Mechanical Integrity Quality Assurance. Lesson Objectives  Describe How to Ensure Controls in Place for QA  Describe Standard Record for Inspection.

Slides:



Advertisements
Similar presentations
Basic Principles of GMP
Advertisements

Course Material Overview of Process Safety Compliance with Standards
Course Material Overview of Process Safety Compliance with Standards
Objective of equipment maintenance Objective of equipment maintenance Maintenance frequency Maintenance frequency Inspection and Testing Inspection.
ISO 9000 Quality Standards ISO 9000 describes quality assurance elements in generic terms that can be applied to any business. It treats an enterprise.
Managing a Successful Mechanical System project Following design – what next?
Ensure Vendor/Engineer of Choice Product Quality
1 Continuing Evolution of U.S. Nuclear Quality Assurance Principles, Practices and Requirements PART II - A Tutorial August 2005 This document.
Mechanical Integrity Controlling Equipment, Materials & Supplies.
Responsible CarE® Process Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
World Health Organization
ACADs (08-006) Covered Keywords Byproduct material, source material, controller, custodian, ORM, sealed source, exempt source, special nuclear material.
Quality Management System
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
FAA Regulatory Policy for Composite Material Control Presented at 8/8/02 FAA/NASA Workshop (Chicago, IL) Introduction – Importance of stabilizing composite.
World Health Organization
ISO 9000 Certification ISO 9001 and ISO
CD NS Chief, Defense Nuclear Safety FIRE PROTECTON FUNCTIONAL AREA CDNS BIENNIAL REVIEWS May 15, 2012 Carl Sykes.
Chapter 10 Verification Procedures. Objective In this module, you will learn: u How to define verification u What functions are part of HACCP plan verification.
4. Quality Management System (QMS)
Huzairy Hassan School of Bioprocess Engineering UniMAP.
Seafood HACCP Alliance for Training and Education Chapter 10 Principle 6: Establish Verification Procedures.
BRC Food Safety Quality Management System Training Guide
1 Procurement Quality Assurance Use quality as the framework for process/continual improvement Use quality as the framework for process/continual improvement.
Objectives 4 Understand the ISO standards. Why are standards required? 4 Need standards to ensure that a term means the same for all 4 Need company standards.
Incident Reporting Procedure
1.0 INTRODUCTION Seán Moran. SIMPLE? Commissioning is a complex issue requiring: Planning Leadership Teamwork Training Communications.
Elements of Process Safety Management
Process Safety Management
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Level 2 Unit 4 Producing Engineering Solutions Engineering Diploma Level 2 Unit 4 Producing Engineering Solutions This unit will give you the opportunity.
From Research Prototype to Production
ISO OPERATIONAL CONTROL
Module 8 | Slide 1 0f Personnel Basic Principles of GMP 9.
A Level ICT Unit Implementing CBIS’s. Support Installing a new system is disruptive and the support program will need to be planned well in advance.
Mechanical Integrity Written Procedures. Lesson Objectives  Describe Required Written Procedures for Establishing an MI Program  List Acceptable Sources.
Important informations
Aloe Vera of America: A Quality IASC-Certified Producer of Aloe Vera Presented by Walt Jones.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Edward T. Lessard ESHQ.
Aviation Maintenance Management
Continuing Analysis and Surveillance System (CASS) 03/06/59 1 AIRCRAFT MAINTENANCE Section 10.
Mechanical Integrity Training. Lesson Objectives  Describe MI Training Required  Describe How to Conduct Training  Describe Requirements for Maintaining.
The MIT/QA Plan Issue W. Reiersen. Terminology 1 Product specification: A document generated by the customer identifying requirements and the inspections.
Application – Identifying, Listing Equipment, and Documentation
MNM Fatal Machinery Accident Machinery Accident August 5, 2013 (New York) August 5, 2013 (New York) Crushed Stone Mine Crushed Stone Mine Plant.
CBER Common Problems on Source Plasma Inspections Judy Ellen Ciaraldi BS, MT(ASCP)SBB, CQA(ASQ) CBER, OBRR, DBA September 16, 2009.
Module 2Slide 1 of 26 WHO - EDM Quality Management Basic Principles of GMP Part One.
2011 PLANT OPERATIONS MODULE 8 Maintain Bulk Plant Systems and Equipment.
HPT Rev. 0 Page 1 of 28 TP-1 TVAN Technical Training Health Physics (RADCON) Initial Training Program Radioactive Materials Handling and Accountability.
Review of the processes released in the framework of the MMP Goran Perinić.
Project Management Quality Management. Introduction Project planning Gantt chart and WBS Project planning Network analysis I Project planning Network.
Quality Assurance for LHC Gas Systems Stefan Haider / EP-TA1.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
INGAA Quality Management Systems White Paper Supporting Pipeline Construction.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Safety Management Systems Session Four Safety Promotion APTA Webinar June 9, 2016.
Accelerator Readiness Review October 31, 2006
GOOD MANUFACTURING PRACTICE FOR BIOPROCESS ENGINEERING (ERT 425)
Behavioural Safety Use Of Work Equipment.
BUSINESS PROCESSES MAP
LCLS-II Cryoplant Controls Readiness to Procure
Projects Integrating Planning for Successful Occupancy, Operation, and Maintenance into your Capital Project.
4.5 Checking and Corrective Action Monitoring and Measurement
Management of Change Report Errors to Management.
Prerequisite Programs
Quality Systems ISO 9000 Series QS-9000 TE-9000 AS9000
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Fiber Reinforced Polymer Systems
Presentation transcript:

Mechanical Integrity Quality Assurance

Lesson Objectives  Describe How to Ensure Controls in Place for QA  Describe Standard Record for Inspection and Testing for QA  Describe How to Implement Inspection and Testing for QA  Describe Adequate Records Management for QA

Discussion  The Plant Owner is Responsible for ensuring a System is in Place for QA of New or Modified Equipment.  Vendors and Manufacturers Should be Contractually Bound to Provide for QA  Design – Must be Checked, Certified, and Documented; Controls Must be in Place to Assure Contractor is Qualified and will Follow Good Engineering Practice  Procurement and Fabrication – Manufacturers Must be Qualified to Do the Work by e.g.:  Check of Their Engineering Standards  Check of Prior Experience with Similar Designs  Recommendations from Process Technology Suppliers  Observation of Production Techniques and Results

Discussion (cont’d)  Installation  Receipt Inspection to Include Check Against Procurement Documents  Secured Warehousing and Controlled Release for Installation or Maintenance  QA Punchlists Should be Used e.g. Foundation Installation and Anchor Bolt Pattern Meet Specs., Piping Properly Fabricated, Machinery Properly Installed, etc.  Correction of Deficiencies – Controls to Ensure Documentation and Correction Using RAGAGEP. MOC Process May be Needed if Correction to Original Design Specifications Cannot be Assured  Transfer of Custody – Procedures Need to be in Place to assure Mechanical Integrity During Commissioning and Startup, Concerns Might Include:  Training in Operations Procedures  Curing Refractory in Fired Heaters  Controlling Stress on Startup  Conditioning Catalysts

I&T Records for QA - Must Ensure Equipment Installed Properly and Consistent with Design Specifications and Manufacturer’s Recommendations  Standard I&T Report Information from Previous Module  Inspection of Fabricated Equipment and Package Units for Handling Damage and Missing Parts  Properly oriented bolted and torqued grouted equipment  Machinery, as installed, is properly fabricated assembled, tested, and run-in  Deficiencies Identified and Corrective Action Taken