Pend Oreille Wetland Mitigation Project #199106000 Albeni Falls Dam Mitigation Project #199206100.

Slides:



Advertisements
Similar presentations
Acton Quarry – Proposed Extension Natural Environment Pre-Submission Liaison Committee Information Session January 22, 2009.
Advertisements

The Upper Columbia United Tribes (UCUT) Formed in 1983 to provide a common voice for our region through the collaborative efforts of the Upper Columbia.
Action Effectiveness Monitoring in the Upper Columbia (Chapter 4) Karl M. Polivka, Pacific Northwest Research Station, USDA Forest Service.
Walla Walla Basin Fish Habitat Enhancement Project CONFEDERATED TRIBES OF THE UMATILLA INDIAN RESERVATION.
Implement the Grande Ronde Model Watershed Program Administration and Habitat Restoration Projects Project Lyle Kuchenbecker, Project Planner.
UCUT Wildlife Monitoring and Evaluation Project: a Regional Approach for Assessing Ecological Restoration James G. Hallett Margaret A. OConnell.
Lolo Creek Watershed Project #
SOUTHERN IDAHO WILDLIFE MITIGATION
DRAFT Wildlife Program Amendments Joint Technical Committees and Members Advisory Group Amendment Strategy Workshop July 23, 2007.
Project Introduction Consists of 9,040 acres of deeded land and 52,000+ acres of state and federal lands. Encompasses 16.6 miles of the South Fork and.
Lower Columbia River and Columbia River Estuary Habitat Restoration Program Mission of the Estuary Partnership is to protect and enhance the lower Columbia.
LOWER SALMON RIVER Tributary Protection and Enhancement.
Lawyer Creek Steelhead Trout Habitat Improvement Project presented by: Lewis Soil Conservation District.
Upper Toppenish Watershed Restoration Project ( ) Yakama Nation Division of Natural Resources.
Little Canyon Creek Subwatershed Steelhead Trout Habitat Improvement Project Sponsored by: Lewis Soil Conservation District.
Acquire South Fork Asotin Creek Property A proposal from the Rocky Mountain Elk Foundation.
A ccomplishments for W ildlife Project IDProject Title Lake Creek Land Acquisition and Enhancement Protect and Enhance the Wanaket Wildlife.
Restore McComas Meadows /Meadow Creek Watershed Project # Restore McComas Meadows/ Meadow Creek Watershed Project # Nez Perce Tribe Fisheries.
Washington Department of Fish and Wildlife. Project SWANSON LAKES WILDLIFE AREA (SLWA)
Restoration of Columbia River Floodplain Functions to Steigerwald Lake
1 Mitigation Program Summary Insures compliance with MPWMD Water Allocation Program EIR measures to mitigate for impacts from the extraction of water to.
Current Tukwila Tree Policies & Regulations. Comprehensive Plan Goals and Policies Related to Trees/Landscape (1) Vegetated hillsides and freeway corridors.
Joint Work Session Skagit County Planning Commission and Shoreline Advisory Committee May 22, 2012.
Wetland Habitats: EMWMF Haul Road Remediation In 2005 a large haul road was constructed that resulted in loss of wetlands. To compensate for those losses,
BPA’s Pisces Wildlife Crediting Ledger Bonneville Power Administration February 17, 2010.
Beneficial Management Practices for Saskatchewan Species at Risk: Piping Plover Endangered.
NYS Department of Environmental Conservation Jamaica Bay Marshlands & Spring Creek Stephen Zahn Deputy Regional Director NYSDEC Region 2 Public Meeting.
Ecological Consulting Native Plant Nursery Restoration Services Cultural Resource Management Wolf Lake Aquatic Restoration Project.
Clean Water Act Section 404: An O&G Perspective Andrew D. Smith SWCA Environmental Consultants.
Spokane River Project License Implementation Spokane River Forum Speed Fitzhugh FERC Project No March 26, 2013.
Regional mitigation sites for three Arizona solar energy zones: The Nature Conservancy nominations Dale Turner Marcos Robles The Nature Conservancy in.
Kalispel Tribe Resident Fish Program Hatchery - Wayne Gould Habitat- Michele Andersen.
Bureau of Land Management NAIP Information Meeting July 19 th, 2006.
Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research Program Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research.
EEP Watershed Planning Overview August 12, Ecosystem Enhancement Program Nationally recognized, innovative, non-regulatory program formed in July.
Birds of the San Pedro. Introduction San Pedro River Drainage North running river Located mostly in SE Arizona Only river that has not been dammed in.
Climate Change Adaptation : Case Studies U.S. Fish and Wildlife Service May 14, 2008.
Low Flow Analysis & Water Use Plan Science & Community Environmental Knowledge Fund Forum June 10, 2004 Barry Ortman Diversified Technical Services Dawson.
Lewis River Wildlife Habitat Management Program February 20, 2008.
2013 Spokane River Conference March 26, Shelley Lake Gravel Pit Spokane River.
United for the benefit of all Regional Coordination.
MICHIGAN’S COASTAL AND ESTUARINE LAND CONSERVATION PROGRAM (CELCP) Alisa Gonzales-Pennington Matt Warner Michigan Coastal Management Program Environmental.
Ecological Characteristics Region H of Texas Water Planning.
Watercourse DPA District of North Vancouver Streamside DPA Development Permit Area for the Protection of the Natural Environment: Streamside Areas Public.
Spokane River Riparian Enhancement Project at State Line.
Case Study – Preparation of an EMP Integrated Ecosystem Management of Sunshine-Moon River Basin (SMRB) Project.
Indiana’s Coastal Nonpoint Pollution Control Program Coastal Advisory Board Meeting April 18, 2007.
Wildlife Program Amendments CBFWA Members Meeting – Sept
Coos Watershed Association Watershed Restoration Projects.
September 13, 2007 Debrah Marriott, Executive Director Evan Haas, Habitat Restoration Coordinator Restoration in the Lower Columbia River and Estuary.
South Meadows Open space # 16 Upgrades Open space # 16 Upgrades.
Nason Creek Salmon Habitat Conditions* Development, and road building have affected riparian (streamside) habitat, large woody debris and gravel recruitment.
Planning Habitat Restoration for Dredging Projects WEDA Midwest Chapter Conference Green Bay, Wisconsin April 27, 2012 Jack Brunner.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Clearing and Site Preparation and Site.
Session Chair:David Ward, Loudoun Watershed Watch Panelists:Gem Bingol, Piedmont Environmental Council Joe Ivers, PhD, Virginia Waters and Wetlands, Inc.
Land Stewardship Program 10 Year Strategic Plan. Manages District natural areas, protect lands and mitigation banks through: Enhancement Enhancement Restoration.
Lake and Wetland Management has been providing professional environmental services since Our company is a premier contractor for Golf Courses, Residential.
Middle Fork American River Project Vegetation & Integrated Pest Management Plan (VIPMP) Meeting March 28, 2011 Handout No. 1.
Wildlife Program Amendments Joint Technical Committees and Members Advisory Group Amendment Strategy Workshop.
Options for Forest Bird Management Coastal Operational Issues Forum March 31, 2016.
PNAMP Monitoring Terminology Data Dictionary The meta data file provides a better explanation of the project’s intent. The estuary work group is still.
Source: Stream Corridor Restoration Manual WATERSHED MANAGEMENT.
TMDL Implementation: Now What?
Where critical areas & agriculture meet
The Gila River Restoration at Apache Grove
Kevin “Doc” Hoover Water’s Edge Hydrology, Inc.
Washington County Parks and Open Spaces
Wildlife Program Amendments CBFWA Members Meeting – Sept
Jason Throneberry Aquatic Ecologist.
What is a Shoreline Master Plan?
Presentation transcript:

Pend Oreille Wetland Mitigation Project # Albeni Falls Dam Mitigation Project #

Background Albeni Falls Dam Habitat Losses Mallard5,985 HU Redhead duck3,379 HU Canada goose4,699 HU Bald eagle-breeding4,508 HU Bald eagle-wintering4,365 HU Black-capped chickadee2,286 HU Yellow warbler 171 HU White-tailed deer1,680 HU Muskrat1,756 HU

Albeni Falls Mitigation Acquisitions Flying Goose IPurchased Acres Flying Goose IIPurchased Acres Priest RiverPurchased Acres TacomaPurchased Acres Upper TrimblePurchased Acres Lower TrimblePurchased Acres Carey CreekPurchased Acres Beaver LakePurchased Acres Gamlin LakePurchased Acres

Pend Oreille Wetland Mitigation Project

Management Strategies Restore Hydrology Restore/Enhance Vegetative Components Control Shoreline Erosion Control Noxious Weeds Control Vehicular Access

Implementation

Wetland Restoration

Nesting Island

Wheel Valves

Shoreline Stabilization

Protecting Cultural Resources

HEP Results PROPERTY NAME BASELINE HUs 5 YEAR HUs 10 YEAR HUs Flying Goose I Flying Goose II N/A Priest River94.5N/A Tacoma411.9N/A Upper Trimble96.7N/A Lower Trimble 237.4N/A Carey Creek65.04N/A Beaver Lake155.55N/A Gamlin Lake95.16N/A

Albeni Falls Dam Mitigation Project

Management Strategies Complete Baseline HEP Complete site-specific management plans Implement recommended management actions Monitor and evaluate the effects of management actions Long-term operation and Maintenance

Active Management

Management Plans

Techniques Removal of grazing Restore wetland hydrology and vegetation Stabilize shorelines Restore shrub and deciduous riparian components Noxious weed control Vehicular access control

Shoreline Enhancement

Conservation

Gamlin Lake

Beaver Lake

Carey Creek

Monitoring and Evaluation

M & E Vegetation Plots Amphibian Surveys Small mammal Surveys Waterfowl Surveys Neo-tropical Surveys