
Personnel Safety Systems Stuart Birch Senior Engineer, Personnel Safety Systems November 6 th, 2014.
1 Implementation at RAL Iouri Ivaniouchenkov on behalf of Elwyn Baynham, Tom Bradshaw, Tony Jones, Jim Rochford Engineering Department, RAL MICE Collaboration.
MI Shielding Machine Protection Credit D. Capista March 7,2010.
What do we want to achieve in this running period? Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory MICO.
Schedule to completion, Risk and Critical Interfaces Roy Preece STFC RAL RLSR 16 th April 2015.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
S A Griffiths CM42 June 2015 Electrical & Control.
Industrial Radiography
Electrical & Control.
Maintain a single control room for all accelerator programs
This code should be read by:
Presentation transcript:

MICE Magnetic Field Mitigation Review Potential impact on ISIS of MICE Stray Magnetic Fields 24 th September 2013 Martin Hughes

Introduction An ISIS perspective on potential problems arising from stray magnetic fields in and around the MICE hall. Two main areas of concern: Dangers to people Dangers to ISIS equipment

MICE Hall Surroundings Ground floor

MICE Hall Surroundings First floor

Personnel Issues Surrounding the MICE hall are controlled access areas including: The ISIS Linac The ISIS Synchrotron And open access areas, such as: The ISIS foyer The ISIS MCR area and diagnostics room The MICE control room area The area outside the MICE shutter door Many people could potentially be exposed to MICE stray fields in these areas. These include: ISIS staff Non-ISIS STFC staff Contractors Facility users Visitors

Personnel Issues STFC health and safety code 39 “working with static magnetic fields” specifies two levels of flux density for which action must be taken if the field extends into a working area: 5 Gauss – warning signs must be displayed at all entrances to the area warning of the potential danger to people having implanted medical devices such as pacemakers Gauss – Access control must be put in place and documented work procedures must be prepared in order to work in the area. Due to the potential for large numbers of people to pass through the open access areas, the 5 Gauss level can not be exceeded in these areas.

Equipment Issues ISIS usually runs for between 120 and 160 days per year. It is of great importance to ISIS to always maximise the available beamtime during these user runs. The ISIS target for beam availability is 90%. The financial cost of beam downtime during a user run can be estimated in the region of £10k/hour. ISIS equipment in the vicinity of the MICE hall is located in the ISIS MCR, Diagnostics room, Linac, old EHT area, MICE Hall roof, and inside the MICE hall itself.

Equipment Issues HEDS Beam Chopper The HEDS (High Energy Drift Space) beam chopper power supply is currently located in the North-East corner of the MICE Hall. The HEDS chopper is most often used during the beam physics period before a user run to help with beam setup, however access could be required during user runs on short notice and operation at the same time as the MICE solenoids is possible. The power supply is based on thyratron technology – thyratron manufacturers give a maximum operating environmental field level of 500 Gauss. Also PSU control electronics to consider.

Equipment Issues DSA Interlocks The Decay Solenoid Area PPS system is tied into the Synchrotron PPS system, and as such any trip on the DSA interlocks will take off the ISIS beam. The control racks for the DSA interlocks are located in the MICE control room/rack room and contain several PPS crates, each of which contains several 24VDC relays and several hundred PCB relays. A fault on any of these relays could cause ISIS problems. There are also several ISIS control boxes related to the DSA located inside the MICE Hall, all of which contain relays which could be affected.

Equipment Issues Linac Initial concerns were over interference with the H- beam being accelerated in the Linac, however these fears have been eased after the ISIS/MICE meeting held in March, where likely field levels were discussed. Other equipment of potential concern in the Linac hall is the vacuum pumps which are on the MICE hall side of the Linac, power supplies and amplifiers which are on the far side of the Linac, and interlock racks similar to those controlling the DSA which are at the low energy end of the Linac (West end).

Equipment Issues Old EHT Area Located to the North West of the MICE hall (before the start of the Linac). Currently being set up as a Linac test area. Same types of equipment as in the Linac. Radiation shielding has been installed in order to separate the EHT area from the Linac. This will make the area accessible during ISIS user runs, so personnel issues will be of concern.

Equipment Issues MICE Hall Roof The Linac air conditioning plant is currently located on the MICE hall roof. The equipment is made up of standard air conditioning pumps and related equipment, some of which may be sensitive to strong magnetic fields. Personnel access will be required to the roof for servicing of the equipment, so field levels must be known to ensure safe access.

Equipment Issues ISIS Main Control Room The ISIS MCR is manned 24 hours a day, and is open access to all staff so will be covered by the 5 Gauss limit. At the 5 Gauss level interference with equipment should not be an issue, however were the field higher than this there are still CRT monitors in use in the MCR as well as multiple hard disks, which may be sensitive to strong magnetic fields.

Equipment Issues Diagnostics Room Located behind the MCR, directly on the south wall of the MICE Hall. As with the MCR, open access to anybody on site so fields must be below 5 Gauss. Equipment consists largely of racks of digital electronics used for pulse generation and timing signal generation. FPGA circuits are present, as are several PXI racks which may be sensitive to magnetic fields, however none of this equipment should not be in danger at the 5 Gauss level.

Closing Summary Given the projected field levels, the main concern from an ISIS perspective is that field levels in open access areas outside of the MICE Hall do not reach the 5 Gauss level which could present a potential danger to staff and visitors. It appears that the danger to ISIS equipment in the vicinity is fairly small, with the most high risk items probably being those in the MICE hall itself such as the HEDS beam chopper, and DSA interlock related items. Upon commissioning of the solenoid coils, ISIS would require that all of the surrounding area field levels are surveyed and recorded, which would have to be carried out in ISIS downtime to allow access to the Linac and other controlled access areas.