Objectives After completing this chapter, you will be able to:

Slides:



Advertisements
Similar presentations
Aggregate Planning.
Advertisements

EYYUP ORAK Material requirements planning (MRP) is a computer-based inventory management system designed to assist production managers in.
OPERATIONS MANAGEMENT INTEGRATING MANUFACTURING AND SERVICES FIFTH EDITION Mark M. Davis Janelle Heineke Copyright ©2005, The McGraw-Hill Companies, Inc.
Manufacturing’s Objectives
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Resource Planning Chapter 14.
Chapter 8 Aggregate Planning in a Supply Chain
Concepts in Enterprise Resource Planning Fourth Edition
Chapter 9 Capacity Planning 2000 by Prentice-Hall, Inc.
M ERP (Enterprise Resources Planning) M ERP (Enterprise Resources Planning) Session 6 Production and Operation Information System Ir. Ekananta.
Concepts in Enterprise Resource Planning 4th Edition
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
Production Logistics and ERP
© Prentice Hall, 2005: Enterprise Resource Planning, 1 st Edition by Mary Sumner 6-1 Enterprise Resource Planning, 1 st Edition by Mary Sumner Chapter.
Production Planning Dr. Everette S. Gardner, Jr..
Operations Planning Horizons
MATERIAL REQUIREMENTS PLANNING (MRP) AND ERP Chapter 14 1.
Production planning and control is the organization and planning of the manufacturing process. It co-ordinates supply and movement of materials and labor,
Production and supply chain process MIS2101: Management Information Systems Based on material developed by C.J. Marselis.
Production and supply chain process MIS2101: Management Information Systems Based on material developed by C.J. Marselis.
Manufacturing Planning and Control
Production Overview A production plan answers two questions:
Concepts in Enterprise Resource Planning Third Edition Chapter Four Production and Supply Chain Management Information Systems.
Aggregate Planning and Master Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior.
Aggregate Planning and Resource Planning Chapters 13 and 14.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 14 MRP and ERP.
Chapter 4. Chapter 4 Learning Objectives Describe steps in the production planning process of a high volume manufacturer like Fitter Snacker Describe.
Aggregate Planning, MRP, and Short Term Scheduling 9 Aug 2001.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 13 Aggregate Planning.
1 Week 8: Production and Supply Chain Process MIS2101: Management Information Systems.
OM4-1Aggregate Planning Chapter 14. OM4-2Aggregate Planning Planning Horizon Aggregate planning: Intermediate-range capacity planning, usually covering.
Operations Management
Aggregate Planning.
MANGT 660 (A): Supply Chain Planning and Control Chapter 4 Master Production Scheduling (1/2)
Concepts in Enterprise Resource Planning 4th Edition Chapter three Production and Supply Chain Management Information Systems 1Concepts in Enterprise Resource.
Business Functions, Processes, and Data Requirements
1 MRP: Based on Dependent Demand u This chapter explores: –Master production schedule –Material Requirements Planning (MRP) »System structure »Example.
1 MRP and ERP Chapter Transparency on aggregate to master plan.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 Aggregate Planning and Master Scheduling
CHAPTER 8 CAPACITY. THE CONCEPT Maximum rate of output for a process Inadequate capacity can lose customers and limit growth while excess capacity can.
Aggregate Planning and Resource Planning Chapters 13 and 14.
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
Concepts in Enterprise Resource Planning Third Edition Chapter Four Production and Supply Chain Management Information Systems.
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
Capacity Planning Pertemuan 04
Lecture 3 Production Planning System Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,
Copyright © 2014 by McGraw-Hill Education (Asia). All rights reserved. 13 Aggregate Planning.
Chapter 13 Aggregate Planning.
Lecture 5 Master Product Scheduling Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College, Emeritus,
Aggregate Planning and Master Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior.
14-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Aggregate Planning. Session Break Up Aggregate Planning Master Production Schedule.
© 2008 Prentice Hall, Inc.14 – 1 Operations Management Chapter 14 – Material Requirements Planning (MRP) and ERP PowerPoint presentation to accompany Heizer/Render.
MIS Topic # 2 1 Demand Management. MIS Topic # 2 2 Definitions: Demand Management: the function of recognizing and managing all demands for.
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
CONCEPTS IN ENTERPRISE RESOURCE PLANNING FOURTH EDITION Chapter Four Production and Supply Chain Management Information Systems.
EVOLUTION OF ERP 1960’s - Systems Just for Inventory Control 1970’s - MRP – Material Requirement Planning (Inventory with material planning & procurement)
Visual 3-1 Sales and Operations Planning Purpose of Sales and Operations Planning General Design of Sales and Operations Planning Approaches to Sales and.
Production Planning.  What to produce  When to produce  How to produce.
Concepts in Enterprise Resource Planning 4th Edition Chapter Four Production and Supply Chain Management Information Systems 1Concepts in Enterprise Resource.
Enterprise Resource Planning, 1st Edition by Mary Sumner
Production Planning Activities
Master Production Scheduling (MPS)
Concepts in Enterprise Resource Planning Third Edition
Chapter 14 Aggregate Planning.
Operations Management
Chapter 5 Master Production Scheduling
13 Aggregate Planning.
14 MRP and ERP.
Dr Sh Salleh bin Sh Ahmad
Enterprise Resource Planning, 1st Edition by Mary Sumner
Presentation transcript:

Objectives After completing this chapter, you will be able to: Describe the steps in the production planning process of a high-volume manufacturer such as Fitter Snacker Describe Fitter Snacker’s production and materials management problems Describe how a structured process for Supply Chain Management planning enhances efficiency and decision making Describe how production planning data in an ERP system can be shared with suppliers to increase supply chain efficiency 1

Production Overview To meet customer demand efficiently, Fitter Snacker must: Develop a forecast of customer demand Develop a production schedule to meet the estimated demand ERP system is a good tool for developing and executing production plans Goal of production planning is to schedule production economically

Production Overview (cont’d.) Three general approaches to production Make-to-stock items: made for inventory (the “stock”) in anticipation of sales orders Make-to-order items: produced to fill specific customer orders Assemble-to-order items: produced using a combination of make-to-stock and make-to-order processes

Capacity Planning Capacity planning is a long-term strategic decision that establishes a firm's overall level of resources. long time horizon: usually a year or more for building new facilities or acquiring new businesses. Capacity decisions affect product lead times, customer responsiveness, operating costs, and a firm's ability to compete. Inadequate capacity can lose customers and limit growth. Excess capacity can drain a company's resources and prevent investments in more lucrative ventures. When to increase capacity and how much to increase capacity are critical decisions.

Strategy of Timing Capacity Expansion Capacity lead strategy. Capacity is expanded in anticipation of demand growth. This aggressive strategy is used to lure customers from competitors who are capacity constrained or to gain a foothold in a rapidly expanding market. Capacity lag strategy. Capacity is increased after an increase in demand has been documented. This conservative strategy produces a higher return on investment but may lose customers in the process. It is used in industries with standard products and cost-based or weak competition. The strategy assumes that lost customers will return from competitors after capacity has expanded. Average capacity strategy. Capacity is expanded to coincide with average expected demand. This is a moderate strategy in which managers are certain they will be able to sell at least some portion of the additional output.

Factors Affecting Capacity Expansion How much to increase capacity depends on the volume and certainty of anticipated demand; strategic objectives in terms of growth, customer service, and competition; and the costs of expansion and operation. Capacity can be increased incrementally Incremental expansion is less risky but more costly. An attractive alternative to expanding capacity is outsourcing, in which suppliers absorb the risk of demand uncertainty.

The Production Planning Process Three important principles for production planning: Work from sales forecast and current inventory levels to create an “aggregate” (“combined”) production plan for all products Break down aggregate plan into more specific production plans for individual products and smaller time intervals Use production plan to determine raw material requirements

The SAP ERP Approach to Production Planning Figure 4-2 The production planning process Concepts in Enterprise Resource Planning, Third Edition

Production Planning and Control Production Planning is one of the main function of a production Manager. This is concerned with determining the QUANTITY and TIMING of production for the FUTURE. Isn’t it DIFFICULT! Production manager try to determine the BEST way to meet forecasted demands by: Adjusting production rates Adjusting manpower levels Inventory levels Overtime works subcontracting

Decision-making in Operations Management Operations managers are decision makers. What makes the difference between a Good Decision and a Bad Decision? “Good’ decision = logic + Data + Alternatives Steps Define the problem and the factors that influence it Establish decision criteria and goals Formulate a model (relation between goals and variables) Identify and evaluate alternatives Select BEST alternative Implement the decision

Problem ? Quantitative Analysis Logic Historical Data Market research Scientific analysis Modeling Decision Problem ? Qualitative Analysis Emotions Intuition Personal experiences Rumors

The Planning Process Planning Short Term Medium Term (begins once long term capacity decisions are made. Monthly and quarterly plans, AGGREGATE PRODUCTION PLAN – related to operation managers – Tactical Scheduling decisions) Long Term (Facility Location and expansion, New product development, Research funding, investment over several years, strategic issues – related to Top Management)

Master Production Scheduling (MPS) Objectives Determine the quantity and timing of completion of end items over a short-range planning horizon. Schedule end items (finished goods and parts shipped as end items) to be completed promptly and when promised to the customer. Avoid overloading or under loading the production facility so that production capacity is efficiently utilized and low production costs result.

Time Fences The rules for scheduling 6+ weeks 4-6 weeks 2-4 weeks 1-2 +/- 20% Change 1-2 weeks +/- 10% Change +/- 5% Change No Change Frozen Firm Full Open

Detailed Scheduling Detailed plan of what is to be produced, considering machine capacity and available labor One key decision in detailed production scheduling How long to make the production runs for each product Production run length requires a balance between setup costs and holding costs to minimize total costs to the company

Detailed Scheduling (cont’d.) Fitter Snacker uses repetitive manufacturing Repetitive manufacturing environments usually involve production lines that are switched from one product to another similar product Production lines are scheduled for a period of time, rather than for a specific number of items

Detailed Scheduling (cont’d.) Production runs should be decided by evaluating the cost of equipment setup and holding inventory Integrated information system simplifies this analysis Automatically collects accounting information that allows managers to better evaluate schedule trade-offs in terms of costs to company

Materials Requirements Planning (MRP) Determines required quantity and timing of the production or purchase of subassemblies and raw materials needed to support MPS Bill of material (BOM): list of the materials (including quantities) needed to make a product

Materials Requirements Planning (MRP) Figure 4-16 The bill of material (BOM) for Fitter Snacker’s NRG bars

Materials Requirements Planning (MRP) Lead times and lot sizing Lead time: cumulative time required for the supplier to receive and process the order, take the material out of stock, package it, load it on a truck, and deliver it to the manufacturer Lot sizing: determining production quantities and order quantities MRP record: standard way of viewing the MRP process on paper

Materials Requirements Planning (MRP) (cont’d.) Figure 4-17 The MRP record for oats in NRG bars, weeks 1 through 5

Production – Inventory System Information Flow Material Flow Days for transit time Days to process or to handle and issue orders 25 Day De- 5 Day Delay 25 Day Delay 13 Day Delay lay to sense to sense for Review for Review needs, place needs, place and and and transmit and transmit Transmission Transmission orders M.O.s of orders of orders Demand Raw Factory Factory Distributor Retail Ultimate Material Warehouse Inventory Inventory Customer Vendor 50 Independent 500 Independent Distributors Retailers # # 35 4 2 1 30 1 10 5 1 Company System Under Managerial Control Production Planning Dynamo.xls