Solar Rooftop. The HERO GROUP - OVERVIEW The HERO GROUP - OVERVIEW  Top 10 widely recognized brand in India  Members among the leaders in business:

Slides:



Advertisements
Similar presentations
Solar Energy Overview Overview of the technology, benefits, as well as technical and financial project considerations for photovoltaic systems. Prepared.
Advertisements

TITAN Group …….Managing Site Build up for the telecom sector TICS Telecom Projects Consultancy Pvt. Ltd.
Nexus Energytech Pvt. Ltd. Arvind Karandikar
KEY CHALLENGES IN INDIA FOR ROOFTOP PV PROJECTS Nexus Energytech Pvt. Ltd. Arvind Karandikar
EVOLVE INDIA SOLAR SOLAR FINANCE SOLAR B. O. O
GRID PARALLELED kWp ROOF TOP SOLAR PV SYSTEM AT AVANT-GARDE AVANT-GARDE.
OPPORTUNITIES FOR BUSINESSES TO DIRECTLY IMPROVE THE BOTTOM LINE THROUGH ENERGY EFFICIENCY 3 rd May 2010 Kees Brinkman Managing Director.
Madhav Solar (Vadodara Rooftop) Private Limited Be a partner of Madhav Group to develop Vadodara into Solar city.
Current Trends in Mining Finance: Strategic and Financial Challenges Roy Hinkamper, KPMG LLP April 2013.
Boxborough and Littleton Solar Program Training 5/15/15 Arnie Epstein – “Solar Coach” Stow Solar Challenge
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 14 Energy Efficiency Module 14: DEMAND-SIDE MANAGEMENT.
Wind energy in NZ 20% wind by 2030 Eric Pyle, Chief Executive, NZ Wind Energy Association.
China’s Sustainable Energy Policy
Beck Energy Group P o w e r i n g t h e F u t u r e.
1 Renewable Energy Options for the Indian Railways Amit Kumar TERI, New Delhi December 21, 2011.
You currently have no control over ever rising electricity prices Electricity costs have doubled over the last 10 years* What will your electricity bill.
CONFERENCE ON A3: AVAILABILITY, ACCESSIBILITY AND AFFORDABILITY OF POWER IN INDIA The Roadmap to Ensuring Power For All on 06 May 2015, CII-Sohrabji.
“Biomass in our Schools” EPMA Presentation Presented by: April 10, 2013.
A Regulatory Framework for Energy Intensive Industries within the EU Berlin 30 November 2012 Chris Lenon – Green Tax Group BE.
Renewable Energy Support Schemes & Capacity Building Needs Benon Bena Manager, Off-Grid Renewable Energy Development Rural Electrification Agency-Uganda.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 13 Energy Efficiency Module 13: SUPPLY-SIDE MANAGEMENT.
Lamma Power Station Solar Power System. 2 Content Project Background Site Selection Amorphous Silicon Thin Film Photovoltaic System Environmental Benefits.
Is there a market for clean technology SMEs? The opportunity for SMEs in cleantech industries in developing countries James Rawlins, Associate Director.
THIS IS WHAT HAPPENS WHEN YOU DON’T …  Renewable Energy target of generating 3725MW by year i.e.10% current generation  Target is realistic in.
Developing and Integrated Energy Conservation and Renewable Strategy Renewable Energy Leadership Summit June 7, 2005 Lenox, MA.
Solar-Powered Fuel Stations
1 Power – The Wind Way. 2 Windy Years India Currently holds a cumulative capacity of over 21000MW in India. Wind power growth in India has seen various.
Overview of Distributed Generation Applications June 16, 2003 Harrisburg, PA Joel Bluestein Energy and Environmental Analysis, Inc.
Beyond Mandates, Does Green Pave the Way? Marlene Santos Vice President, Customer Service Florida Power & Light Company October 17, 2009.
Realizing Higher Net Operating Income From Solar Rooftops A plan to create sustainable value.
FOR SIXTY YEARS WE HAVE BEEN TAKING THE POWER FROM WATER AND HANDING IT OVER TO NATIONS LINKING THE DOTS Bucharest, February 20, 2014.
Solar panel Mathieu and thomas. What is a solar panel Solar panel refers either to a photovoltaic module, a solar hot water panel, or to a set of solar.
Bill Harrison Cleveland - Akron Chapters Joint Meeting March 16, 2009.
SOLAR ROOF-TOP is A necessity for DELHI METRO DR. MANGU SINGH Managing Director, DMRC.
© Copyright 2013 Clean Energy Collective ® 1 Community Solar Power Overview Prepared For: Talking Green member owned. nature operated.
SOLAR RENTING (PTY) LTD WHY SHOULD A CUSTOMER BUY SOLAR, IF HE CAN RENT? THEY CAN RATHER USE THEIR MONEY TO MAKE MONEY!
Solar energy at Uniworld Gardens 400kW to provide back up power
26 April 2017 Presentation by CYBERMINE INTEGRATED SERVICES PVT LTD.
Solar Energy Ashley Valera & Edrick Moreno Period 6.
Global construction consultants SPENDING WISELY Laurence Brett Partner Davis Langdon LLP.
Entergy Mississippi’s Bright Future Plan & Renewable Energy October 16, 2015 Aaron Hill Entergy Mississippi, Inc.
0 Dr. Peter Frey │ SOLARVALLEY MITTELDEUTSCHLAND │ Paris, 14. April 2011 PV production in Germany - threats & opportunities Dr. Peter Frey, CEO Solar Valley.
BUSINESS STRATEGY AND PLAN 2010 Emerging Energy Solutions 1.
Diesel Generators: Improving Efficiency and Emission Performance in India Shakti Sustainable Energy Foundation Website-
RENEWABLE ENERGY REGULATION IN KENYA KENYA-SPAIN MULTILATERAL PARTNERSHIP MEETING HELD AT CROWNE PLAZA Presented by Caroline Kimathi Asst Manager, Licensing.
WSSC Solar PV PPA Phase 2 Rob Taylor Energy Manager May18, 2016.
Renewable Distributed Generation and Public Water Supply Utilities CWWA/CTAWWA Fall Conference Paul R. Michaud, Esq. October 20, 2015.
How Do You Use Your Real Estate?. Facilities Managers Association of New Mexico The Time For Solar Is Now! April 15, 2015.
EQ Conference Mumbai 22nd Feb 2017 Anjan Ghosh – Ujaas Energy
MELBOURNE RENEWABLE ENERGY PROJECT
Community Solar Dan McIlroy Clean Energy Collective.
“WE EMPOWER A GRAIN OF SAND TO CAPTURE THE POWER OF SUN”
ROOFTOP SOLAR PHOTOVOLTAIC SYSTEM
Market aggregating models – scaling an EE portfolio
Axis Renováveis November 2016 STRICTLY PRIVATE AND CONFIDENTIAL.
Who Is Southern Power? Stephen Gowland Business Development Manager
Hartek Group is one of India’s fastest growing company with offerings that span across Engineering, Renewables, Technology , Construction , Fuel and Manufacturing.
Why Need of Solar Power & Other Renewable Energy Sources.
Solar information Session
Single Axis Tracking.
This presentation uses a free template provided by FPPT.com “Together with Technology ”
Improving Efficiency of Rooftop Solar Power Plants
MELBOURNE RENEWABLE ENERGY PROJECT
Solar Power: Our Future or False Promises?
Net Metering – Solar Roof Top Solution
FIELD LEVEL CHALLENGES FOR SOLAR PARKS IN INDIA
DIMAN Solar Rooftop Solutions Grid Connected
Solar Technologies for Smart Grid Applications
Detail | Customise | Optimise
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Presentation transcript:

Solar Rooftop

The HERO GROUP - OVERVIEW The HERO GROUP - OVERVIEW  Top 10 widely recognized brand in India  Members among the leaders in business:  World’s largest two wheeler manufacturer with over 50 Million two wheelers sold  250 MW renewable power capacity installed across India.  Market Capitalization of over USD 6 Billion.  Global Partnership; over 5,000 business associates and Over 23,000 employees INFRAFINANCE RENEWABLE ENERGY AUTOMOTIVEIT/SERVICESEDUCATION

HERO FUTURE ENERGIES- OVERVIEW  Incorporated in October, 2012, Hero Future Energies Pvt. Ltd. (HFE), is the renewable energy arm of The Hero Group with a focus on Solar, Wind and Hydro. With “Planet Positive Power” as its vision HFE plans to develop Gigawatt scale sustainable, cost-effective Clean Power reducing carbon foot print for a greener planet. Over 200 MW Wind Projects installed across India within 3 years 30MW Plant Commissioned in Madhya Pradesh under National Solar Mission Total 5MW Rooftop Plant Installed in Punjab, Haryana and NCR –(2 MW under Solar Energy Corporation of India) Commissioned One of India’s largest Rooftop Plant 1.5 MW at HMC, Neemrana 12 MW Solar projects under construction WindSolar

OUR PROJECTS Wind Under pipeline Wind Under construction Wind Commissioned Solar Commissioned Solar Under construction

HFE Differentiators: We walk the talk Experienced Team STRENGTHS Customized solutions Design & Engineering Procurement Project Development O & M Reliability HFE Multi disciplinary team exposure in various Renewable verticals and across functions. Ability to customize solution as per the requirement of user and state of the art performance monitoring solutions In house team for complete design and engineering Partnership with top consultants in renewable sector Relationship with global suppliers across technologies and value chain O&M support for project life Realistic site assessment Top-notch Workmanship Timely completion Quality execution.

Why Solarize? Government Mandate: Comply with HAREDA order for Mandatory Solar Good Payback Period: Solar panel prices have dropped in last 2 years, system cost all time low Maintenance Friendly: Very Low O&M cost ! No moving parts ! Easy Monitoring: User friendly system ! Online monitoring ! Cost Saving & Cash Flow: Save on Electricity Bill and take advantage of “Net Metering” policy Free Cash Flow after breakeven Tax Saving: Save on taxes with Accelerated Depreciation Low Expenses: Easy training ! 25 yrs module warranty ! Fixed Insurance cost ! Risk: Free fuel ! No commodity risk ! Module Output Guarantee ! Vendor Warranties ! Reliability: No more grid fluctuations ! Module Performance Guarantee! Predictable energy generation! Minimal Variability ! Bank energy with battery if required ! Low Risk Technology ! Low Risk Investment !

Rooftop Grid Connected System Shadow free space required* on RCC roof: sq.m/ kWp (Poly crystalline module) Shadow free space Required* on industrial shed: 11 sq.m / kWp (Poly crystalline module) Space required can vary depending on roof profile and shadow from vicinity In case of space constraint we can provide solutions with highly efficient modules as well

How to Start? Site Survey by HFE and General Discussion Submission of Techno- Commercia l Proposal by HFE Release of Work Order by Customer Detailed Engineerin g Engineerin g Drawing/M ake Approval from customer Material Supply/ Project Execution/ Approvals & Permits Commissio ning & Testing O&M Work Day-1 Day-10 Day-15 Day-45 Day-55 Day-100 Day-120 Zero Day Typical Time frame* for 100kWp system * Time frame varies based on selected equipment and system size Consultation & AssessmentDesign, Engineering Installation Monitoring & Maintenance

80Kwp Solar Rooftop on RCC Roof

1460 KWp on Inverted Bracing Structure

250KWp- Installation on Industrial Rooftop

30MW Ground Mounted Solar Plant in M.P.

 Industrial Shed at many locations is still Asbestos Asbestos is carcinogenic. Fumes are released when the sheet is punctured for installing clamps/structure. Asbestos sheds are fragile in nature so chances of sheets break during installation of panels or during maintainence  Tilt angle in Industrial Sheds For achieving bet yield tilt angle should be close to the latitude of the location. In Industrial sheds, the tilt is the same as the inclination of the shed which is usually about 8 degrees, less than latitude and thus decreases yield. Another challenge is that if we don’t keep the panels in same angle as the roof then we won’t be able to sustain wind loads  Directions For achieving best yield, panel have to be installed in south facing direction, south-facing roof is not available at most of the places.  Shadow free roof Shadow of tall building adjacent to the location may not allow good capacity to be installed. So planning for solar can be difficult. Also people usually have HVAC, Tank on rooftop that limits the space, especially in RCC roofs. Challenges in Rooftop

 For industrial sheds customers tend to go for the system phase wise This limits the benefit of economies of scale resulting to higher prices and also higher tariffs in RESCO model  Lack of Net Metering policy implementation As most rooftop solar is for captive consumption, during holiday season when load is low the extra energy goes to the grid, which changes the grid meter value To avoid this either net metering is required or one has to provide reverse current protection which increase the system cost by at least 3 Rs/Wp.  Implementing battery-based off grid system is not very economically viable due to high cost of batteries.  Remote monitoring system cannot be implemented in small systems less than <25 kWp as high cost of these make it not so attractive and commercially viable.  People are waiting for government subsidies to install rooftop solar despite MNRE instructions. The subsidy point needs to be clearly addressed. Challenges in Rooftop

Key Vendors

Key Clients

THANK YOU