1 Guy Duchossois, Work Plan Manager Report on 2006 Work Plan.

Slides:



Advertisements
Similar presentations
1 Information and Publicity in programming period.
Advertisements

1 Patricio A. Bernal, Executive Secretary IOC The Indian Ocean Tsunami Warning System : A Progress Report. Intergovernmental Oceanographic Commission.
DISASTER REDUCTION AND SUSTAINABLE DEVELOPMENT Preparatory process World Summit on Sustainable Development, WSSD IATF 5, April 2002.
Natural Disaster Management Project Pakorn Apaphant/Hiromichi Fukui Project and Application Subgroup Proposed to WGISS 23 Hanoi, Vietnam May 21-25, 2007.
© GEO Secretariat Agenda Item 3. GEO UPDATE. © GEO Secretariat Membership 67 members and 43 Participating Organisations – New Members:Latvia, Moldova,
Energy Task Ellsworth LeDrew, Point of Contact, GEOSS Energy, Thierry Ranchin, Co-chair, Renewable Energy Community of Practice, Marion Schroedter-Homscheidt,
© GEO Secretariat Disasters SBA Status of Tasks DI-06-05, DI-06-06, DI New tasks proposed for the WorkPlan G. Rum - 05 September 2006.
Overview of Capacity Building Committee Activities GEO Capacity Building Committee Meeting Brussels – 14 September 2006 Errol Levy DG Research – European.
GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
The GEO Secretariat Progress Report to GEO-2 November 2003 Helen M. Wood Secretariat Director.
Work Plan Development Guidelines and Schedule.
Work Plan Development Guidelines and Schedule.
DS-01 Disaster Risk Reduction and Early Warning Definition
1 Patricio A. Bernal, Executive Secretary IOC The Indian Ocean Tsunami Warning System: A Progress Report.
22-23 April 2004, the Fourth GEO Plenary Meeting at Tokyo, Japan Overview of Draft Outline, Process, and Schedule of the Implementation Plan Ivan B. DeLoatch,
GEO-5 in Ottawa 1 29 November 2004 Draft GEOSS 10-Year Implementation Plan and Status Report on Reference Document Ivan B. DeLoatch, Toshio Koike, Robert.
GEO Work Plan Symposium 2011 Days 2 & 3 Presentation of ID-02 Catalyzing Resources for GEOSS Implementation for Plenary Session.
1 GEOSS Monitoring & Evaluation. 2 1st GEOSS M&E WG meeting outcomes Agreed on 1.the final draft of Terms of Reference for the M&E WG 2.The plan for delivery.
Report of the Architecture and Data Committee (ADC) R.Shibasaki (ADC, Japan)
Udo Gärtner, Co chair S&TCom 28.Feb/1.Mar 2007 Report on the Sience &Technology Committee.
GEONETCast Initiative of GEO presented at the EC GEONETCast workshop 5 March 2006 GEO Secretariat.
GEO South – Eastern Europe and Eastern Mediterranean Symposium on Earth Observation Services for Monitoring the Environment and Protecting the General.
EN Regional Policy EUROPEAN COMMISSION Information and Publicity SFIT, 15 June 2006 Barbara Piotrowska, DG REGIO
1 American Community Survey: Update New Jersey State Data Center Meeting June 11, 2008 Nancy Torrieri American Community Survey Office.
FCMAT Response & Preparation: Process Outline October 25, 2006.
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO GFCS Governance proposal Process of development.
EGIDA Stakeholder Network and Advisory Board and Their Relevance for EGIDA and GEO Stefano Nativi 1 st Joint Workshop of the EGIDA Stakeholder Network.
Integrated Ocean Observing System (IOOS) Data Management and Communication (DMAC) Standards Process Julie Bosch NOAA National Coastal Data Development.
United Nations Environment Programme. UNEP’s Work to Advance the Preparation and Implementation of National Adaptation Programmes of Action 3 September.
Integrated Earth Observations - Building the Bridges - IGOL Theme Team Meeting Sept 2004 Jeff Tschirley Chief, SDRN.
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda Item: 15 Chu ISHIDA(JAXA) on behalf of Rick Lawford, GEO Water CoP leader GEO Water.
CEOS-CGMS Working Group on Climate John Bates, NOAA SIT-30 Agenda Item #11 Climate Monitoring, Research, and Services 30 th CEOS SIT Meeting CNES Headquarters,
Task AR-07-03: Global Geodetic Reference Frames Report to ADC-5 prepared by Hans-Peter Plag (IAG/GGOS) Nevada Bureau of Mines and Geology and Seismological.
© GEO Secretariat GEO WP & 2013 GEO priorities for CEOS Support GEO Secretariat CEOS SIT-28 NASA - Langley March 2013.
|1|1 GEOSS Update & Work Plan Development for Disasters An International Workshop on the Utilization of Seismographic Networks within the GEOSS August.
CEOS WGISS Preliminary Workshop on Data Access and Integration: Global and Regional SDI and Client Perspectives 8-9 May 2000, Canberra ESCAP Regional Space.
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda item: 29 Adrian Simmons, Chair of the GCOS Steering Committee Update from the Global.
UN Sustainable Development Goals Process
1 Group on Earth Observations WORLD METEOROLOGICAL ORGANIZATION Weather – Climate - Water Dr Donald Hinsman, WMO Secretariat Focal Point for GEO.
GEO Tsunami Working Group meeting 22 June 2006, Paris 1 Tsunami WG meeting 22June 2007 G. Rum GEO Secretariat.
The Global Fund - Proposal Process & Round 8 February 19, 2008.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
© GEO Secretariat Global Datasets (GEOSS task DA-09-03) 3rd GEO European Project Workshop 8-9 October 2009 Istanbul Douglas Cripe, GEO Secretariat.
Slide 1 WGISS CEOS WGISS 21, Budapest 8-12 May 2006 WGISS Contribution to GEO WGISS Contribution to GEO Ivan Petiteville.
Progress update on developing Health Sector Strategic Plan (HSSP IV) Joint Annual Health Sector Review Technical Review Meeting Wednesday 5 th.
The Use of the Targets by the Institutions & Development Implementation Board in Monitoring the Work Plan Implementation 2nd GEOSS Science and Technology.
Capacity Building Committee Architecture and Data Committee Meeting Seattle – July 2006.
WGISS Technology Subgroup Report WGISS-29 Bonn, 2010 Nataliia Kussul WGISS.
Overview of CEOS Actions in Support of GEO Work Plan Ivan Petiteville CEO ESA 1 23 rd CEOS Plenary I Phuket, Thailand I 3-5 November2009.
ADC Meeting # 2, Seattle, July 2006 Slide # 1 Overview of ADC activities (Committee) Ivan Petiteville, CEOS Meeting # 2, Seattle, July 20-21, 2006.
GEO and GEOSS… GEO is an Intergovernmental Group –60 Nations –European Commission –43 Participating Organizations With a Single Objective: GEOSS –To establish.
Economic and Social Commission for Asia and the Pacific ESCAP-ISDR Consultation Meeting on Coastal and Climate Hazards 17–18 September 2009 ESCAP Trust.
CEOS Priorities for 2013 Agenda 3 Kerry Ann Sawyer CEOS Executive Officer CEOS SIT-28 Meeting Hampton, Virginia, USA 12 March 2013.
GEO ADC meeting, Washington DC, USA, Sep Slide # 1 DA DA Virtual Constellations Ivan Petiteville, CEOS GEO ADC Meeting, Washington DC,
Task NumberHarmonise, develop & implement capacity building Performance Indicators CB-07-01c Harmonise efforts by Tasks, in particular those related with.
Task AR-07-03: Global Geodetic Reference Frames Report to ADC-4 prepared by Hans-Peter Plag (IAG/GGOS) Nevada Bureau of Mines and Geology and Seismological.
Introducing the Science and Technology Roadmap 1 st GEO/EGIDA Workshop Bonn, Germany, May 09 th - 11 th, 2011.
Moving Towards GEOSS Vice Admiral Conrad C. Lautenbacher, Jr., U.S. Navy (Ret.) Under Secretary of Commerce for Oceans & Atmosphere Future National Operational.
Report of the Architecture and Data Committee (ADC) R.Shibasaki (ADC, Japan)
World Meteorological Organization Working together in weather, climate and water THE GLOBAL FRAMEWORK FOR CLIMATE SERVICES (GFCS)
NSDI Strategic Plan Update National Geospatial Advisory Committee Meeting December 11, 2013.
NSDI Strategic Plan Update FGDC Coordination Group Meeting November 19, 2013.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
WP6 – Monitoring and Evaluation 17th November 2014 Rome.
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
Giovanni Rum, GEO Secretariat GEO Work Programme Symposium
Overview of Documents for Third Earth Observation Summit
CEOS Missions, Instruments and Measurements Database
Strengthening Early Warning Systems in Europe
Engagement with GEO Kerry Ann Sawyer, NOAA, CEOS SIT Chair Team
Presentation transcript:

1 Guy Duchossois, Work Plan Manager Report on 2006 Work Plan

|2|2 Contents Status of Work Plan Team Methodology for Work Plan Development 2005 Activities 2006 Work Plan Examples

|3|3 1. Status of Work Plan Team Appointment by Co-Chairs in March of 4 persons (including Leader) 2 in post at WMO since mid April 2 will join during first half of May Administrative support provided by GEO Secretariat and WMO The 4 Team members are seconded by GEO Members and Participating Organizations till end Dec Additional part-time support from external experts offered by EUMETSAT and NASA

|4|4 2. Methodology for Work Plan Development (1/2) Mid-March, a working session at WMO Starting point: 2-, 6-, and 10-Year Targets (as of 10Y IP Reference Document) Initial focus on Year Targets (completion of tasks expected by end 2007)

|5|5 2. Methodology for Work Plan Development (2/2) Translation of each 2-Year Target into concrete tasks/activities (Work Packet) Identification of responsible organizations and persons to execute the tasks Involvement of external organizations/experts

|6| Activities GEO-6 decision to start activities already in 2005 Thorough screening/ranking of proposed activities/tasks (213 received on 30 Apr.) to identify those achievable or to be initiated in 2005 Iteration with originators (clarification …) Finalization of definition of 2005 activities by end of June Written report circulated to GEO community by 1 July

|7| Work Plan (1/2) Elaboration of Work Plan Version 0 during Jul./Aug. from inputs provided (on 30 June) by external experts further analyzed in detail and ranked Release of Work Plan Version 0 on 30 Aug. to target specialists for comments by 25 Sep. Elaboration of Work Plan Version 1 for submission to GEO/Executive Committee by 7 Oct. Comments from GEO/Executive Committee due by 28 Oct.

|8| Work Plan (2/2) Work Plan Version 2 released on 14 Nov. for GEO-II 2006 Work Plan and associated budget submitted to GEO-II for approval in Dec together with report on 2005 achievements

|9|9 5. Example 1: DISASTER (1/2) Advocate expansion of seismic monitoring networks, plus expansion of the present network of ocean-bottom pressure sensors, and upgrade existing global networks (e.g. the GSN) so that all critical instruments relay data in real time, in support of better tsunami warning worldwide. 2-Year Target Task 1 Facilitate immediately (6 months) upgrading of the existing Tsunami detection networks in Indian Ocean. Task 2 Contribute to the design of the Tsunami early warning systems in Indian Ocean and expand to global coverage. Task 3 Contribute to the elaboration of preparedness plan/vulnerability maps using EO and GIS techniques. Set of provided Tasks by IOC

|10 5. Example 1: DISASTER (2/2) Task Title Contribute to the elaboration of preparedness plan/vulnerability maps using EO and GIS techniques. Rank 1 (Initiated in 2005) Priority A (High) GEOSS Role Joint / shared Category Data provision/processing Description Space observation will be used to generate digital elevation models. Land use and Land cover information in particular in coastal zones and vulnerability maps (flooding area, bathymetry in shallow water, etc.). Responsible IOC, CEOS space agencies Start Time July 2005 End Time Output / Deliverables DTM, land products, bathymetric maps, etc. Funding Req. No funding from GEOSEC (Funding from international and national development Aid) Relation Task 1 & 2

|11 5. Example 2: HEALTH (1/2) Facilitate the development of data products and systems that integrate earth observation databases with health and epidemiological information, including social and infrastructure data needed in decision support systems for health care planning and delivery. 2-Year Target Task 1 Identify the immediate operational requirements of WHO priority programs ( SAM, outbreak, communicable diseases, non communicable diseases) and national ministries responsible for health in terms of EO data. Task 2 Identify data and provide sample products which integrates EO and health information. Task 3 Organize a workshop in the last quarter of 2005 to evaluate the data products that integrate earth observation and health data and plan the delivery of selected products for following years. Set of provided Tasks by WHO

|12 5. Example 2: HEALTH (2/2) Task Title Identification of operational requirements for WHO & national priority health programs in terms of EO data. Rank 1 ( achievable in 2005) Priority A (High) GEOSS Role Joint / shared Category Users requirements Description Detailed analysis of on-going operational health programs. Identification of existing and/ or potential programs which could benefit of EO environmental information data and if so which one(s). Responsible WHO in consultation with national health organizations (and support of EO specialists as necessary) Start Time July 2005 End Time October 2005 Output / Deliverables Report providing detailed list and characteristics of EO data requirements (e.g. urban maps, deforestation maps, rainfall statistics) Funding Req. None from GEOSEC Relation Inputs to Tasks 2 & 3